250 West 52nd Street, Manhattan
Commercial · built c. 1927 · Block 1023, Lot 54.
Building permits
- Alteration, filed Mar 27, 2026, estimated cost $50K, described as “Replace 5 ton rooftop unit connecting to existing ductwork, power and controls.”
- Alteration, filed Jan 29, 2026, estimated cost $784K, described as “Facade Repairs as shown in filed drawings. No change in egress, use or occupancy.”
- Alteration, filed Dec 8, 2025, estimated cost $1K, described as “Installation of temporary custom color sidewalk shed as per plan. No change in use, egress, or occupancy. The sidewalk shed is at the west 52ND street, east to the canopy, and west 52ND street, west to the canopy.”
- Alteration, filed Oct 22, 2025, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 17, 2025, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Feb 21, 2020, described as “Installation of temporary interior supported scaffold inside theater per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 24, 2020, described as “Installation of pipe scaffold as shown on drawings. No change in use egress or occupancy. We shall comply with chapter 33 of 2014 b.c”
- Alteration, filed Dec 16, 2019, estimated cost $1K, described as “Installation of temporary pipe scaffold at various levels for remedial repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Dec 16, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Aug 5, 2019, estimated cost $484K, described as “Remove chiller and cooling tower,. Install 2 packaged air conditioning systems. Install split-system air-conditioning replace 2 air handler associated piping ,power and controls.. Duct distribution new and altered. Install miscellaneous…”
Building history
- Alteration, filed May 22, 2002, permit issued - entire job/work, described as “Increase the number of occupants and providing new seating layout, demolition of partitions and creating new door openings as per plans”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $3,253,950
- 2026–27 Tax
- $327,473
- Market value (city estimate)
- $7,231,000
- Taxable value
- $3,015,680
- Assessed land
- $2,025,000
- Assessed improvements
- $1,228,950
Zoning
C6-5: floor area ratio 1.00 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Alvin Theater (now Neil Simon Theater): Individual Landmark, Alvin Theater (now Neil Simon Theater) (Interior Landmark). 37 Landmarks Preservation Commission permits are on file.
Board and land use applications
- 560 Seventh Avenue (Neil Simon Theatre air rights) (City Planning P2014M0487): Completed, decided Aug 18, 2015. Certification pursuant to 81-744 to transfer development rights from a listed theater (Neil Simon Theatre) located at 250 W. 52nd Street to a receiving site located at 560 Seventh Avenue, CD 5, Manhattan.
- HELLINGER THEATRE (City Planning P1990M0299): Completed, decided Jan 17, 1997. AUTH TO MODIFY DESIGN STANDARDS OF A PEDESTRIAN CIRCULATION*SPACE & CERTIF FOR FLOOR AREA BONUS TO RETAIN THEATRE INCON*JUNCTION W/CONSTRUCTION OF A 52-STORY HOTEL, (APPX 358,00SF)
- ALVIN THEATER INTERIOR (City Planning P1986M0137): Completed, decided Dec 19, 1985. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 155