# 302 5th Avenue, Manhattan

Commercial · built c. 1915 · Block 833, Lot 38.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1008330038/302-5-avenue

More construction in Garment District: https://umarelli.org/nyc/manhattan/garment-district.md

Every lot on block 833: https://umarelli.org/nyc/manhattan/833.md

## Building permits

- Alteration, filed Aug 14, 2026, estimated cost $305K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 9TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 15, 2026, estimated cost $3K, described as “Erect non illuminated sign on wall JJ's Jimmy John's Sandwiches/ DUNKIN'- No change of use, egress or occupancy”
- Alteration, filed Jul 15, 2026, estimated cost $3K, described as “Erect non illuminated sign on wall JJ's Jimmy John's Sandwiches/ DUNKIN'- No change of use, egress or occupancy”
- Alteration, filed Jun 18, 2026, estimated cost $508K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 12TH and 14TH floors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 25, 2026, estimated cost $82K, described as “Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 12TH and 14TH floors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 26, 2025, estimated cost $87K, described as “Proposed renovation of existing commercial space for an eating & drinking establishment at the first floor level. No change in use, egress and occupancy.”
- Alteration, filed Nov 12, 2024, estimated cost $500K, described as “Filing for exterior facade repair for floors 001-012 as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Oct 29, 2024, described as “Installation of suspended scaffold for facade inspection/ repair.”
- Alteration, filed May 2, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 9, 2022, estimated cost $20K, described as “Scope of work will include the demolition as indicated on plans. No change in use, occupancy or egress.”
- Alteration, filed Mar 1, 2022, estimated cost $78K, described as “Proposed renovation at an eating and drinking establishment with minor partitions work as per plan. No change in use, egress and occupancy.”
- Alteration, filed Nov 23, 2021, estimated cost $1K, described as “Install new fresh air ductwork for gas meter room ventilation. No change in use, egress or occupancy.”
- Alteration, filed Jul 30, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 27, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $5,238,000
- Assessed land: $2,372,400
- Assessed improvements: $2,865,600

## Zoning

C5-2 (part of the lot is C6-4): floor area ratio 14.01 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
