230 Central Park South, Manhattan
Co-op · 75 units · built c. 1938 · Block 1030, Lot 48.
Building permits
- Alteration, filed Jul 31, 2026, estimated cost $125K, described as “Proposed interior alteration/modifications including kitchen, bathrooms, finishes and installation of new washer & dryer in apartment 8G as shown on plans. Replacement of windows. Application filed in conjunction with M01410154-S1 (ms) and…”
- Alteration, filed Jun 26, 2026, estimated cost $52K, described as “Work to APT9B/10A on the 9TH and 10TH floors of an existing 17-story, multiple dwelling building. Alterations to include relocated partitions and select finish replacement. No change to zoning, use, egress, or occupancy under this…”
- Alteration, filed Dec 22, 2025, estimated cost $59K, described as “Building lobby renovation including removal and installation of non bearing partitions and related finishes, and replacement of entry doors as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 15, 2025, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Feb 6, 2025, described as “Inspect the Gamma and Delta exterior building wall location”
- Alteration, filed Oct 9, 2024, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed shall comply with 2022 NYC building code,chapter 33.”
- Alteration, filed Sep 5, 2024, estimated cost $50K, described as “Interior renovation of Apts. 7D, and 8D . No change to use, egress or occupancy.”
- Alteration, filed Aug 20, 2024, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Aug 13, 2024, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2022 code.”
- Alteration, filed May 29, 2024, estimated cost $568K, described as “Demolition of existing non-loadbearing walls.. Construct new walls, relocate kitchen, modify and relocate bathrooms and enlarge connecting stair between floors. Replace existing windows. No change to use, occupancy or egress.”
- Alteration, filed Jan 25, 2024, estimated cost $10K, described as “PL in conjunction with GC #M00887407-I1”
- Alteration, filed Sep 20, 2023, estimated cost $28K, described as “6D: installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 20, 2023, estimated cost $218K, described as “6D: Interior Partitions and finishes as per plans filed herewith. No Change to use, egress or occupancy.”
- Alteration, filed Jul 7, 2023, estimated cost $150K, described as “Interior renovation of apartment 3G, no change to use, egress or occupancy.”
- Alteration, filed Jun 21, 2023, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 23, 2022, described as “Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.”
- Alteration, filed Jul 22, 2022, estimated cost $10K, described as “Minor renovation - remove partial partition to create an opening for new window. remove existing door and demolish the partition area to create new door opening. plumbing work to be filed under laa. no change in use, egress or occupancy.”
- Alteration, filed Mar 21, 2022, estimated cost $140K, described as “Facade Repair Project - No changes to use, egress, or occupancy”
- Alteration, filed Jun 18, 2020, estimated cost $14K, described as “This alt 2 application is being filed herewith for structural work related to DOB #140725605. Work to include relocation of duplex convenience stair. No change to use, egress or occupancy”
- Alteration, filed Jun 18, 2020, estimated cost $6K, described as “Filing alt-2 application for interior renovation of apartment 2F on 2nd floor. Replace plumbing fixtures in existing location and new (3) plumbing fixtures. No change to use, egress or occupancy.”
- Alteration, filed Jun 14, 2020, estimated cost $60K, described as “Installation of mechanical units as per plans filed herewith,”
- Alteration, filed Jun 14, 2020, estimated cost $26K, described as “Installation of plumbing fixtures as per plans filed herewith”
- Alteration, filed Sep 19, 2018, estimated cost $21K, described as “AT&T - Replacement of existing antennas and existing RRH units on the roof. Replacement of existing equipment cabinet in the equipment room in the cellar. All work in compliance with TPPN 5/98. No change to occupancy, use or egress.”
Building history
- Alteration, filed Aug 2, 2016, permit issued - entire job/work, described as “This alteration type i application is being filed to relocattion of the the floors on 14TH, 17TH, 18TH & 19TH.”
- Major Renovation — Conversion, filed Mar 22, 2000, plan exam - disapproved, 89 units added, 17 stories, described as “Change of use from apartment to denist o ffice as per plan. Obtain amend ed certifcate of occupancy.no work to be performed under alt. No. 102331255.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $10,318,050
- 2026–27 Tax
- $1,139,762
- Market value (city estimate)
- $22,929,000
- Taxable value
- $9,771,368
- Assessed land
- $2,772,000
- Assessed improvements
- $7,546,050
Tax breaks
- Co-op and Condo Abatement, with no end date, a $74,109 credit this tax year.
Zoning
R10H: floor area ratio 11.00 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 18, 2026: $505,000
- Dec 4, 2025: $2,250,000
- Mar 13, 2024: $2,575,000
- Jan 18, 2024: $3,200,000
- Nov 8, 2023: $1,315,000
- Aug 25, 2023: $27,885
- May 26, 2023: $9,799,200
- Mar 2, 2023: $4,500,000
- Feb 2, 2023: $1,250,000
- Aug 10, 2022: $6,200,000
The 10 most recent of 24 open-market sales since 2016, from the Department of Finance’s sales files.