# 200 Central Park South, Manhattan

Co-op · 309 units · built 1963 · Block 1030, Lot 29.

On Umarelli: https://umarelli.org/nyc/1010300029/200-central-park-south

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

Every lot on block 1030: https://umarelli.org/nyc/manhattan/1030.md

## Building permits

- Alteration, filed Oct 6, 2026, estimated cost $69K, described as “Nterior renovation to apartment number 15L. No chanhe of use, occupancy or egress.”
- Alteration, filed Jul 22, 2026, estimated cost $100K, described as “Minor interior renovation of existing commercial space. No change in use, egress, or occupancy.”
- Alteration, filed Jun 30, 2026, estimated cost $67K, described as “Interior renovation to apartment number 11K. No chanhe of use, occupancy or egress.”
- Alteration, filed Jun 4, 2026, estimated cost $209K, described as “Demolition/construction of the 14A floor interior in 200 central park south no change of use, egress or occupancy.”
- Alteration, filed May 28, 2026, estimated cost $425K, described as “Interior renovations to apartment 24A including removal and installation of non-load bearing partitions and related finishes. No change in use, egress or occupancy”
- Alteration, filed Apr 16, 2026, estimated cost $152K, described as “Interior renovation to apartment number 11G. No chanhe of use, occupancy or egress.”
- Alteration, filed Dec 5, 2025, estimated cost $76K, described as “Interior alteration within existing tenant space ste 214 on 1ST floor in existing building: new non-bearing interior partitions, new interior finishes, new millwork. No change to occupancy, egress or use.”
- Alteration, filed Oct 9, 2025, estimated cost $263K, described as “Herewith file plans to renovate apartment 18BC. Work to include removing and installing non load bearing partitions, finishes. No change to use, occupancy or egress.”
- Alteration, filed Aug 12, 2025, estimated cost $119K, described as “Interior renovation to apartment number 19H. No change of use, occupancy or egress.”
- Alteration, filed Jun 18, 2025, estimated cost $300K, described as “Interior renovation of apt #20C. New finishes & millwork, replacement of kitchen & bathroom fixtures & appliances (filed under separate DOB application). Replace windows in existing opening. New LED interior lighting. No change in use,…”
- Alteration, filed Mar 13, 2025, estimated cost $20K, described as “Respectfully request to file to Install new plumbing piping & fixtures for apartment renovation. No change in use, egress, or occupancy.”
- Alteration, filed Mar 11, 2025, estimated cost $16K, described as “Respectfully request to file for the removal of 2 chilled water/hot water fan coil units (fcu) with associated controls, and provide 2 new fcu with associated duct work, piping, controls, and accessories.”
- Alteration, filed Mar 11, 2025, estimated cost $5K, described as “Alt application to install new mechanical system at 1ST floor commercial bike rental shop. No change is use, egress or occupancy”
- Alteration, filed Mar 11, 2025, estimated cost $8K, described as “Sprinkler alt application to install new sprinklers system at commercial bike rental shop on the 1ST floor. No change in use, egress , or occupancy.”
- Alteration, filed Mar 10, 2025, estimated cost $209K, described as “Respectfully request to file gut renovation including non load bearing partitions, flooring, cabinetry & finishes. No change in use, egress, or occupancy.”
- Alteration, filed Mar 3, 2025, estimated cost $95K, described as “Interior renovation of cooperative apartment 6N. No change to use, occupancy, or egress.”
- Alteration, filed Dec 20, 2024, estimated cost $119K, described as “Interior renovation to apartment number 4H. No change of use, occupancy or egress.”
- Alteration, filed Dec 12, 2024, estimated cost $10K, described as “Installation and use of the temporary working platform as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Dec 11, 2024, estimated cost $75K, described as “Renovation of existing bathrooms in apt 9B, 9th & 8th floor. Work to include removal and replacement of finishes and plumbing fixtures. No change in use, egress, nor occupancy.”
- Alteration, filed Dec 11, 2024, estimated cost $133K, described as “Interior renovation of apt #20G per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 3, 2024, estimated cost $9K, described as “Filing to provide new mobile ventless hood unit at existing commercial kitchen. No physical work of any kind to be performed under this filing. There will be no change in use, egress or occupancy.”
- Alteration, filed Oct 25, 2024, estimated cost $126K, described as “Interior renovation to apartment 28B. No change in use, occupancy, or egress.”
- No Work, filed Aug 23, 2024
- Alteration, filed Jul 30, 2024, estimated cost $26K, described as “Selective brick replacement, brick pinning, concrete repair, lintel repair, masonry pointing. No change in use, egress or occupancy.”
- Alteration, filed Jul 2, 2024, described as “Installation of suspended scaffold for facade inspection/ repair.”

47 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1010300029/200-central-park-south.

## Property taxes

- Assessment: $77,776,650
- 2026–27 tax: $8,512,364
- Market value (city estimate): $172,837,000
- Taxable value: $72,996,783
- Assessed land: $17,640,000
- Assessed improvements: $60,136,650

## Tax breaks

- Co-op and condo abatement, with no end date, a $568,683 credit this tax year.

## Zoning

C5-1 (part of the lot is R10H): floor area ratio 17.29 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 2, 2026: $3,610,000
- Sep 1, 2026: $2,450,000
- Jul 14, 2026: $2,807,000
- Jun 24, 2026: $1,435,000
- Jun 23, 2026: $560,000
- Jun 1, 2026: $1,025,000
- Mar 2, 2026: $4,200,000
- Feb 26, 2026: $875,000
- Feb 11, 2026: $1,675,000
- Feb 5, 2026: $970,000

The 10 most recent of 126 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 2019-10-BZ): Variance or special permit, Granted, filed Jan 18, 2019, decided Aug 13, 2019. Special Permit (§73-36) to permit the operation of a Physical Cultural Establishment (305 Fitness) to be located on the first floor of an existing commercial building contrary to ZR §32-10. C5-1/R10H zoning district.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
