356 West 48th Street, Manhattan
Apartment Building · 20 units · built c. 1920 · Block 1038, Lot 60.
Building permits
- Alteration, filed Sep 24, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Sep 23, 2026, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 23, 2026, estimated cost $1K, described as “Installation of temporary protection as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Jun 25, 2026, estimated cost $39K, described as “Brick replacement, mortar repointing, and other related work at west elevation facade.”
- Alteration, filed May 31, 2023, estimated cost $5K, described as “Mechanical system for interior renovations in a 5 story with cellar building, altering the first floor units to be duplexes with the cellar.”
- Alteration, filed Oct 25, 2022, estimated cost $7K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 25, 2022, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 21, 2022, estimated cost $598K, described as “Interior renovations in a 5 story with cellar building, altering the first floor units to be duplexes with the cellar.”
- Alteration, filed Sep 23, 2022, estimated cost $5K, described as “Plumbing for interior renovation to an existing 5 story with cellar building.”
- Alteration, filed Jul 5, 2022, estimated cost $179K, described as “Interior renovations and facade repairs in a 5 story with cellar building”
Building history
- Alteration, filed Dec 7, 2018, plan exam - approved, described as “Interior renovation and window replacement in existing 5 story building due to long term vacancy as per pland filed herewith”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $1,520,550
- 2026–27 Tax
- $181,151
- Market value (city estimate)
- $3,379,000
- Taxable value
- $1,456,318
- Assessed land
- $112,500
- Assessed improvements
- $1,408,050
Zoning
R8: floor area ratio 3.94 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Dec 6, 2024: $11,800,000
- Dec 12, 2022: $4,650,000
- Oct 20, 2021: $2,650,000
Open-market sales since 2016, from the Department of Finance’s sales files.