## Building permits

- Alteration, filed Feb 13, 2026, estimated cost $110K, described as “Removal and construction of interior partitions, finishes, doors, and ceiling. No change in use, egress or occupancy.”
- Alteration, filed Nov 14, 2025, estimated cost $2.7M, described as “Interior renovations - partitions, ceilings, doors and finishes as shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 1, 2025, estimated cost $175K, described as “Interior non-structural demolition and interior construction as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 1, 2025, estimated cost $212K, described as “Interior renovations of existing business space use. Removal and construction of interior partitions, finishes, doors, ceilings, and office fronts. No change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2025, estimated cost $15K, described as “Modifications to mechanical ductwork and related piping as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2025, estimated cost $150K, described as “Convert two storage closets into two new additional visitor's offices as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 17, 2025, estimated cost $720, described as “Erect accessory business sign for naya, no change in use, egress or occupancy.”
- Alteration, filed Dec 5, 2024, estimated cost $200K, described as “Modifications to mechanical ductwork and related piping as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 5, 2024, estimated cost $600K, described as “Interior fit out, partitions, ceilings, doors and finishes as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 4, 2024, estimated cost $30K, described as “Modifications to sprinkler heads and related piping as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 4, 2024, estimated cost $35K, described as “Modifications to plumbing fixtures and related piping as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 19, 2024, estimated cost $9K, described as “Modifications to sprinkler heads and related piping as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 19, 2024, estimated cost $9K, described as “Modifications to plumbing fixtures and related piping as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 19, 2024, estimated cost $340K, described as “Modifications to mechanical ductwork and related piping as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 19, 2024, estimated cost $300K, described as “Modifications of partitions and office fronts as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 24, 2024, estimated cost $5K, described as “Temporary structures for an events at Spyscape. Removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed Sep 24, 2024, described as “TPA: Spyscape Miro Symposium - 230 persons max - October 8, 2024 & October 9, 2020 from 9am - 6:30pm”
- Alteration, filed Jul 18, 2024, estimated cost $1.6M, described as “Removal and new installation of ductwork, new fan powered boxes and water cooled supplemental AC units as shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 17, 2024, estimated cost $277K, described as “Modify sprinkler heads and related piping as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 17, 2024, estimated cost $231K, described as “Modification to plumbing fixtures and related piping as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 17, 2024, estimated cost $6.4M, described as “Modification to interior partitions, ceilings, doors and finishes as shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 16, 2024, estimated cost $130K, described as “Structural work associated with slab removal as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Jun 13, 2024, estimated cost $5K, described as “Modify sprinkler heads and related piping. No change in use, egress or occupancy.”
- Alteration, filed Jun 13, 2024, estimated cost $35K, described as “Modify plumbing fixtures and related piping. No change in use, egress or occupancy.”
- Alteration, filed Jun 13, 2024, estimated cost $25K, described as “Minor interior renovation to existing space for new tenant. No change in use, egress or occupancy.”

61 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1010260055/250-west-55-street.

## Building history

- New Building — Tower, filed Dec 11, 2007, plan exam - approved, 26 stories
- New Building — High-Rise, filed Aug 16, 2007, permit issued - entire job/work, 40 stories
- Demolition, filed May 25, 2007, signed off Apr 24, 2008, stories 12 to 0
- Alteration, filed Oct 30, 1992, signed off Sep 14, 1994, described as “Changing use of bldg from manufacturing to offices (use group 6) no work to be done under this application.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $253,665,900
- 2026–27 Tax: $26,643,865
- Market value (city estimate): $563,702,000
- Taxable value: $245,362,050
- Assessed land: $18,334,350
- Assessed improvements: $235,331,550

## Zoning

C6-4 (part of the lot is C6-5): floor area ratio 18.16 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- BOOTH & SHUBERT THEATERS (City Planning P2008M0037): Completed, decided Jul 3, 2008. 08DCP008M: SEEKING ZONING AUTH. TO ALLOW THE TRANSFER OF UNUSED DEVELOP MENT RIGHTS FROM THE BOOTH & SHUBERT THEATER TO THE PROJECT SITE