100 West 33rd Street, Manhattan
Commercial · built 2001 · Block 808, Lot 40.
Building permits
- No Work, filed Nov 19, 2026
- No Work, filed Oct 26, 2026, described as “Convention, with lecture rooms, lounges, and exhibitions. In vacant mall retail spaces.”
- Alteration, filed Oct 2, 2026, estimated cost $213K, described as “Structural Modifications as per plans filed herewith.”
- Alteration, filed Sep 30, 2026, estimated cost $15K, described as “Modifications to the standpipe systems as per plans filed herewith. No change in use, occupancy, or egress.”
- Alteration, filed Sep 30, 2026, estimated cost $9K, described as “Temporary platforms Advertising Week events in the vacant retail spaces. Removed at the end of the programing. No changes to existing structures, use or egress”
- Alteration, filed Sep 30, 2026, estimated cost $7.0M, described as “Interior renovation as per plans filed herewith. No change of use, occupancy, or egress”
- No Work, filed Sep 30, 2026, described as “Convention for advertisers, with lecture rooms, lounges, and exhibitions. In vacant mall retail spaces.”
- Alteration, filed Sep 30, 2026, estimated cost $250K, described as “Modification to Plumbing and sprinkler systems as per plans filed herewith.”
- Alteration, filed Sep 24, 2026, estimated cost $1.8M, described as “Modification to Mechanical Systems as per plans filed herewith”
- Alteration, filed Aug 11, 2026, estimated cost $7K, described as “Demo modification to Mechanical Systems as per plans filed herewith”
- Alteration, filed Aug 11, 2026, estimated cost $10K, described as “Plumbing and Sprinkler Interior demo as per plans filed herewith.”
- Alteration, filed Aug 4, 2026, estimated cost $202K, described as “Interior demo as per plans filed herewith. No change in use, occupancy, or egress.”
- Alteration, filed Jun 29, 2026, estimated cost $77K, described as “GMS & Tech - Construction work on the 11th floor as indicated on drawings.”
- Alteration, filed Jun 29, 2026, estimated cost $32K, described as “GMS & Tech - Plumbing work on the 11th floor as indicated on drawings.”
- Alteration, filed Jun 29, 2026, estimated cost $36K, described as “GMS & Tech - Mechanical work on the 11th floor as indicated on drawings.”
- Alteration, filed Jun 29, 2026, estimated cost $4K, described as “GMS & Tech - Sprinkler work on the 11th floor as indicated on drawings.”
- Alteration, filed Apr 22, 2026, estimated cost $730K, described as “Construction of non-load bearing 2-hour partitions and opening protectives to enclose new proposed place of assembly. Change in floor occupant load from 852 to 689 people. Place of assembly and tenant fit-out applications to be filed…”
- Alteration, filed Apr 20, 2026, estimated cost $18K, described as “Modification to Plumbing systems as per plans filed herewith.”
- Alteration, filed Jan 26, 2026, estimated cost $5K, described as “Relocating fire hose cabinet on 4th floor.”
- Alteration, filed Jan 21, 2026, estimated cost $10K, described as “Replacement of water cooled air conditioning unit for the IDF Room on the 5th Floor. No change in use egress and occupancy.”
- Alteration, filed Jan 8, 2026, estimated cost $1.3M, described as “Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy, or egress”
- Alteration, filed Dec 29, 2025, estimated cost $1.1M, described as “Interior renovation as per plans filed herewith. No change of use, occupancy, or egress”
- Alteration, filed Dec 29, 2025, estimated cost $139K, described as “Modification to sprinkler systems as per plans filed herewith. No change in use, occupancy or egress.”
- No Work, filed Nov 14, 2025, described as “Holiday vendors across vintage, design, fashion, art, and home goods, in the vacant retail mall areas.”
- Alteration, filed Nov 12, 2025, estimated cost $10K, described as “Installation of 2 ton air conditioning unit on the 7th Floor. No change in use egress and occupancy.”
71 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $145,355,400
- 2026–27 Tax
- $15,768,154
- Market value (city estimate)
- $323,012,000
- Taxable value
- $145,355,400
- Assessed land
- $35,370,000
- Assessed improvements
- $109,985,400
Zoning
C6-6: floor area ratio 14.00 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- 15 Penn Plaza Special Permit Renewal II (City Planning P2017M0432): Completed. Second renewal of two special permits granted in 2010 for bulk modifications and a bonus for subway improvements at 15 Penn Plaza.
- 15 PENN PLAZA (City Planning P2010M0028): Completed, decided Aug 31, 2010. 09DCP019M: PROPOSES TO REDEVLOP THE CURRENT SITE OF THE HOTEL PENNSYLVA NIA WITH A NEW COMMERCIAL OFFICE BUILDING
- 15 PENN PLAZA (City Planning P2010M0153): Completed, decided Aug 31, 2010. ACQ PERMANENT EASEMENTS TO CONSTRUCT TRANSIT ENTRANCES (RELATED TO: 100048 ZRM, 100049 ZSM, 100050 ZSM)
- WEST 32ND STREET BRIDGE (City Planning P1989M0882): Completed, decided Feb 22, 1991. RENEWAL OF REVOCABLE CONSENT TO CONTINUE TO MAINTAIN EXIST-*ING BRIDGE OVER & ACROSS W32ND ST BRIDGE TO BE USED FOR*FOR STORAGE PURPOSES