- Alteration, filed Oct 13, 2026, estimated cost $285K, described as “Structural framing and slab reinforcement work associated with elevator shaftway work on floors sub-cellar (including minor foundation), cellar, 1-10 as per plans filed herewith. No changes in use, egress or occupancy”
- Alteration, filed Oct 13, 2026, estimated cost $80K, described as “General construction associated with new elevator threshold opening in existing shaftwall to accomodate installation of new elevator doors and frames on floors sub-cellar, cellar, 1-9 as per plans filed herewith. No changes in use, egress…”
- Alteration, filed Aug 10, 2026, described as “Installation of temporary pipe scaffold as per plan. No change in use, egress, or occupancy.”
- No Work, filed Jun 25, 2026, described as “Private TPA event for 300 persons.”
- Alteration, filed May 28, 2026, estimated cost $80K, described as “(SLG Rig) Temp Construction associated with one-time TPA event.”
- Alteration, filed May 28, 2026, estimated cost $80K, described as “(Tenant Rig) Temporary Construction associated with one-time TPA event.”
- No Work, filed May 8, 2026, described as “Back of house for production and HMU teams for fashion show in adjacent property. Catering provided in designated locations only. Monitored entry for invited performers and staff only.”
- Alteration, filed Mar 31, 2026, estimated cost $2K, described as “Architectural scope associated with the construction of a Temp. partition with the door within the existing dressing room. No change of use, egress or occupancy.”
- Alteration, filed Mar 25, 2026, estimated cost $250K, described as “General construction on floors 1-4, 9-10 as per plans filed herewith. No changes in use, egress or occupancy.”
- Alteration, filed Mar 25, 2026, estimated cost $76K, described as “Structural modifications on floors 2-4 as per plans filed herewith. No changes in use, egress or occupancy.”
- Alteration, filed Mar 24, 2026, estimated cost $801K, described as “Mechanical modifications on floors 1-4, 9-10 as per plans filed herewith. No changes in use, egress or occupancy.”
- Alteration, filed Mar 24, 2026, estimated cost $355K, described as “Plumbing and Sprinkler modifications on floors Sub-Cellar and Cellar, 01, 02, 03, 04, 08, 09, 10 as per plans filed herewith. No changes in use, egress or occupancy.”
- Alteration, filed Jan 20, 2026, estimated cost $400K, described as “General construction on floors 3-10 as per plans filed herewith. No changes in use, egress or occupancy.”
- Alteration, filed Jan 19, 2026, estimated cost $300K, described as “Plumbing, Sprinkler and Standpipe modifications on floors 1-4 and 9-10 as per plans filed herewith. No changes in use, egress or occupancy,”
- Alteration, filed Jan 19, 2026, estimated cost $80K, described as “Structural modifications on floors 2-8 as per plans filed herewith. No changes in use, egress or occupancy.”
- Alteration, filed Jun 6, 2024, estimated cost $242K, described as “General construction modifications taking place in the sub-cellar and 13TH floor as per drawings filed herewtith. No change in use, egress or occupancy.”
- Alteration, filed Jun 5, 2024, estimated cost $50K, described as “Plumbing modifications taking place on the 12TH and 13TH floor as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 5, 2024, estimated cost $7K, described as “Sprinkler modifications taking place on the sub-cellar and 13TH floor as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 5, 2024, estimated cost $89K, described as “Mechanical modifications taking place in sub-cellar and floors 12 through 14 as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 9, 2021, estimated cost $2K, described as “Temporary placement of 2 mini cranes to hoist and install panels”
- Alteration, filed Aug 27, 2021, estimated cost $5K, described as “Installation of temporary suspended scaffold as per drawings. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 25, 2021, estimated cost $1K, described as “Installation and use of temporary suspended scaffolding and material hoist as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Aug 3, 2021, estimated cost $30K, described as “Temporary shoring as per drawings. Shoring shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 26, 2021, estimated cost $25K, described as “South smoke door platforms: installation of temporary work platforms as per drawings. Temporary work platforms shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 14, 2021, estimated cost $34K, described as “Installation of temporary powered suspended scaffold as per drawings. Suspended scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
50 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $302,308,344
- 2026–27 tax
- $9,208,686
- Market value (city estimate)
- $671,796,320
- Taxable value
- $301,750,975
- Assessed land
- $27,630,000
- Assessed improvements
- $274,678,344
- Condo units with their own tax lots
- 4
Zoning
C6-7T (part of the lot is C6-5.5): floor area ratio 22.92 built, above the 14.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 20, 2017: $162,874,240
- Jul 20, 2017: $37,125,760
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Palace Theater (Interior Landmark). 11 Landmarks Preservation Commission permits are on file.
In the news
TSX Broadway’s Tempo by Hilton Prepares For Late-Summer Opening at 1568 Broadway in Times Square, Manhattan, New York YIMBY, Jun 27, 2023.