# 547 West 47th Street, Manhattan

Condominium · 222 units · built 2020 · Block 1076, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1010767502/547-west-47-street

More construction in Hell's Kitchen: https://umarelli.org/nyc/manhattan/hells-kitchen.md

## Building permits

- Alteration, filed Feb 21, 2025, described as “Suspended scaffold outrigger system for exterior restoration work at 646 11 avenue, manhattan, ny 10036.”
- Alteration, filed Oct 4, 2023, estimated cost $1K, described as “Filing of alt-2 for existing equipment use permits. No work on site to be done.”
- Alteration, filed Jun 2, 2023, estimated cost $7K, described as “Interior renovation of the apt #914 on the 9th floor. No change in use, egress or occupancy.”
- Alteration, filed Jun 2, 2023, estimated cost $7K, described as “Interior plumbing work in apt #914 on the 9th floor. No change in use, egress or occupancy.”
- Alteration, filed Feb 14, 2023, estimated cost $160K, described as “Mechanical work as shown on plans. Modify existing ductwork. No change to existing equipment. No change in means of egress, use group, or occupancy.”
- Alteration, filed Sep 11, 2022, estimated cost $20K, described as “Modification of sprinkler system as shown on plans. No change in means of egress, use group, or occupancy.”
- Alteration, filed Jul 19, 2022, estimated cost $30K, described as “Modification of plumbing system as shown on plans. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.”
- Alteration, filed Apr 21, 2022, estimated cost $1.1M, described as “Interior alteration for new Cadillac dealership as shown on plans”
- Alteration, filed Mar 22, 2022, estimated cost $6K, described as “Erect illuminated accessory business wall sign; copy reading "Logo Cadillac"”
- Alteration, filed Mar 22, 2022, estimated cost $6K, described as “Erect illuminated accessory business wall sign; copy reading "Logo Cadillac"”
- Alteration, filed Mar 22, 2022, estimated cost $2K, described as “Erect non-illuminated accessory business wall sign; copy reading "Sales & Certified Service Valet"”
- Alteration, filed Mar 22, 2022, estimated cost $6K, described as “Erect illuminated accessory business wall sign; copy reading "Logo Cadillac"”
- Alteration, filed Mar 15, 2022, estimated cost $110K, described as “Structural work as shown on plans”
- Alteration, filed Jun 18, 2021, estimated cost $2K, described as “Application filed for 14 ft curb cut along west 47th street under separate DOB Now application M00109134-P1”
- Alteration, filed Apr 30, 2021, estimated cost $5K, described as “Installation of pipe scaffold as per plans. Pipe scaffolding shall comply with chapter # 33 of the code 2014, no changes to use, egress and occupancy.”
- Alteration, filed Mar 2, 2020, estimated cost $19K, described as “Installation of scaffold as per pipe drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 18, 2019, estimated cost $58K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 31, 2019, estimated cost $21K, described as “Herewith filing plumbing work in conjunction with a temporary sales office buildout. This is in conjunction with a new building application.”
- Alteration, filed Jul 30, 2019, estimated cost $15K, described as “Herewith filing sprinkler modification in conjunction with a temporary sales office buildout. This is in conjunction with a new building application.”
- Alteration, filed Jul 30, 2019, estimated cost $42K, described as “Herewith filing mechanical work in conjunction with a temporary sales office buildout. This is in conjunction with a new building application.”
- Alteration, filed Jul 11, 2019, estimated cost $68K, described as “Installation of heavy duty sidewalk shed during new building construction, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 11, 2019, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Dec 20, 2018, estimated cost $2K, described as “Herewith filing curb cut work for new 12-story, multifamily residential building with commercial at the ground floor.”
- Alteration, filed Nov 5, 2018, estimated cost $5K, described as “Installation of construction fence as per plans filed herewith. Fence filed in conjunction with NB application 121204302.”
- Alteration, filed Aug 3, 2018, estimated cost $12K, described as “Installation of sidewalk shed, overhead protection & pipe scaffold as per plans. Sidewalk shed live load 300 psf. All equipment comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”

1 more, older permit is in this building’s full list on the map: https://umarelli.org/nyc/1010767502/547-west-47-street.

## Property taxes

- Assessment: $45,100,057
- 2026–27 tax: $5,147,712
- Market value (city estimate): $100,222,346
- Taxable value: $42,256,198
- Assessed land: $7,069,952
- Assessed improvements: $38,030,105
- Condo units with their own tax lots: 224

## Zoning

R8A (part of the lot is R8): floor area ratio 6.72 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 11, 2026: $1,950,000, Apt 1112
- Sep 10, 2026: $1,125,000, Apt 1102
- Sep 3, 2026: $835,000, Apt 405
- Aug 24, 2026: $1,355,000, Apt 606
- Aug 17, 2026: $920,000, Apt 422
- Aug 12, 2026: $680,000, Apt 508
- Aug 4, 2026: $1,115,000, Apt 1103
- Jul 27, 2026: $970,000, Apt 615
- Jul 13, 2026: $1,957,000, Apt 1108
- Jul 7, 2026: $1,200,000, Apt 325

The 10 most recent of 134 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[The West Completes Construction at 547 West 47th Street in Hell’s Kitchen, Manhattan](https://newyorkyimby.com/2022/07/the-west-completes-construction-at-547-west-47th-street-in-hells-kitchen-manhattan.html), New York YIMBY, Jul 3, 2022.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
