141 East 25th Street, Manhattan
Library · built c. 1895 · Block 881, Lot 31.
Building permits
- Alteration, filed Oct 29, 2026, estimated cost $456K, described as “Baruch College ITB Cooling Towers 1-5 Mechanical Platforms, Remove and replace warped metal grating and rusted railing/ladder assembly & Installation of railings in compliance with OSHA regulations. Install steel toe boards to existing…”
- Alteration, filed Sep 24, 2026, estimated cost $10K, described as “Installation of new sidewalk shed at 141 east 25 street manhattan ny 10010 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 22, 2026, estimated cost $10K, described as “Installation of new pipe scaffold at 141 east 25 street manhattan ny 10010 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed May 6, 2026, estimated cost $7.8M, described as “Limited interior renovations to 2ND, 3RD & 4TH floors; new partitions, doors & finishes. Bathroom finishes & direct replacements.”
- Alteration, filed Jan 15, 2026, estimated cost $975K, described as “Application filed for minor interior renovation with new finishes as per the plans filed herewith. No change to egress, occupancy or use”
- Alteration, filed Apr 15, 2025, estimated cost $861K, described as “Baruch Newman Lib, Facade repairs: Facade repairs include brick masonry, stone crack, terracotta replacement, terracotta spall and crack repairs, joint sealant replacement, mechanical screen refurbishment and sheet metal cornice…”
- Alteration, filed Mar 22, 2024, estimated cost $10K, described as “Installation of new sidewalk shed at 141 east 25 street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jun 9, 2023, estimated cost $387K, described as “Baruch College. IT Bldg, Cooling Tower Access - Construction of steel maintenance platforms to service existing cooling tower units CT-4 and CT-5. Removal and replacement of metal bar grating as per the plans filed.”
- Alteration, filed Jan 3, 2023, estimated cost $109K, described as “Modification to existing sprinkler system as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jan 3, 2023, estimated cost $171K, described as “Application filed to modify existing mechanical duct work and replace ac units with lighting as per plan. There is no change to use, egress or occupancy filed under this application.”
- Alteration, filed Jan 3, 2023, estimated cost $491K, described as “Interior renovation of elevator lobbies as per plan. Floors, walls, doors and ceiling . No change in occupancy, use and egress.”
- Alteration, filed Jun 8, 2022, estimated cost $5K, described as “Installation of temporary construction fence at 152 east 26TH street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed May 25, 2022, estimated cost $3K, described as “Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 28, 2022, estimated cost $46K, described as “Plumbing modifications and replacement of roof drains (12 units) as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 28, 2022, estimated cost $9K, described as “Mechanical modifications and replacement of vibration isolator to 6 units at the upper roof as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 28, 2022, estimated cost $808K, described as “Roof replacement and guard rail installation at upper roof (penthouse roof & 9TH floor) and related construction work as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 14, 2021, estimated cost $1.5M, described as “Mechanical modification including the removal/replacement of chillers and associated ductwork/piping and associated system components.”
- Alteration, filed Sep 10, 2021, estimated cost $150K, described as “Installation of new chiller supports on cellar and modification of 1st floor framing for removal/installation of chillers”
- Alteration, filed Sep 7, 2021, estimated cost $192K, described as “Provide structural steel framing system for a new canopy in an existing lobby.”
- Alteration, filed May 7, 2021, estimated cost $1.0M, described as “General construction work for replacement of hot and cold glycol piping”
- Alteration, filed Apr 29, 2021, estimated cost $4.0M, described as “Replacement of hot and cold glycol piping at Baruch college”
- Alteration, filed Feb 23, 2021, estimated cost $20.0M, described as “Mechanical work includes hydronic heating units & air-curtain installation in the new lobby canopy. Hot water supply is sourced from the existing boiler installation in the basement via new piping etc.”
- Alteration, filed Feb 23, 2021, estimated cost $54K, described as “Provide new sprinkler heads in new canopy. Provide sprinkler supply piping from the existing building sprinkler system.”
- Alteration, filed Feb 16, 2021, estimated cost $192K, described as “Provide structural steel framing system for a new canopy in an existing lobby.”
- Alteration, filed Dec 17, 2020, estimated cost $153K, described as “Sprinkler modification updated elevator pit sump pump design as per plans”
6 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $36,726,750
- Market value (city estimate)
- $81,615,000
- Taxable value
- $0
- Assessed land
- $3,514,500
- Assessed improvements
- $33,212,250
Zoning
C6-3A: floor area ratio 6.69 built, 7.52 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.