127 East 30th Street, Manhattan
Condominium · 71 units · built 1988 · Block 886, Lot 7503.
Building permits
- Alteration, filed Jul 22, 2026, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jul 9, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 13, 2026, described as “Installation of temporary suspended scaffold equipment.”
- Alteration, filed Mar 17, 2026, estimated cost $148K, described as “Interior renovation of apt 3C filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Feb 8, 2025, estimated cost $68K, described as “9th Cycle Facade Inspection & Safety Repairs. No changes to use, egress, or occupancy.”
- Alteration, filed Nov 24, 2021, estimated cost $70K, described as “Proposed work limited to interior partitions and replacement/relocate existing plumbing fixtures on 5TH flr. Restore previously combined residential units 5A & 5B into separate residential units as original constructed under NB app 43/1986…”
Property taxes
- Assessment
- $11,231,558
- 2026–27 Tax
- $1,275,125
- Market value (city estimate)
- $24,959,004
- Taxable value
- $10,224,645
- Assessed land
- $1,935,005
- Assessed improvements
- $9,296,553
- Condo units with their own tax lots
- 71
Tax breaks
- Nonprofit exemption (charitable), with no end date, about $59,970 a year below the full tax.
- Nonprofit exemption (parsonage), with no end date, about $21,649 a year below the full tax.
Zoning
C4-5A (part of the lot is C6-2A): floor area ratio 9.85 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 29, 2026: $1,387,500, Apt 17B
- May 19, 2026: $1,700,000, Apt 1C
- Mar 30, 2026: $760,000, Apt 17C
- Mar 6, 2025: $988,000, Apt 16C
- Feb 28, 2025: $950,000, Apt 2D
- Feb 13, 2025: $915,000, Apt 5D
- Oct 22, 2024: $1,520,000, Apt 10D
- Jul 22, 2024: $1,450,000, Apt 16D
- May 16, 2024: $1,370,000, Apt 16A
- Apr 23, 2024: $1,950,000, Unit PHB
The 10 most recent of 32 open-market sales since 2016, from the Department of Finance’s sales files.