# 425 West 50th Street, Manhattan

Condominium · 51 units · built c. 1931 · Block 1060, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1010607502/425-west-50-street

More construction in Hell's Kitchen: https://umarelli.org/nyc/manhattan/hells-kitchen.md

Every lot on block 1060: https://umarelli.org/nyc/manhattan/1060.md

## Building permits

- Alteration, filed Apr 21, 2026, estimated cost $10K, described as “Installation of new 8 inch check valve on existing fire sprinkler system feeding existing basement cable vault as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Aug 19, 2025, described as “IRA to assist with Condition Assessment.”
- Alteration, filed May 21, 2025, estimated cost $169K, described as “Installation of HVAC work for stacked dryers at basement. No change to use, occupancy, or egress.”
- Alteration, filed May 21, 2025, estimated cost $7K, described as “Modification of existing automatic sprinkler system as per plans filled herewith. Proposed sprinkler system is designed as per NFPA 13, as modified by BC Appendix Q. No change to use, occupancy, or egress.”
- Alteration, filed May 21, 2025, estimated cost $112K, described as “Filing herewith for plumbing work (sanitary, vent, & water) for an existing multi family building as indicated on plans. No change in use, egress, or occupancy.”
- Alteration, filed May 1, 2025, estimated cost $128K, described as “The proposed project is the design and renovation of specific areas within the basement at 425 W 50th Street, NY NY 10019 for Stella Tower as described herein. No change to use, occupancy, or egress.”
- Alteration, filed Oct 25, 2024, estimated cost $38K, described as “Minor interior alterations for existing residential apartment unit #12H. No change in egress, use, occupancy and structure under this application.”
- Alteration, filed Aug 2, 2024, estimated cost $400K, described as “Exterior facade and roofing repairs. No change to use, egress, or occupancy.”
- Alteration, filed Jul 30, 2024, described as “Installation of suspended scaffold for facade work and/or inspection. Amend #2, added scaffold drops ,and outrigger detail. Amend #3, added welding detail and overhang beam options. Amend #4, added ctwt hanger and frame base detail note…”
- Alteration, filed Jan 17, 2024, described as “Installation of pipe scaffold as per plan. No change in use, egress or occupancy.”
- Alteration, filed Oct 6, 2023, estimated cost $18K, described as “Filing for exterior masonry and waterproofing repairs as per drawings. No change in use, egress or occupancy is involved under this application.”
- Alteration, filed Nov 30, 2022, estimated cost $2.6M, described as “Chiller and Cooling Tower upgrade and realted piping & ductwork”
- Alteration, filed Nov 15, 2022, estimated cost $15K, described as “Plumbing work related to installation of chiller & cooling tower.”
- Alteration, filed Nov 14, 2022, estimated cost $1.0M, described as “General Construction work related to Chiller & Cooling Tower upgrades. Scope also includes new concrete housekeeping pad, concrete curb and modification to the existing steel dunage”
- Alteration, filed Jun 28, 2022, estimated cost $15K, described as “Construction fence to enclose the worksite. No change in use egress or occupancy.”
- Alteration, filed Jan 2, 2020, estimated cost $50K, described as “Installation of a temporary scaffold as per plans in conjunction with general construction. No change in use,egress or occupancy. Scaffold shall comply with 2014 NYC building code, chapter 33.”
- Alteration, filed Nov 6, 2019, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed to comply with chapter 33 of NYC building code of 2014.”

## Property taxes

- Assessment: $36,574,205
- 2026–27 Tax: $3,636,149
- Market value (city estimate): $81,275,999
- Taxable value: $32,557,873
- Assessed land: $2,385,450
- Assessed improvements: $34,188,755
- Condo units with their own tax lots: 61

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $90,688 credit this tax year.

## Zoning

R8: floor area ratio 9.68 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 1, 2026: $1,515,000, Apt 14D
- Jun 17, 2026: $2,100,000, Apt 15G
- Nov 12, 2025: $3,700,000, Apt 14E
- Aug 26, 2025: $4,175,000, Apt 10C
- Apr 17, 2025: $2,600,000, Apt 12G
- Mar 29, 2024: $1,130,000, Apt 12J
- Mar 5, 2024: $1,980,000, Apt 12H
- Aug 28, 2023: $9,500,000, Unit PH-A
- Aug 4, 2023: $1,415,000, Apt 11J
- Jun 2, 2022: $1,930,000, Apt 12F

The 10 most recent of 40 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
