- Alteration, filed May 19, 2025, estimated cost $150K, described as “Structural repair at cracked walls and slabs and patching throughout.”
- Alteration, filed May 1, 2025, estimated cost $3K, described as “Illuminated non-advertising accessory wall sign - hyatt regency. No change of use, egress or occupancy.”
- Alteration, filed May 1, 2025, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - hyatt regency. No change of use, egress or occupancy.”
- Alteration, filed Jan 13, 2025, estimated cost $5K, described as “Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 4, 2024, estimated cost $20K, described as “Existing wet sprinkler heads to be shifted as required in guestrooms, existing sprinkler heads within the existing gym area on the 15TH floor to be relocated, removed, or new sprinkler heads installed, new sprinkler heads to be installed…”
- Alteration, filed Oct 24, 2024, estimated cost $8.0M, described as “Proposed work on const. Flrs 14(15TH market) & const. Flrs 16 to 28 (flrs 16-29 market), minimal removal & construction of interior non-bearing partitions, dropped ceilings in guestrooms & corridors; removal & installation of floors,…”
- Alteration, filed Oct 8, 2024, estimated cost $5K, described as “Installation of a temporarily working platform per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 8, 2024, estimated cost $5K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 8, 2024, estimated cost $5K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 1, 2024, estimated cost $125K, described as “Sprinkler demolition, modifications and upgrades related to Public Spaces per plans filed.”
- Alteration, filed Sep 9, 2024, estimated cost $4.8M, described as “Interior demolition and construction of non-load bearing partitions, hung ceilings, and related finishes as per drawings filed herewith.”
- Alteration, filed Sep 9, 2024, estimated cost $175K, described as “Removal of interior partitions on 2nd floor.”
- Alteration, filed Sep 3, 2024, estimated cost $2.2M, described as “Exterior alterations of existing J-1 Hotel, installation of cosmetic finishes at building exterior per plans filed.”
- Alteration, filed Sep 3, 2024, estimated cost $9.2M, described as “Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.”
- Alteration, filed Aug 29, 2024, estimated cost $25K, described as “Sprinkler System Modifications related to Guestroom floors (29-46) per plans filed.”
- Alteration, filed Jul 10, 2024, estimated cost $80K, described as “Architectural changes on the 6th floor as indicated on drawings.”
- Alteration, filed Aug 16, 2023, estimated cost $75K, described as “Renovate two (2) existing Hotel Model Rooms, minor removal and patching of partitions per plans filed herewith.”
- Alteration, filed Mar 15, 2023, estimated cost $2K, described as “Plumbing demolition as per plans filed herewith. Scope to include ot, mh, pl and sp demo/temp loop scope.”
- Alteration, filed Mar 15, 2023, estimated cost $18K, described as “Sprinkler demo and install temp loop as per plans filed herewith.”
- Alteration, filed Mar 15, 2023, estimated cost $16K, described as “Interior demolition of mechanical as per plans filed herewith.”
- Alteration, filed Mar 14, 2023, estimated cost $245K, described as “Interior demolition as per plans filed herewith. No change to use, egress nor occupancy.”
- Alteration, filed Jun 3, 2021, estimated cost $7K, described as “Installation of 1 unit on the 5TH floor and 1 unit on the roof with a total capacity of 2 tons. No change to egress, use, or occupancy.”
- Alteration, filed Feb 25, 2021, estimated cost $25K, described as “New Split System HVAC unit”
- Alteration, filed Feb 25, 2021, estimated cost $25K, described as “Renovation of an existing commercial space. No change of use, occupancy or egress.”
- Alteration, filed Sep 22, 2020, estimated cost $29K, described as “Erect illuminated accessory business sign on wall (conveyor belt)for krispy kreme. No change in use, egress or occupancy.”
16 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $99,318,600
- 2026–27 tax
- $10,774,082
- Market value (city estimate)
- $220,708,000
- Taxable value
- $99,318,600
- Assessed land
- $47,700,000
- Assessed improvements
- $51,618,600
Zoning
C6-7T: floor area ratio 23.90 built, above the 14.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 23, 2024: $53,285,772
- Dec 28, 2022: $17,250,000
- Sep 24, 2021: $121,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- CROWNE SWIM & HEALTH CLUB (City Planning P1990M0817): Completed. 90-160M: BSA VAR TO OPEN AN EXIST HEALTH CLUB TO THE PUBLIC WHICH CURRENTLY IS FUNCTIONING AS AN ACCESSORY HEALTH CLUB TO A HOTEL