27 West 24th Street, Manhattan
Commercial · built c. 1907 · Block 826, Lot 19.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- No Work, filed Oct 20, 2026
- Alteration, filed Oct 20, 2026, estimated cost $100K, described as “Mechanical work on the first floor, cellar, and roof as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 16, 2026, estimated cost $45K, described as “Installation of new steel dunnage platform at the rear yard of the 2nd floor. No chnage in use, occupancy or egress.”
- Alteration, filed Jul 20, 2026, estimated cost $10K, described as “Sign installation as per plans filed herewith. No change to use, egress, or occuoancy”
- Alteration, filed Jul 16, 2026, estimated cost $350K, described as “Plumbing modifications at 1st floor & cellar restaurant space: remove, cap, relocate, replace, & install fixtures/kitchen equipment connections, including water, sanitary, grease waste, vent, gas piping as per plans. No change in use,…”
- Alteration, filed Jul 16, 2026, estimated cost $1.2M, described as “Interior renovation in the cellar and first floor as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 10, 2025, estimated cost $131K, described as “Application is filed for removal of non-load bearing partitions, ceiling, flooring, finishes, and plumbing equipment. No change to use, egress, or occupancy.”
- No Work, filed Nov 28, 2023
- Alteration, filed Aug 18, 2022, estimated cost $110K, described as “Interior demolition of existing non-bearing gyp. bd. partitions. Installation of new non-bearing gyp. bd. partitions, doors, frames, flooring & finishes as per approved drawings. No change in use, occupancy or egress.”
- Alteration, filed May 5, 2022, estimated cost $64K, described as “Modification of existing mechanical system as shown on drawings. Mno change to use, egress or occupancy.”
- Alteration, filed May 5, 2022, estimated cost $20K, described as “Modification of existing sprinkler system on first floor as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Mar 31, 2022, estimated cost $130K, described as “Install plumbing fixtures on the first floor as shown in drawings. No change to use, egress, or occupancy.”
- Alteration, filed Feb 3, 2022, estimated cost $333K, described as “Replace storefront on 1ST floor and minor interior demo as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Feb 3, 2022, estimated cost $5K, described as “Install construction fence as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Dec 9, 2021, estimated cost $173K, described as “Interior demolition of existing non-bearing gyp. bd. partitions, doors & frames. Installation of new non-bearing gyp. bd. partitions, door, frames, flooring and finishes. No change in use, occupancy or egress”
- Alteration, filed Aug 29, 2021, estimated cost $38K, described as “Interior demolition of existing office non-bearing gyp. bd. partitions. Installation of new non-bearing gyp. bd. partitions, door, frames, flooring and finishes. No change in use, occupancy or egress”
- Alteration, filed Jul 31, 2021, estimated cost $8K, described as “Interior demolition of existing office non-bearing gyp. bd. partitions on partial floors 3, 7, 8 & 11. Installation of new non-bearing gyp. bd. partitions. No change in use, occupancy or egress”
- Alteration, filed Nov 27, 2019, estimated cost $26K, described as “Filing herewith drawings indicating the modification of the existing sprinkler system. No change in use, egress, or occupancy under this application.”
Building history
- Alteration, filed Apr 11, 2019, plan exam - approved, stories 11 to 12, described as “Adding 12TH floor, new partitions, extending stairs and installing new elevator for this floor. Replace and relocate existing bathrooms at 11TH floor.10 th floor partial ceiling”
- Alteration, filed Jul 29, 2004, permit issued - entire job/work, described as “Change of use at the cellar to an eating and drinking establishment use group 12 with general construction, plum bing & mechanical work as per plan.”
- Alteration, filed Sep 6, 1996, permit issued - entire job/work, described as “No work under this application. Reduce occupancy on cellar and first floor as per plans.”
- Alteration, filed May 10, 1991, signed off Nov 7, 2001, described as “Create new eating/drinking establish- ment u.g.12A on 1ST. Floor. New offices, kitchen & bathrooms at cellar. G.c. With plumbing, mecanical,strucural at 1ST. Floor and cellar.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $16,029,000
- 2026–27 Tax
- $1,577,761
- Market value (city estimate)
- $35,620,000
- Taxable value
- $14,529,520
- Assessed land
- $4,356,000
- Assessed improvements
- $11,673,000
Zoning
M1-8A/R11: floor area ratio 9.53 built, 12.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- Flatiron BID Expansion (City Planning 2021M0260): Business Improvement District, Completed, filed Nov 30, 2020, decided May 19, 2021. An application from the Small Business Services (SBS) on behalf of the Flatiron Business Improvement District (BID) to modify the existing plan and expand the BID in Community Districts 4 and 5 of Manhattan.