# 204 West 55th Street, Manhattan

Apartment Building · 48 units · built c. 1900 · Block 1026, Lot 37.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1010260037/204-west-55-street

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

Every lot on block 1026: https://umarelli.org/nyc/manhattan/1026.md

## Building permits

- Alteration, filed Aug 21, 2026, estimated cost $4K, described as “Installation of temporary beta max hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 20, 2026, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jan 13, 2026, estimated cost $8K, described as “Infill existing ADJ lot line window as per plans. Filed in connection with NB at 1710 Broadway (M00903689-I1)”
- Alteration, filed Dec 2, 2025, estimated cost $9K, described as “Installation of pipe scaffolding at roof level for ohp & to support debris netting used for window/fire escape protection. Pipe scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this…”
- Alteration, filed Oct 2, 2025, estimated cost $10K, described as “Installation of temporary roof protection, overhead protection and window protection as per plans. Temporary protection shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 25, 2025, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed May 12, 2025, estimated cost $407K, described as “Facade repairs and limited parapet replacement as per plans; no change in use, egress, or occupancy.”
- Alteration, filed Jan 3, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”

## Building history

- Alteration, filed Jul 27, 2011, permit issued - entire job/work, described as “Filing herewith alt 1 application to change the place of assembly in th cellar and 1ST floor from use group 6 to use group 12 (easting and drinking establishment with no restrictions to entertainment). All work performed under separate…”
- Alteration, filed Aug 1, 2006, permit issued - entire job/work, described as “No Work to be done under this application. Convert part of 1st floor and cellar to an eating and drinking establishment. Obtain new amended CO. All other Alt 2 applications such as : PL, SP, MH, FP, FA, EQ-Fence, Sign ,Marquee and PA to be…”
- Major Renovation — Conversion, filed Jul 21, 2004, permit issued - entire job/work, 47 units added, 7 stories, described as “Filed in conjunction with 210 west 55TH street to indicate description of zoning lot.”
- Major Renovation — Conversion, filed Feb 18, 1994, plan exam - disapproved, 46 units added, 7 stories, described as “Correct uses on 1ST flr.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $3,019,950
- 2026–27 Tax: $364,893
- Market value (city estimate): $6,711,000
- Taxable value: $2,933,460
- Assessed land: $1,125,000
- Assessed improvements: $1,894,950

## Zoning

C6-6: floor area ratio 5.83 built, 15.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Helen Hayes Theatre TDR II (City Planning P2015M0409): Completed, decided Sep 16, 2016. Certification to transfer of development rights pursuant to 81-744(a) for a proposed development located at 1710 Broadway