130 West 30th Street, Manhattan
Condominium · 45 units · built c. 1928 · Block 805, Lot 7501.
Building permits
- Alteration, filed Dec 10, 2025, estimated cost $3K, described as “Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 7, 2025, estimated cost $1K, described as “Filing herewith sprinkler drawings showing modification to existing sprinkler system inside Apt. 17A, as per plans submitted. No change in Use, Egress or Occupancy under this application.”
- Alteration, filed Sep 18, 2025, estimated cost $3K, described as “Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 26, 2025, estimated cost $80K, described as “FISP Repairs which includes repairs for brick, terracotta, stone, stucco and cast iron. No change in use, egress or occupancy.”
- Alteration, filed Aug 18, 2025, estimated cost $3K, described as “Installation of a temporarily supported scaffold and site-specific engineered enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 13, 2025, estimated cost $3K, described as “Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 11, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Jul 10, 2025, estimated cost $3K, described as “Installation of a temporary shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Jul 7, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 23, 2025, estimated cost $16K, described as “FIling herewith drawings showing replacement of plumbing fixtures in Apt 17A, as per plans submitted. No change in Use, Egress or Occupancy under this application.”
- Alteration, filed Jun 23, 2025, estimated cost $200K, described as “Filing herewith plans showing interior renovation work in Apt 17A as per plans submitted. No change in Use, Egress or Occupancy under this application.”
- Alteration, filed Jan 21, 2025, estimated cost $190K, described as “Provide new guard rail at equipment access areas, and modify select existing guard rails . No change in use, egress or occupancy.”
- Alteration, filed Apr 5, 2024, estimated cost $155K, described as “Filing to replace existing ventilation units .”
Building history
- Alteration, filed Jul 22, 2013, signed off Feb 21, 2018, described as “Filing change of use alteration to change occupant load and establish classrooms and assembly use”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $19,127,256
- 2026–27 Tax
- $1,666,941
- Market value (city estimate)
- $42,504,995
- Taxable value
- $15,275,935
- Assessed land
- $3,072,155
- Assessed improvements
- $16,055,101
- Condo units with their own tax lots
- 66
Tax breaks
- Nonprofit exemption (house of worship), with no end date, about $388,760 a year below the full tax.
- Co-op and Condo Abatement, with no end date, a $228,140 credit this tax year.
Zoning
M1-9A/R12: floor area ratio 13.64 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 22, 2026: $4,995,000, Apt 18A
- Feb 19, 2026: $125,000, Apt STR12
- Jan 21, 2026: $1,878,215, Apt 4C
- Dec 3, 2025: $2,250,000, Apt 3B
- Oct 23, 2025: $2,999,999, Apt 19A
- Oct 10, 2025: $1,800,000, Apt 5C
- Jul 31, 2025: $2,300,000, Apt 11C
- May 28, 2025: $2,240,000, Apt 10C
- Dec 9, 2024: $2,807,000, Apt 17A
- Oct 17, 2024: $2,295,000, Apt 12C
The 10 most recent of 27 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of 130 West 30th Street Building (Individual Landmark). 23 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- Change to an Earlier Grant (Board of Standards and Appeals 362-62-A): Change to an Earlier Grant, Granted, filed May 20, 1998, decided Nov 24, 1998. Reopening for an extension of the term of variance which expired May 2, 1998.
- 130 W30TH ST (City Planning P2002M0248): Completed, decided Apr 14, 2003. 02DCP042M: SPECIAL PERMIT PURSUANT TO ZR SECTION 74-711 TO ALLOW A RESI DENTIAL USE IN AN M1-6 DISTRICT
- 130 E3OTH ST BLDG (City Planning P2002M0137): Completed, decided Mar 4, 2002. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 616