1585 Broadway, Manhattan
Condominium · built 1987 · Block 1019, Lot 7502.
Building permits
- No Work, filed Oct 27, 2026, described as “Multi-Purpose Room - Business functions (Primary layout and three alternate layouts)”
- Alteration, filed Sep 1, 2026, estimated cost $860K, described as “Modification of existing HVAC System as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 24, 2026, estimated cost $370K, described as “Work shall include removal and replacement of the existing sewage, sump pumps and relocated control panel and associated discharge piping as per plans filed herewith. No change in use, egress,or occupancy.”
- Alteration, filed Jul 29, 2026, estimated cost $245K, described as “Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.”
- Alteration, filed Jul 1, 2026, estimated cost $185K, described as “Modifications to existing HVAC System as per plans filed herewith. Replacement of ductwork and air outlets for rebuilt ceilings. No change to use, egress, or occupancy.”
- Alteration, filed Jul 1, 2026, estimated cost $215K, described as “Modifications to existing HVAC System as per plans filed herewith. Replacement of ductwork and air outlets for rebuilt ceilings. No change to use, egress, or occupancy.”
- Alteration, filed Jun 12, 2026, estimated cost $797K, described as “An interior alteration of a coffee shop which includes the installation of interior non-bearing partitions, ceilings, doors, and their related finishes as per plans filed herewith. No change of egress, use, or occupancy. No exterior work.”
- Alteration, filed Jun 2, 2026, estimated cost $236K, described as “Removal of existing HVAC,WSHP, & equipment and distribution and replacement with same as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 2, 2026, estimated cost $166K, described as “Structural work according to plans filed herewith, including cold formed stud walls, steel posts and beams in walls, and ceiling support design. Concrete pad support for MEP units as per plans filed herewith. No change in use, egress or…”
- Alteration, filed Jun 2, 2026, estimated cost $223K, described as “All new Tenant space on ground level. Tenant Space of the building fed from overall building systems including Domestic Water Supply and Sanitary as per plans filed herewith. No change in use, egress, or occupancy.”
- No Work, filed Apr 28, 2026, described as “Fitness Center”
- No Work, filed Apr 13, 2026, described as “Morgan stanley meeting hall 15TH floor”
- No Work, filed Feb 23, 2026, described as “Fitness Center”
- Alteration, filed Jan 30, 2026, described as “Temporary suspended scaffold as per drawings. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 12, 2026, estimated cost $25K, described as “Temporary use of platforms for BMU4 as per plans.”
- Alteration, filed Jan 12, 2026, estimated cost $25K, described as “Temporary use of platforms for BMU3 as per plans.”
- Alteration, filed Jan 9, 2026, estimated cost $25K, described as “Temporary use of platforms from BMU2 (south-east) as per plans.”
- Alteration, filed Jan 9, 2026, estimated cost $25K, described as “Temporary use of platforms from BMU1 (south-west) as per plans.”
- No Work, filed Jan 8, 2026, described as “Morgan stanley meeting hall 15TH floor”
- No Work, filed Jan 8, 2026, described as “Fitness Center”
- Alteration, filed Dec 16, 2025, estimated cost $750K, described as “Installation of a sign structure on roof of building north facing at w 48TH street elevation. Sign filed under separate application #M01254570. No change in use, egress, or occupancy.”
- Alteration, filed Dec 16, 2025, estimated cost $750K, described as “Installation of a sign structure on roof of building south facing at w 47TH street elevation. Sign filed under separate application #M01254566. No change in use, egress, or occupancy.”
- Alteration, filed Dec 16, 2025, estimated cost $750K, described as “Installation of a sign structure on roof of building east facing at broadway elevation. Sign filed under separate application #M01254556. No change in use, egress, or occupancy.”
- Alteration, filed Dec 16, 2025, estimated cost $750K, described as “Installation of a sign structure on roof of building east facing at broadway elevation. Sign filed under separate application #M01254556. No change in use, egress, or occupancy.”
- No Work, filed Nov 17, 2025, described as “Winter Wonderland Market / gift wrapping.”
220 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $277,467,515
- 2026–27 tax
- $29,034,652
- Market value (city estimate)
- $616,594,462
- Taxable value
- $267,649,806
- Assessed land
- $40,248,001
- Assessed improvements
- $237,219,514
- Condo units with their own tax lots
- 42
Zoning
C6-7T (part of the lot is C6-5): floor area ratio 20.30 built, above the 14.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
In the news
Morgan Stanley Headquarters Continues Renovations at 1585 Broadway in Times Square, Manhattan, New York YIMBY, Jan 4, 2026.