# 1 Columbus Circle, Manhattan

Condominium · 225 units · built 2004 · Block 1049, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1010497501/1-columbus-circle

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

Every lot on block 1049: https://umarelli.org/nyc/manhattan/1049.md

## Building permits

- Alteration, filed Oct 7, 2026, estimated cost $266K, described as “Combine Apt 62A & 62F on 35th Floor. Interior renovation. Remove and Construct of non-bearing or non-structural partitions. No change use, egress or occupancy. Under TPPN 3/97, No change in C of O is required. Not a quality housing project.”
- Alteration, filed Oct 5, 2026, estimated cost $93K, described as “Renovation of an existing corridor as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Sep 1, 2026, estimated cost $190K, described as “Removal of existing interior elements and new construction of partitions and ceilings as shown on drawings. No change in use, egress or occupancy.”
- Alteration, filed Aug 31, 2026, estimated cost $501K, described as “Madewell (SPACE#202/3rd construction/2nd floor marketing) --general construction inclusive of interior partitions modifications for retail renovation. No change to use, egress, or occupancy.”
- Alteration, filed Aug 19, 2026, estimated cost $22K, described as “Repair damaged stones and remove and replace sealants as shown on drawings. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2026, estimated cost $326K, described as “Interior apartment renovation as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Aug 4, 2026, estimated cost $177K, described as “Mechanical modifications taking place on the 15th floor (19th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 7, 2026, estimated cost $130K, described as “Interior renovation as shown. No change to use, egress or occupancy. No structural work.”
- Alteration, filed Jun 22, 2026, estimated cost $21.0M, described as “Renovation to existing hotel with minor changes to use, egress and occupancy including the hotel lobby, amenity floors and change in number of guest rooms on various floors.”
- Alteration, filed Jun 19, 2026, estimated cost $1.1M, described as “Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.”
- No Work, filed Jun 1, 2026, described as “Temporary event " JP Morgan Reception"”
- Alteration, filed May 13, 2026, estimated cost $30K, described as “Modifications to plumbing systems as per plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed Mar 9, 2026, estimated cost $10K, described as “Remove part of ceiling and reconfigure access panel in mech closet. Provide new suspended ceiling. New access panel. No change in use, egress or occupancy”
- Alteration, filed Feb 27, 2026, estimated cost $105K, described as “Addition/Modification to existing HVAC System as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Oct 17, 2025, estimated cost $100K, described as “Modification of mechanical systems as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Oct 17, 2025, estimated cost $2.1M, described as “Installation of chiller & ductwork as per plans.”
- Alteration, filed Oct 17, 2025, estimated cost $90K, described as “Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.”
- Alteration, filed Oct 16, 2025, estimated cost $810K, described as “Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Oct 1, 2025, estimated cost $1.0M, described as “Interior renovation of existing demised retail tenant, new non-load bearing partitions, ceilings and finishes on 2nd & 3rd Floor Marketing/3rd & 4th Floor Construction as shown on drawings. No change in use, egress or occupancy.”
- Alteration, filed Oct 1, 2025, estimated cost $10K, described as “Use of magni telehandler for glass replacement as per plans.”
- Alteration, filed Sep 23, 2025, estimated cost $52K, described as “Removal and installation of interior non load bearing partitions and related finishes as per drawings filed herewith. No change in use egress or occupancy.”
- No Work, filed Sep 18, 2025, described as “Immersive holiday dinner theater with live music and entertainment”
- Alteration, filed Sep 16, 2025, estimated cost $93K, described as “Installation of Battery Charging room for E-bikes in the Sub-Cellar #1 tenant space (Whole Foods Market). No change in occupancy, use or egress.”
- Alteration, filed Sep 2, 2025, estimated cost $31K, described as “Modification of mechanical systems as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Sep 2, 2025, estimated cost $13K, described as “Modifications to sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.”

183 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1010497501/1-columbus-circle.

## Property taxes

- Assessment: $871,099,981
- 2026–27 tax: $78,344,509
- Market value (city estimate): $1,936,566,488
- Taxable value: $713,259,460
- Assessed land: $112,337,384
- Assessed improvements: $758,762,597
- Condo units with their own tax lots: 235

## Tax breaks

- Co-op and condo abatement, with no end date, a $177,644 credit this tax year.

## Zoning

C6-6: floor area ratio 14.05 built, 15.00 allowed by base zoning.

## Recent sales

- Sep 23, 2026: $6,020,000, Apt ST57B
- Sep 1, 2026: $6,500,000, Apt ST59D
- Jul 16, 2026: $70,000, Apt SU-21
- Mar 26, 2026: $6,000,000, Apt NT68A, sold with other lots
- Mar 17, 2026: $18,000,000, Apt ST72B
- Mar 17, 2026: $190,000, Apt SU-30
- Feb 20, 2026: $4,950,000, Apt ST72E
- Feb 13, 2026: $12,500,000, Apt ST74B
- Jan 13, 2026: $50,700,000, Apt STPH8
- Oct 9, 2025: $4,773,000, Apt ST52G

The 10 most recent of 89 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Change to an earlier grant (Board of Standards and Appeals 119-03-BZII): Change to an earlier grant, Granted, filed Oct 1, 2013, decided Jan 28, 2014. Extension of term of a special permit (§73-36) to allow the continued operation of a physical culture establishment (Equinox), which expired on September 16, 2013. C6-6 (MID) zoning district.
- Variance or special permit (Board of Standards and Appeals 119-03-BZ): Variance or special permit, Granted, filed Apr 14, 2003, decided Sep 16, 2003. Special Permit (§73-36) to permit the creation of a physical culture establishment within portions of a fifty four story mixed use building currently under construction on a corner lot, extending from West 58th Street to West 60th Street,…
- COLISEUM SITE REDEVELOPMENT (City Planning P1989M0203): Completed, decided May 4, 1989. 3RD AMENDED & RESTATED URP TO CONSIST OF A MIXED-USE\*DEVELOPMENT TO INCLUDE OFFICE, RETAIL & RESDL APTS & POSS-\*BLY HOTEL, SERVICE & ENTERTAINMENT USES IN COLUMBUS CIRCLE\*URBAN RENEWAL AREA
- NEW COLISEUM PROJECT (City Planning P1986M0674): Completed, decided Feb 5, 1987. SPEC PERM FOR A FLR AREA BONUS FOR SUBWAY STATION IMPROVE-\*MENT IN CONNECTION W/THE DEVELOPMENT OF A MIXED USE BLDG.\*BL1049. LOT29.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
