# 1475 Broadway, Manhattan

Commercial · built c. 1908 · Block 995, Lot 1.

On Umarelli: https://umarelli.org/nyc/1009950001/1475-broadway

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

## Building permits

- Alteration, filed Sep 30, 2026, estimated cost $20K, described as “Structure for proposed directly illuminated (led) double-faced changeable copy accessory business projecting sign. Sign filed under separate application #M01430864.”
- Alteration, filed Sep 30, 2026, estimated cost $4K, described as “Proposed directly illuminated (led) double-faced changeable copy accessory business projecting sign. (i love ny gifts). Sign structure filed under separate application #M01430881.”
- No Work, filed Sep 25, 2026, described as “Tpa: fourth wing night - 10/1/2026-10/2/2026”
- No Work, filed Jun 25, 2026, described as “TPA: America 250 Commemoration Event at One Times Square. Event Dates: July 3-4, 2026. Event Hours: 8:00 PM to 12:30 AM. Maximum Occupancy: 500 TPA MAX OCC. LOAD”
- No Work, filed May 12, 2026
- No Work, filed May 12, 2026
- No Work, filed May 12, 2026
- No Work, filed May 11, 2026
- No Work, filed May 11, 2026
- No Work, filed May 11, 2026
- No Work, filed May 11, 2026
- No Work, filed May 11, 2026
- No Work, filed May 5, 2026
- No Work, filed May 5, 2026
- Alteration, filed May 4, 2026, estimated cost $150K, described as “Hereby filing to construct interior finishes for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed May 4, 2026, estimated cost $50K, described as “Hereby filing to construct interior finishes for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed Jan 21, 2026, estimated cost $188K, described as “Renovation of existing retail space”
- No Work, filed Nov 25, 2025
- No Work, filed Nov 25, 2025
- No Work, filed Nov 25, 2025
- No Work, filed Nov 25, 2025
- No Work, filed Oct 30, 2025
- No Work, filed Oct 30, 2025
- Alteration, filed Sep 26, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 26, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

99 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1009950001/1475-broadway.

## Property taxes

- Assessment: $101,768,850
- 2026–27 tax: $11,039,885
- Market value (city estimate): $226,153,000
- Taxable value: $101,768,850
- Assessed land: $14,962,950
- Assessed improvements: $86,805,900

## Zoning

C6-7: floor area ratio 43.20 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Appeal (Board of Standards and Appeals 2023-62-A): Appeal, Withdrawn, filed Aug 31, 2023, decided May 8, 2024. Interpretive Appeal concerning a final determination of the New York City Department of Buildings. C6-7 zoning district.
- Appeal (Board of Standards and Appeals 2022-68-AII): Appeal, Denied, filed Mar 15, 2023, decided Sep 18, 2023. Application for reargument, pursuant to Board’s Rules of Practice and Procedures, Section 1-12.4, of an application, dismissed on January 9, 2023, for lack of jurisdiction. The initial application concerned an Interpretive Appeal of a…
- Appeal (Board of Standards and Appeals 2022-68-A): Appeal, Dismissed, filed Sep 2, 2022, decided Jan 9, 2023. Interpretive Appeal concerning a final determination of the New York City Department of Buildings. C6-7 zoning district.

## In the news

[1 Times Square Prepares For Fall Opening in Times Square, Manhattan](https://newyorkyimby.com/2025/08/1-times-square-prepares-for-fall-opening-in-times-square-manhattan.html), New York YIMBY, Aug 25, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
