## Building permits

- Alteration, filed Jun 23, 2026, estimated cost $4K, described as “Installation of temporary beta max hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 9, 2026, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 22, 2026, estimated cost $4K, described as “Installation of temporary storage of materials as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 3, 2025, estimated cost $1K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy or egress.”
- Alteration, filed Nov 13, 2024, described as “Installation of suspended scaffold for facade work or inspection”
- Alteration, filed Oct 29, 2024, estimated cost $1K, described as “Proposed installation of temporary light duty pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 29, 2024, estimated cost $1K, described as “Installation of temporary knee bracket as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Oct 29, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jul 24, 2024, described as “Installation of suspended scaffold for facade work and/or inspection. Amend #7 added scaffold drops”
- Alteration, filed May 9, 2024, estimated cost $608K, described as “9th Cycle Facade Repairs. No change to use, egress, or occupancy.”
- Alteration, filed Apr 22, 2024, estimated cost $173K, described as “On an existing commercial building at a retail store, misc. Interior renovation of the partial cellar, first and second floor, and the replacement of existing (4) ductless HVAC units as per the plan herewith. No change of use, egress, or…”
- Alteration, filed Jan 26, 2024, estimated cost $30K, described as “Provide new wet sprinkler heads in new retail store as shown on submitted plans. No change in occupancy or egrees.”
- Alteration, filed Nov 3, 2022, estimated cost $147K, described as “Interior renovation in ex.commercial space on 1ST floor. Proposed new commercial kitchen hood. Replace exhaust duct & exhaust fan on roof. Installing 3 refrigeration condensers and 1 HVAC in side alleyway. Plumbing to be filed separately.”
- Alteration, filed Oct 7, 2022, estimated cost $37K, described as “General construction to remove interior partition, doors and ceiling as shonw on drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 17, 2022, estimated cost $52K, described as “Removal of existing exterior condensing units, cooling tower, refrigerant system, ceiling mounted AC unites and associated refrigerant piping, power and controls. Removal of exhaust ductwork diffusers and returns. No change in use,…”
- Alteration, filed Jun 17, 2022, estimated cost $35K, described as “Removal of existing kitchen plumbing piping, floor drains, gas piping, grease traps, toilet plumbing piping and all associated fixtures. No change in use, occupancy or egress”
- Alteration, filed Jun 10, 2022, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed May 26, 2022, estimated cost $156K, described as “Cellar and 1ST floor demolition to include the removal ofinterior non load bearing partitions, doors, and finishes as perplans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 14, 2020, estimated cost $20K, described as “Installation of a/c split system, exhaust duct and louver as per drawings herewith. No change in use,occupancy or egress.”
- Alteration, filed Dec 14, 2020, estimated cost $11K, described as “Installation of sump pumps as per drawings herewith. No change in use,occupancy or egress.”
- Alteration, filed Sep 19, 2019, estimated cost $8K, described as “Alteration type 3 - construction equipment - sidewalk-shed installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code.”
- Alteration, filed Aug 12, 2019, estimated cost $3K, described as “Installation of heavy duty sidewalk shed for remedial repairs. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.”

## Property taxes

- Assessment: $9,002,700
- 2026–27 tax: $950,086
- Market value (city estimate): $20,006,000
- Taxable value: $8,758,170
- Assessed land: $2,470,500
- Assessed improvements: $6,532,200

## Zoning

C6-6: floor area ratio 10.50 built, 15.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.