# 18 West 25th Street, Manhattan

Hotel · built c. 1920 · Block 826, Lot 55.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1008260055/18-west-25-street

More construction in Flatiron: https://umarelli.org/nyc/manhattan/flatiron.md

Every lot on block 826: https://umarelli.org/nyc/manhattan/826.md

## Building permits

- Alteration, filed Apr 10, 2026
- Alteration, filed Apr 6, 2026, estimated cost $9K, described as “Installation of 300PSF sidewalk shed as per plans. All equipment shall comply with ch #33 of the NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 12, 2026, estimated cost $44K, described as “Brick repointing, replacement of cracked/spalled brick, stone repointing, replacement of cracked/spalled stone. Scrap, prime and paint on steel lintel. Hairline cracks/spalled limestone to be repaired. Remove weeds and apply new…”
- Alteration, filed Sep 3, 2025, estimated cost $65K, described as “Interior renovation of existing restaurant, including new interior finishes and replacement/addition of kitchen appliances.no change to use, means of egress, or occupancy classification.”
- Alteration, filed Apr 21, 2025, estimated cost $63K, described as “Interior renovation of existing restaurant to make it into a white box. Work on cellar & 1ST floor. No change to exist'g use, egress or occupancy.”
- Alteration, filed Apr 14, 2024, described as “Suspended scaffold outrigger system at 18 west 25TH street, manhattan for facade restoration work.”
- Alteration, filed Apr 4, 2024, estimated cost $120K, described as “Proposed back facade & 2 sides of court yard stucco, window ientiles and sill repairs. Scrape of paint, fire escape and add steel railing. There is no change occupancy, use or egress”
- Alteration, filed Mar 26, 2021, estimated cost $25K, described as “General construction to do facade repair. No change in use, egress or occupancy”
- Alteration, filed Mar 15, 2021, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Mar 3, 2021, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”

## Building history

- Alteration, filed Dec 15, 2017, signed off Apr 8, 2022, units 110 to 117

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $6,236,100
- 2026–27 Tax: $626,666
- Market value (city estimate): $13,858,000
- Taxable value: $5,776,792
- Assessed land: $2,587,500
- Assessed improvements: $3,648,600

## Zoning

M1-8A/R11: floor area ratio 8.71 built, 12.00 allowed by base zoning.

## Board and land use applications

- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- Flatiron BID Expansion (City Planning 2021M0260): Business Improvement District, Completed, filed Nov 30, 2020, decided May 19, 2021. An application from the Small Business Services (SBS) on behalf of the Flatiron Business Improvement District (BID) to modify the existing plan and expand the BID in Community Districts 4 and 5 of Manhattan.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
