1411 Broadway, Manhattan
Commercial · built 1969 · Block 815, Lot 1.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Oct 27, 2026, estimated cost $30K, described as “Modifications to the existing Sprinkler System: Remove (206) existing sprinkler heads and Install (41) new sprinkler heads and associated Sprinkler Piping on the 12th Floor as per plans (Hines - Demo, Corridor & Restrooms.)”
- Alteration, filed Oct 27, 2026, estimated cost $459K, described as “Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floor as per plans (LL Work - Demo, Corridor & Restroom.) No change to use, egress or occupancy.”
- Alteration, filed Oct 27, 2026, estimated cost $98K, described as “Removal of existing plumbing fixtures and install new bathroom fixtures and associated piping on the 12th Floor as per plans. (Hines - Demo, Corridor & Restrooms.) No change to use, egress or occupancy.”
- Alteration, filed Oct 27, 2026, estimated cost $51K, described as “Modifications to the existing HVAC System: Remove ductwork, piping and equipment back to building core on the 12th Floor as per plans (Hines - Demo, Corridor & Restroom) No change to use, egress or occupancy.”
- Alteration, filed Oct 19, 2026, estimated cost $32K, described as “Installation of pipe scaffolding as per plans. Pipe scaffold shall comply with chapter # 33 of the 2022 code, no changess in use in egress or occupancy under this application.”
- Alteration, filed Jun 2, 2026, estimated cost $302K, described as “Parking Structure Repair Program. No change to use, occupancy or egress.”
- Alteration, filed May 12, 2026, estimated cost $25K, described as “Sprinkler temp loop as per plans”
- Alteration, filed May 12, 2026, estimated cost $5K, described as “Installation and use of fence/barrier as per plans filed herewith.”
- Alteration, filed May 7, 2026, estimated cost $45K, described as “Structural filing as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 7, 2026, estimated cost $6.1M, described as “Installation of non load bearing partitions as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 6, 2026, estimated cost $775K, described as “Plumbing/sprinkler application as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 6, 2026, estimated cost $2.0M, described as “Mechanical filing as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 3, 2026, estimated cost $5K, described as “Use of temporary platform/material hoist as per plans filed herewith.”
- Alteration, filed Mar 20, 2026, estimated cost $23K, described as “Modifications to the existing Sprinkler System: Remove (189) sprinkler heads and Install (38) new temporary and (5) new concealed sprinkler heads and associated Sprinkler Piping on the 30th Floor as per plans (Hines - Demo, Whitebox &…”
- Alteration, filed Mar 20, 2026, estimated cost $31K, described as “Modifications to the existing HVAC System: Remove ductwork, piping and equipment back to building core on the 30th Floor as per plans (Hines - Full Floor Demo & Whitebox.) No change to use, egress or occupancy.”
- Alteration, filed Mar 20, 2026, estimated cost $132K, described as “Removal of existing plumbing fixtures and Install (2) urinals, (8) water closets, (9) lavatories, (1) HWH and associated CW/sanitary piping on the 30th Floor as per plans. (Hines - Demo, Whitebox Restrooms.) No change to use, egress or…”
- Alteration, filed Mar 13, 2026, estimated cost $15K, described as “Filing herewith standpipe work at existing 7th floor space. No change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2026, estimated cost $510K, described as “Filing herewith mechanical work on existing 7th floor space, United Health Fund. No change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2026, estimated cost $68K, described as “Filing herewith plumbing work to existing 7th floor space. No change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2026, estimated cost $103K, described as “Filing herewith sprinkler work on existing 7th floor space. No change in use, egress or occupancy.”
- Alteration, filed Mar 9, 2026, estimated cost $5K, described as “Modifications to the existing HVAC System on the 10th Floor as per plans (Hines - ADA Restrooms.) No change to use, egress or occupancy.”
- Alteration, filed Mar 9, 2026, estimated cost $3.4M, described as “Filing herewith interior renovation on existing 7th floor space, United Hospital Fund. No change in use, egress or occupancy.”
- Alteration, filed Mar 4, 2026, estimated cost $32K, described as “Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 10th Floor as per plans (Hines - ADA Restroom.) No change to use, egress or occupancy.”
- Alteration, filed Feb 26, 2026, estimated cost $391K, described as “Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor as per plans (Hines - Demo, Whitebox & Bathrooms.) No change to use, egress or occupancy.”
- Alteration, filed Feb 25, 2026, estimated cost $20K, described as “Plumbing Modifications: Install (1) Water Closet, (1) Lavatory, (1) Funnel drain and associated CW/Sanitary piping on the 10th Floor as per plans. (Hines - ADA Restrooms.) No change to use, egress or occupancy.”
150 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $163,948,050
- Assessed land
- $72,000,000
- Assessed improvements
- $91,948,050
Zoning
C5-3: floor area ratio 21.43 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- 1411 Broadway (POPS redesign) (City Planning P2014M0060): Certification, Completed, decided Apr 1, 2015. Chair certifications for design changes to an existing plaza and the placement of an open air café pursuant to 37-625 and 37-73(c) respectively, located at 1411 Broadway, CD 5, Manhattan.
- 137 W 139ST (City Planning P1983M0205): Completed, decided Aug 18, 1983. P&P-HOUSING FOR THE ELDERLY-FORMERLY P.S 139