1115 Broadway, Manhattan
Commercial · built c. 1914 · Block 826, Lot 46.
Building permits
- Alteration, filed Sep 3, 2026, described as “Outriggers system installation for facade repairs, no change in use, egress, or occupancy.”
- Alteration, filed Mar 5, 2026, described as “Application for the installation and use of suspended scaffold for facade repair and inspection as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Jul 17, 2025, described as “Application for the installation and use of suspended scaffold for facade repair and inspection as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Jan 8, 2025, estimated cost $450K, described as “Mechanical work on the 5th floor (6th floor CO) (The Lab) as indicated on drawings.”
- Alteration, filed Jan 8, 2025, estimated cost $30K, described as “Sprinkler work on the 5th floor (6th floor CO) (The Lab) as indicated on drawings”
- Alteration, filed Jan 8, 2025, estimated cost $100K, described as “Plumbing work on the 5th floor (6th floor CO) (The Lab) as indicated on drawings”
- Alteration, filed Dec 19, 2024, estimated cost $500K, described as “Construction work on the 5th floor (6th floor CO) (The Lab) as indicated on drawings”
- Alteration, filed Aug 7, 2024, estimated cost $500K, described as “Interior alterations to existing commercial space. No change to use, occupancy or egress”
- Alteration, filed Apr 24, 2024, estimated cost $25K, described as “Mechanical work on the 5th and 9th floor (bathrooms) as indicated on drawings.”
- Alteration, filed Apr 24, 2024, estimated cost $7K, described as “Sprinkler work on the 5th and 9th floor (bathrooms) as indicated on drawings.”
- Alteration, filed Apr 24, 2024, estimated cost $180K, described as “Plumbing work on the 5th and 9th floor (bathrooms) as indicated on drawings.”
- Alteration, filed Apr 22, 2024, estimated cost $150K, described as “Construction work on the 5th and 9th floor (bathrooms) as indicated on drawings. EN drawings for lighting are submitted under M01032319-I1”
- Alteration, filed Apr 11, 2024, estimated cost $15K, described as “Sprinkler work on the 1st floor (W 25th lobby) as indicated on drawings”
- Alteration, filed Apr 9, 2024, estimated cost $150K, described as “Interior demolition of non load bearing partitions on the 5th floor as indicated on drawings.”
- Alteration, filed Jan 17, 2024, described as “RENEWAL of SR22-1985. all previous documents shall remain the same.”
- Alteration, filed Oct 27, 2023, estimated cost $450K, described as “Construction work on the 1st floor (West 25th lobby and storefront) as indicated on drawings. EN drawings for lighting are submitted under M00790374-I1”
- Alteration, filed Oct 27, 2023, estimated cost $125K, described as “Structural work on the 1st floor/storefront as indicated on drawings”
- Alteration, filed Oct 27, 2023, estimated cost $85K, described as “Mechanical work on the 1st floor (West 25th lobby and storefront) as indicated on drawings”
- Alteration, filed Sep 13, 2023, estimated cost $399K, described as “Interior renovation and demolition of interior non bearing partitions, ceilings, and finishes. Inclusive of cutting back existing MEPs to base building . Stadium seating demo and removal of storefront limestone. No change in use egress or…”
- Alteration, filed Jun 19, 2023, estimated cost $200K, described as “Merritt - peakpoint flatiron - plumbing modifications according to plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jun 19, 2023, estimated cost $50K, described as “1115 broadway - modifications to an existing fuel oil pipe and storage system. New 275 gallon fuel oil tank and associated piping connected to roof top generator. No change in use, egress, or occupancy.”
- Alteration, filed Jun 19, 2023, estimated cost $695K, described as “Merritt - peakpoint flatiron asc - mechanical modifications according to plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jun 19, 2023, estimated cost $105K, described as “Merritt - peakpoint flatiron - sprinkler modifications according to plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jun 19, 2023, estimated cost $1.1M, described as “Merritt healthcare - modifications of partitions, ceiling, doors according to plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 29, 2023, estimated cost $245K, described as “Mechanical work on the 6th floor (7th floor CO) (Creative office resources) as indicated on drawings”
17 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $32,769,450
- 2026–27 tax
- $3,451,408
- Market value (city estimate)
- $72,821,000
- Taxable value
- $31,816,080
- Assessed land
- $7,200,000
- Assessed improvements
- $25,569,450
Zoning
C5-2 (part of the lot is M1-8A/R11): floor area ratio 11.71 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 14, 2023: $43,576,810
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Flatiron BID Expansion (City Planning 2021M0260): Business improvement district, Completed, filed Nov 30, 2020, decided May 19, 2021. An application from the Small Business Services (SBS) on behalf of the Flatiron Business Improvement District (BID) to modify the existing plan and expand the BID in Community Districts 4 and 5 of Manhattan.
- MADISON PARK WEST (City Planning P2006M0172): Completed, decided May 1, 2006. 05DCP089M: PROPOSES TO REONE CERTAIN M1-6 PORTION S OF THE TWO BLOCKS B ETWEEN W.23RD AND W.25TH STREET AND 5TH AND 6TH AVENUE TO C5 -2