# 210 Central Park South, Manhattan

Co-op · 88 units · built 1968 · Block 1030, Lot 39.

On Umarelli: https://umarelli.org/nyc/1010300039/210-central-park-south

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

Every lot on block 1030: https://umarelli.org/nyc/manhattan/1030.md

## Building permits

- Alteration, filed Jul 31, 2026, described as “Suspeded Scaffold for Facade Restoration/Repair”
- Alteration, filed May 18, 2026, estimated cost $240K, described as “Condenser water piping reroute: remove existing leaking condenser water express risers and provide new exterior supply and return risers along the south facade. No change to use, egress, or occupancy.”
- Alteration, filed Apr 23, 2026, estimated cost $36K, described as “Reconnect existing low pressure gas line and remove gas booster. No change in means of egress use group or occupancy.”
- Alteration, filed Mar 27, 2026, estimated cost $220K, described as “Propose to perform renovation of 21st floor Apartment D. No change in use, egress or occupancy.”
- Alteration, filed Mar 6, 2026, estimated cost $20K, described as “Propose to perform mechanical work. No change in use, egress or occupancy.”
- Alteration, filed Mar 4, 2026, estimated cost $50K, described as “Propose to perform plumbing renovations of existing residential apartment. No change to use, egress or occupancy.”
- Alteration, filed Aug 11, 2025, estimated cost $30K, described as “Propose to perform mechanical work. No change to use, egress or occupancy.”
- Alteration, filed Aug 11, 2025, estimated cost $60K, described as “Propose to perform plumbing work. No change to use, egress or occupancy.”
- Alteration, filed Jul 24, 2025, estimated cost $310K, described as “Propose to perform interior renovations to combine existing apartments 6C and 6D. No change in use, egress or occupancy.”
- Alteration, filed May 19, 2025, estimated cost $1K, described as “Installation of temporary pipe scaffold as per plan. No change in use, egress, or occupancy. The pipe scaffold at the west, north, and the east elevation bulkhead from the main roof past the bulkhead top of the bulkhead.”
- Alteration, filed Nov 28, 2023, estimated cost $472K, described as “Replacement (1) new roof mounted cooling tower, non combustible (2) cells. Same location as previously existing. Reuse supports. No change in egress use group or occupancy.”
- Alteration, filed Apr 18, 2023, estimated cost $587K, described as “Sidewalk and plaza replacement and waterproofing, limited rooftop railing modification, masonry repairs at rooftop bulkhead. No change in use, egress or occupancy.”
- Alteration, filed Feb 8, 2022, described as “Installation of temporary storage as per plan. No change in use,egress or occupancy”
- Alteration, filed Oct 13, 2021, estimated cost $170K, described as “Repairs to exterior concrete balconies. No change in use, egress or occupancy.”
- Alteration, filed Dec 17, 2020, estimated cost $24K, described as “Plumbing work for combination of apts 23A and 23B filed in conjunction with DOB now hub filing. No change to use, occupancy or egress.”
- Alteration, filed Aug 4, 2020, estimated cost $35K, described as “Minor plumbing changes filed in conjunction with interior apartment renovation filed under 140930278, as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Apr 24, 2020, described as “Sidewalk shed proposed installation of sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Apr 3, 2019, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

## Property taxes

- Assessment: $21,181,950
- 2026–27 tax: $2,098,545
- Market value (city estimate): $47,071,000
- Taxable value: $18,160,670
- Assessed land: $4,194,000
- Assessed improvements: $16,987,950

## Tax breaks

- Co-op and condo abatement, with no end date, a $160,469 credit this tax year.

## Zoning

R10H: floor area ratio 12.15 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Mar 11, 2026: $2,950,000
- Oct 21, 2025: $7,000,000
- Jan 31, 2025: $2,750,000
- Dec 30, 2024: $5,933,000
- Sep 13, 2024: $2,217,500
- Jun 26, 2024: $6,750,000
- Jun 26, 2023: $2,750,000
- May 17, 2023: $3,800,000
- Jan 23, 2023: $2,100,000
- Jul 11, 2022: $1,545,000

The 10 most recent of 21 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
