## Building permits

- Alteration, filed Sep 17, 2026, estimated cost $25K, described as “Herewith file plans to combine Apt. 15A/B per TPPN 3/97, minor general construction work, Sub Doc S1 filed for PL. Total Apt. SF is 1110 SF, area of work is 400 SF”
- Alteration, filed Jan 7, 2026, estimated cost $87K, described as “Facade repairs to include selective masonry repair & replacements, terra cotta repairs & replacements, window lintel/sill replacements, and installation of protective guards. No change in use, egress or occupancy.”
- Alteration, filed Dec 23, 2025, estimated cost $55K, described as “Replace and relocate plumbing fixtures, Expand and relocate kitchen. Add laundry with washer and dryer as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 23, 2025, estimated cost $36K, described as “Relocate kitchen exhaust. Reuse existing bathroom exhausts for new bathrooms and laundry as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 19, 2025, estimated cost $148K, described as “Combine (3) apartments into one providing a (2) to (3) bedroom layout. Provide laundry in the apartment. Construct new interior walls, millwork, stone and tile work per plans. Construct new kitchen and bathrooms. No change in use, egress…”
- Alteration, filed Nov 22, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Nov 20, 2025, estimated cost $635K, described as “Renovate three apartments (#9A, #9B, #9C) in existing coop building. Combine apts #9A and #9B into new apartment #9AB. Remove/install non-load bearing partitions. Replace/relocate bathrooms and kitchens.”
- Alteration, filed Aug 12, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 12, 2025, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco”
- Alteration, filed Mar 29, 2024, estimated cost $111K, described as “Combination of apts 5ABC under tppn 3/97 filed in conjunction with DOB now pl and mh. No change to use, occupancy or egress.”
- Alteration, filed Mar 6, 2024, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 2, 2023, estimated cost $10K, described as “Herewith file to install ac condensing unit at apt 14CD. No change in use, egress, or occupancy involved.”
- Alteration, filed Jan 20, 2023, estimated cost $36K, described as “Install 4 gas clothes dryers with venting, install 4 clothes washer machines, install 1 replacement utility sink on existing roughing, install 1 sprinkler head from wet standpipe. No change in egress, use, or occupancy.”
- Alteration, filed Jan 3, 2023, estimated cost $510K, described as “Replacement of cellar level domestic gas distribution piping, vertical gas risers, and branch gas piping throughout the building. No change to use, egress, or occupancy.”
- Alteration, filed Jul 26, 2022, estimated cost $57K, described as “Renovation of apt 6G. Interior partition removal and construction related to renovation. No change to use, egress oroccupancy.”
- Alteration, filed Jan 8, 2021, estimated cost $12K, described as “Herewith file plan to relocate and install bathroom and kitchen.”
- Alteration, filed Feb 18, 2020, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 12, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Jul 3, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $9,235,350
- Assessed land: $765,000
- Assessed improvements: $8,470,350

## Zoning

R8B: floor area ratio 13.72 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.