# 150 East 34th Street, Manhattan

Apartment Building · 259 units · built 1987 · Block 889, Lot 55.

On Umarelli: https://umarelli.org/nyc/1008890055/150-east-34-street

More construction in Murray Hill: https://umarelli.org/nyc/manhattan/murray-hill.md

Every lot on block 889: https://umarelli.org/nyc/manhattan/889.md

## Building permits

- Alteration, filed Oct 27, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Jun 9, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed May 16, 2023, estimated cost $5K, described as “Register two ac units on the roof.”
- Alteration, filed Sep 10, 2020, estimated cost $210K, described as “Installation of new chimney liner, chimney offset and draft inducer as per plans filed in conjunction with application 123909404 for structural supports file by others. No change in use, egress or occupancy.”
- Alteration, filed Dec 6, 2019, estimated cost $10K, described as “Install new gas service, meter and booster pump for (2) replacement gas/oil burners on (2) existing low pressure boilers. No change in use, egress or occupancy.”
- Alteration, filed Nov 25, 2019, estimated cost $500K, described as “Replace (2) oil burners with (2) gas/oil burner on (2) existing low pressure boilers.change grade of fuel #4 to #2. No change in use, occupancy or egress.”
- Alteration, filed May 22, 2018, estimated cost $4K, described as “Application filed to remove the indirect illuminated, 12' x 2', three dimensional "Barking Dog" sign and to dismiss the ECB violation #35311381Z issued for work without a permit, all as per plans filed herewith. No change in use, egress or…”
- Alteration, filed May 10, 2018, estimated cost $6K, described as “Installation of Sidewalk Shed as per Plans.”
- Alteration, filed May 9, 2018, estimated cost $42K, described as “Installation of pipe scaffold as per plan.”

## Building history

- Alteration, filed Oct 13, 2017, signed off Aug 18, 2025, described as “Herewith filing to change use on cellar and 1ST floor”
- Alteration, filed Mar 16, 2009, plan exam - disapproved, described as “Convert 2ND &amp; 3RD floor to hotel rooms, u.g.5. Change mezzanine to mechancial space and construct partitions, ceilings and doors as shown on drawings filed herewith.”
- Alteration, filed Sep 27, 2004, permit issued - entire job/work, described as “Propose to convert accessory healthclub to a physical cultural establishment on 2ND floor as shown ondrawings filed herewith.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $28,620,450
- 2026–27 Tax: $2,972,732
- Market value (city estimate): $63,601,000
- Taxable value: $24,215,470
- Assessed land: $10,894,500
- Assessed improvements: $17,725,950

## Zoning

C1-9: floor area ratio 16.98 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jun 20, 2017: $118,000,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or Special Permit (Board of Standards and Appeals 389-04-BZ): Variance or Special Permit, Granted, filed Dec 13, 2004, decided Sep 13, 2005. Special Permit (§73-36) to permit the proposed legalization of an existing Physical Cultural Establishment, located on the second floor of the thirty seven story, Affina Hotel. The premise is located in a C1-9 zoning district.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
