# 1680 Broadway, Manhattan

Commercial · built 1969 · Block 1024, Lot 38.

On Umarelli: https://umarelli.org/nyc/1010240038/1680-broadway

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

Every lot on block 1024: https://umarelli.org/nyc/manhattan/1024.md

## Building permits

- Alteration, filed Oct 21, 2026, estimated cost $10K, described as “Removal of existing sprinkler system with installation of a temporary loop on the 25th floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Oct 21, 2026, estimated cost $5K, described as “Removal and disposal of existing plumbing fixtures and associated piping on the 25th floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Oct 20, 2026, estimated cost $12K, described as “Modifications to the existing HVAC system on the 25th floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Oct 12, 2026, estimated cost $20K, described as “Removal and disposal of interior partitions, doors, suspended ceilings and finishes with patch and repair of walls, ceilings and fixtures on the 25th floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Sep 14, 2026, estimated cost $615K, described as “Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on 9th Floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Sep 11, 2026, estimated cost $150K, described as “Modifications to the existing HVAC system on the 9th floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Sep 11, 2026, estimated cost $48K, described as “Modifications to the existing sprinkler system with installation of a temporary loop on the 8th floor as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Sep 1, 2026, estimated cost $975K, described as “Facade repairs as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 25, 2026, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 19, 2026, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 20, 2026, estimated cost $114K, described as “Removal and disposal of interior partitions, doors, ceilings and finishes on the 9th Floor (Turner Demo) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jul 15, 2026, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Jun 5, 2026, estimated cost $12K, described as “Modifications to the existing sprinkler and standpipe systems on the 2nd floor (Paradigm) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jun 5, 2026, estimated cost $5K, described as “Modifications to the existing plumbing system on the 2nd floor (Paradigm) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jun 5, 2026, estimated cost $40K, described as “Modifications to the existing HVAC system on the 2nd floor (Paradigm) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jun 2, 2026, estimated cost $75K, described as “Minor demolition with installation of new partitions, doors, ceilings and finishes on the 2nd floor (Paradigm) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 8, 2026, estimated cost $18K, described as “Modifications to the existing sprinkler and standpipe systems on the 10th floor (Demo & Whitebox) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 8, 2026, estimated cost $9K, described as “Removal and disposal of existing plumbing fixtures and associated piping on the 10th floor (Demo & Whitebox) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 8, 2026, estimated cost $17K, described as “Modifications to the existing HVAC system on the 10th floor (Demo & Whitebox) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 7, 2026, estimated cost $25K, described as “Removal and disposal of interior partitions, doors, ceilings and finishes with patch and repair of walls, floors and columns on the 10th floor (Demo & Whitebox) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Dec 30, 2025, estimated cost $25K, described as “Modifications to the existing sprinkler system on the 36th floor (Suite 3601) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Dec 29, 2025, estimated cost $275K, described as “Minor demolition with installation of new interior partitions, doors, ceilings and finishes on the 36th floor (Suite 3601) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Dec 24, 2025, estimated cost $14K, described as “Modifications to the existing plumbing system on the 36th floor (Suite 3601) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Dec 24, 2025, estimated cost $100K, described as “Modifications to the existing HVAC system on the 36th floor (Suite 3601) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Dec 9, 2025, estimated cost $20K, described as “Installation of new plumbing fixtures and associated piping on the 20th floor (Suite 2000- Made by Gather) as per plans. No change to use, egress or occupancy.”

162 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1010240038/1680-broadway.

## Property taxes

- Assessment: $95,159,250
- 2026–27 tax: $10,322,875
- Market value (city estimate): $211,465,000
- Taxable value: $95,159,250
- Assessed land: $30,780,000
- Assessed improvements: $64,379,250

## Zoning

C6-7 (part of the lot is C6-6): floor area ratio 26.43 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- MARTINI'S (City Planning P1997M0399): Completed, decided Jan 16, 2002. RENEWAL OF A CERTIF FOR AN OPEN AIR CAFE IN AN EXISTING\*PLAZA IN THE SPECIAL MIDTOWN DISTRICT
- 810 7TH AVE (City Planning P1994M0264): Completed, decided Apr 29, 1994. CERTIFICATION TO ESTABLISH AN OPEN-AIR CAFE WITHIN THE\*SPECIAL MIDTOWN DIST (POPS)
- THE BREW BURGER (City Planning P1986M1221): Completed, decided Oct 2, 1985. CONSENT-UNENCLOSED SIDEWALK CAFE
- MARTINI'S RESTAURANT OPEN AIR CAFE (City Planning P2002M0200): Completed. CERT FOR AN OPEN-AIR CAFE IN AN EXISTING PLAZA ADJACENT TO\*MARTINI'S RESTAURANT IN THE SPECIAL MIDTOWN DIST