# 1710 Broadway, Manhattan

Hotel · built 2025 · Block 1026, Lot 21.

On Umarelli: https://umarelli.org/nyc/1010260021/1710-broadway

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

## Building permits

- New Building — Hotel, filed Sep 22, 2023, 686 hotel rooms, 55 stories, described as “Construction of new building. Application #M00486337-I1 refiled to comply with bc 2022. Kindly request review from development hub”
- Alteration, filed Oct 23, 2026, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Oct 22, 2026, estimated cost $20K, described as “Installation and use of building maintenance unit (bmu). Bmu equipment shall remain on building post application sign off while remaining under department of labor's jurisdiction contingent on approval. No change to use, egress, or…”
- Alteration, filed Jul 23, 2026, described as “Outriggers system installation for facade repairs, no change in use, egress, or occupancy.”
- Alteration, filed Jun 11, 2026, estimated cost $12K, described as “Installation of pipe scaffolding as per plans. Pipe scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 17, 2026, estimated cost $12K, described as “Installation of pipe scaffold towers at interior floor slabs as per plans. Pipe scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 5, 2026, estimated cost $5K, described as “Installation of temporary working platofrm as per plans. Platofrm shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jan 15, 2026, estimated cost $1K, described as “This application is filed for a Temporary Use permit (field offices and shanties) pursuant to section AC28-111 and building Bulletin 2010-002.”
- Alteration, filed Jan 5, 2026, estimated cost $6K, described as “Installation of 2,000 lb beta max material hoist in shaft as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Nov 19, 2025, estimated cost $160K, described as “Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.”
- Alteration, filed Nov 10, 2025, estimated cost $1K, described as “Installation and use of temporary concrete placing boom as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 9, 2025, estimated cost $60K, described as “Installation of vertical wall formwork and platforms.”
- Alteration, filed Aug 8, 2025, estimated cost $1K, described as “Installation and use temporary platform as per plans filed herewith.no change in use, egress, or occupancy.”
- Alteration, filed Jul 2, 2025, estimated cost $20K, described as “Installation of 7,100 lb dual personnel hoist cars @ west as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 2, 2025, estimated cost $20K, described as “Installation of 7,000 lb dual personnel hoist cars @ east as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 20, 2024, estimated cost $26K, described as “Installation of construction plywood fence, heavy duty sidewalk shed and overhead protection shed as per plans during construction. No change in use, egress or occupancy. Temporary equipment shall comply with chapter 33 of NYC building…”
- Alteration, filed Feb 2, 2024, estimated cost $5K, described as “Debris will be lowered using elevator shaft as debris chute.”
- Alteration, filed Dec 26, 2023, estimated cost $10K, described as “Installation of 300 psf sidewalk shed, pipe scaffolding, and system beam as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Nov 3, 2023, estimated cost $7K, described as “Installation of temporary construction plywood fence as per plans. No change in use, egress or occupancy. Fence shall comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Apr 8, 2022, estimated cost $1K, described as “Installation and use of temporary sidewalk shed as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Oct 8, 2021, estimated cost $10K, described as “Installation of support of excavation for a new building”
- Alteration, filed Aug 27, 2021, described as “Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

## Property taxes

- Assessment: $1,734,205
- 2026–27 tax: $176,300
- Market value (city estimate): $3,853,788
- Taxable value: $1,625,182
- Assessed land: $1,734,205

## Zoning

C6-7 (part of the lot is C6-6): floor area ratio 61.62 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Oct 5, 2023: $172,800,000
- Jan 5, 2017: $268,124,175

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 67-05-BZ): Variance or special permit, Granted, filed Mar 17, 2005, decided Aug 9, 2005. Special Permit (§73-36) to permit the proposed physical culture establishment, within the cellar level, with entry on the ground level, of an existing six story building, located in a C6 6/C6 7 zoning district, which requires a special…
- Helen Hayes Theatre TDR II (City Planning P2015M0409): Completed, decided Sep 16, 2016. Certification to transfer of development rights pursuant to 81-744(a) for a proposed development located at 1710 Broadway

## In the news

[54-Story Hotel Skyscraper Continues Ascent at 1710 Broadway in Midtown, Manhattan](https://newyorkyimby.com/2026/04/54-story-hotel-skyscraper-continues-ascent-at-1710-broadway-in-midtown-manhattan.html), New York YIMBY, Apr 26, 2026.