790 8th Avenue, Manhattan
Hotel condominium · built 1962 · Block 1020, Lot 7501.
Building permits
- Alteration, filed Oct 23, 2025, estimated cost $300K, described as “Herewith filing Cooling Tower Replacement as per the plans. No change in use, egress or occupancy”
- Alteration, filed Feb 10, 2025, estimated cost $2K, described as “Non-illuminated non-advertising accessory rooftop retractable awning - no lettering. No change of use, egress or occupancy.”
- Alteration, filed Jun 24, 2024, estimated cost $6K, described as “Non-illuminated non-advertising accessory rooftop canopy with removable panels - in property lines - no copy. No change of use, egress or occupancy.”
- Alteration, filed Jan 18, 2024, estimated cost $195K, described as “Storefront replacement as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Nov 11, 2023, estimated cost $600K, described as “General renovations of Rooftop Bar, Lounge, Pantry without cooking and back of house spaces of exist. Hotel.”
- Alteration, filed Nov 10, 2023, estimated cost $60K, described as “Modifications to existing Sprinkler system related to Rooftop Bar/Lounge renovation. Relocation of SP heads to accommodate renovation.”
- Alteration, filed Feb 22, 2023, estimated cost $55K, described as “Modifications to existing Sprinkler System related to General renovations on 1st and 14th floors.”
- Alteration, filed Feb 22, 2023, estimated cost $300K, described as “Mechanical modifications including providing HVAC to new 1st fl. kitchen, redistributing ductwork from exist. unit serving 14th fl bar and providing exhaust and heat for bathrooms.”
- Alteration, filed Feb 22, 2023, estimated cost $300K, described as “Installation of New Commercial Kitchen on the 1st floor with grease interceptor in Cellar, and addition of new pantry on the 14th fl, renovate exist. bar on the 14th.”
- Alteration, filed Feb 21, 2023, estimated cost $50K, described as “Structural reinforcements related to construction of new concrete ramp, dunnage support for new rooftop A/C units, new penetrations through 2nd floor setback.”
- Alteration, filed Feb 21, 2023, estimated cost $1.2M, described as “General renovations consisting of demolition and construction at Rooftop Bar, Lounge, Kitchen, Back of house spaces and Marquee at existing Hotel”
- Alteration, filed Jan 3, 2023, estimated cost $220K, described as “Structural Reinforcements related to Hotel Renovation per plans”
- Alteration, filed Dec 22, 2022, estimated cost $2.1M, described as “Removal and installation of Plumbing fixtures and related piping per plans.”
- Alteration, filed Dec 22, 2022, estimated cost $1.3M, described as “Removal and installation of Mechanical HVAC ductwork and equipment per plans”
- Alteration, filed Dec 22, 2022, estimated cost $150K, described as “Modification to existing sprinkler system.”
- Alteration, filed Dec 21, 2022, estimated cost $18K, described as “Demolition of plumbing fixtures and cap piping per plans filed.”
- Alteration, filed Dec 21, 2022, estimated cost $4.4M, described as “Demolition and construction of interior non load bearing partitions, ceilings, doors per plans.”
- Alteration, filed Dec 21, 2022, estimated cost $25K, described as “Demolition of interior non load bearing partitions and ceilings”
- Alteration, filed May 2, 2022, estimated cost $564K, described as “Structural work as per plans filed herewith. no change in use, egress or occupancy”
- Alteration, filed Mar 3, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Feb 16, 2022, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Dec 15, 2021, estimated cost $459K, described as “Facade re-cladding at mass wall and columns as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Mar 19, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $49,451,400
- 2026–27 tax
- $5,019,065
- Market value (city estimate)
- $109,892,000
- Taxable value
- $46,267,194
- Assessed land
- $7,353,000
- Assessed improvements
- $42,098,400
- Condo units with their own tax lots
- 2
Zoning
C6-4: floor area ratio 14.86 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.