Building permits
- Alteration, filed Sep 16, 2026, estimated cost $140K, described as “Reconfigure Storage Arrangement. No change to building footprint, occupancy, or use.”
- Alteration, filed Mar 21, 2025, estimated cost $126K, described as “Reconfigure Storage Arrangement. No change to building footprint, occupancy, or use.”
- Alteration, filed Mar 21, 2025, estimated cost $25K, described as “Cut back existing sprinkler heads serving lower storage units that are no longer needed. Cut and Cap piping only. No new sprinkler heads or piping to be installed.”
- Alteration, filed Oct 15, 2024, estimated cost $18K, described as “Cut back existing sprinkler heads serving lower storage units that are no longer needed. Cut and cap piping only.”
- Alteration, filed Oct 15, 2024, estimated cost $126K, described as “Reconfigure Storage Arrangement. No change to building footprint, occupancy, or use.”
- Alteration, filed Dec 2, 2022, estimated cost $31K, described as “Erect illuminated accessory business wall sign; copy reading "public storage"”
- Alteration, filed Jul 12, 2022, estimated cost $1K, described as “Installation of overhead protection on 3RD, 5TH, and 6TH floor throughout construction. No change in egress, use, or occupancy.”
- Alteration, filed Mar 31, 2022, estimated cost $1K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2022, estimated cost $1K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2022, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 24, 2022, estimated cost $1K, described as “Installation and use of concrete placing boom as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 24, 2022, estimated cost $1K, described as “Installation and use of temporary material platforms as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 18, 2022, estimated cost $1K, described as “Installation of temporary personnel material hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 9, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 21, 2022, estimated cost $1K, described as “Filing herewith for underground plumbing for water sanitary piping as per plans filed herewith, filed in-conjunction with application numbers M00447245-I1 and 121208433”
- Alteration, filed Sep 27, 2021, estimated cost $1K, described as “Filing herewith for a generator as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 12, 2021, estimated cost $5K, described as “Installation of plywood fence as per drawings. Plywood fence shall comply with chapter #33 of the NYCBC. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 10, 2021, estimated cost $1K, described as “Installation of new temp standpipe filing as per plans filed herewith”
- Alteration, filed Apr 30, 2021, estimated cost $1K, described as “Modification to existing mechanical system as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 22, 2021, estimated cost $980, described as “New installation of plumbing/sprinkler & standpipe system as per plans filed herewith. No changein use, egress or occupancy. Filing in conjuction with new building application #121208433.”
- Alteration, filed Jan 29, 2021, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Dec 18, 2020, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Dec 2, 2020, estimated cost $6K, described as “Removal of sprinkler system in the cellar, and floors 001-003. No change to use, egress, or occupancy.”
- Alteration, filed Dec 2, 2020, estimated cost $10K, described as “Removal of sprinkler system from cellar, mezzanine, 001-003. No change to use, egress, or occupancy.”
- Alteration, filed Nov 24, 2020, estimated cost $5K, described as “Nstallation of heavy duty sidewalk shed & pipe scaffold as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed & pipe scaffold to comply with chapter 33 of building code of 2014”
3 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $14,483,700
- 2026–27 tax
- $1,448,429
- Market value (city estimate)
- $32,186,000
- Taxable value
- $13,352,040
- Assessed land
- $2,317,050
- Assessed improvements
- $12,166,650
Zoning
M1-9A/R12: floor area ratio 10.72 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Mar 25, 2021: $36,500,000, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning map change, Zoning text change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
In the news
Public Storage Facility Completes Construction at 155 West 29th Street in Chelsea, Manhattan, New York YIMBY, Aug 30, 2023.