# 110 East 23rd Street, Manhattan

Commercial · built c. 1900 · Block 878, Lot 69.

On Umarelli: https://umarelli.org/nyc/1008780069/110-east-23-street

More construction in Gramercy: https://umarelli.org/nyc/manhattan/gramercy.md

Every lot on block 878: https://umarelli.org/nyc/manhattan/878.md

## Building permits

- Demolition, filed Nov 3, 2026, estimated cost $800K, described as “Full demolition of five story structure, using hand held and mechanical means to assist.”
- Demolition, filed Nov 3, 2026, estimated cost $800K, described as “Full demolition of 10 story structure, using hand held and mechanical means to assist.”
- Alteration, filed Apr 13, 2022, estimated cost $20K, described as “Standpipe application filed for modification of standpipe in conjunction with Sprinkler work performed under Alt # 123466551. No change to use, egress or occupancy.”
- Alteration, filed Nov 19, 2021, estimated cost $9K, described as “Modification of existing sprinkler system”
- Alteration, filed Jun 9, 2021, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jun 4, 2021, estimated cost $4K, described as “Install storefront awning with no copy.”
- Alteration, filed Jun 4, 2021, described as “Install exterior non-illuminated blade sign ( flip'd by ihop)”
- Alteration, filed Jun 3, 2021, estimated cost $3K, described as “Install exterior illuminated wall sign (flip'd by ihop)”
- Alteration, filed May 13, 2021, estimated cost $50K, described as “Limited facade repairs including repointing of mortar joints, replacement of steel lintels, and deteriorated brickwork, all as indicated in drawings submitted herewith. No change to use egress or occupancy”
- Alteration, filed Feb 26, 2021, estimated cost $56K, described as “Application filed for plumbing work type for interior renovation of existing restaurant. In conjunction with job #M00445638.”
- Alteration, filed Feb 12, 2021, estimated cost $6K, described as “Installing new s/s hood with new interior black iron duct in existing commercial kitchen. No other work to be done. No change in use, egress or occupancy.”
- Alteration, filed Jan 22, 2021, estimated cost $1K, described as “Install 8'-0" high temporary construction fence at 1ST floor storefront.”
- Alteration, filed Jan 22, 2021, estimated cost $113K, described as “Install plumbing fixtures & partial sprinkler system off domestic water on 1ST floor & cellar for a new wendy's restaurant. No change in use, egress or occupancy.”
- Alteration, filed Jan 22, 2021, estimated cost $20K, described as “It is proposed to install kitchen exhaust hoods for wendy's restaurant on 1ST floor.”
- Alteration, filed Jan 22, 2021, estimated cost $220K, described as “It is proposed to renovate existing commercial space on 1ST floor & cellar for a new wendy's restaurant. Install interior non-load bearing partitions, hung ceiling, floor tiles and replace storefront. No change in use, egress or occupancy.”
- Alteration, filed Jan 11, 2021, estimated cost $3K, described as “Temporary construction fence installation 5FEET from building and aligned with property line”
- Alteration, filed Jan 6, 2021, estimated cost $153K, described as “Interior renovation of existing restaurant including minor carpentry work and new lighting fixtures. No change in use, occupancy, and egress is involved under this application.”
- Alteration, filed Jan 12, 2019, estimated cost $3K, described as “Installation of new business accessory illuminated wall sign. No change to use, occupancy or egress.”

## Property taxes

- Assessment: $2,836,350
- 2026–27 Tax: $281,366
- Market value (city estimate): $6,303,000
- Taxable value: $2,593,710
- Assessed land: $1,170,000
- Assessed improvements: $1,666,350

## Zoning

C6-4A: floor area ratio 6.67 built, 10.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Flatiron BID Expansion (City Planning 2021M0260): Business Improvement District, Completed, filed Nov 30, 2020, decided May 19, 2021. An application from the Small Business Services (SBS) on behalf of the Flatiron Business Improvement District (BID) to modify the existing plan and expand the BID in Community Districts 4 and 5 of Manhattan.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
