## Building permits

- Alteration, filed Aug 25, 2026, estimated cost $9K, described as “Proposed installation of temporary fence as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Aug 4, 2026, estimated cost $60K, described as “The scope of work includes all labor, materials, and equipment necesseary to complete the installation of new supplemental cooling split ac system in the second floor kitchen training room.”
- Alteration, filed Aug 3, 2026, estimated cost $1K, described as “Installation of temporary shoring as per plan. There is no change in use, egress, or occupancy.”
- Alteration, filed Jan 27, 2026, estimated cost $6K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 13, 2025, estimated cost $750K, described as “Proposed parking garage repairs as per plans. Work is in conjunction with corrections for garage partial vacate & associated violations. No change in use, egress or occupancy.”
- Alteration, filed Jan 28, 2025, estimated cost $38K, described as “Renovation of existing commercial space to install commercial lockers and create a new interior opening to space as per plans filed. No change in use occupancy or egress”
- Alteration, filed Jan 2, 2025, described as “Installation of temporary suspended scaffold equipment.”
- Alteration, filed Jun 26, 2024, estimated cost $600K, described as “Exterior restoration as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jan 2, 2024, estimated cost $300K, described as “Install emergency temp shoring to w. 51 st garage access ramp & overhead protection to amtrak area below. Work shall stabilize structure & safeguard area below in response ewo violation# FEU10401FF. No change in use, egress or occupancy.”
- Alteration, filed Dec 29, 2023, estimated cost $842K, described as “Rpl concrete slabs at parking garage entrance & ramps, & rpl steel supports at garage entrance as per plans. Remedial work is in conjuction w/ ewo VIOL#FEU10401FF & to correct partial vacate assoc w/ VIOL#35593214J. No change in use,…”
- Alteration, filed Nov 30, 2023, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Nov 27, 2023, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Mar 24, 2023, estimated cost $13K, described as “Installation of chutes on various roof elevation”
- Alteration, filed Nov 7, 2022, estimated cost $25K, described as “Installation of supported scaffold on sidewalk shed and on selected roofs to performe the exterior, roofs and parapet construction work.”
- Alteration, filed Nov 7, 2022, estimated cost $15K, described as “Installation of temporary construction fence on ground floor to protect the public from entering construction site.”
- Alteration, filed Nov 7, 2022, estimated cost $25K, described as “Installation of sidewalk shed on ground floor to protect the publick while construction work is performed on roofs, exterior masonry and parapets”
- Alteration, filed May 2, 2022, estimated cost $54K, described as “Removal and repair of small sections of concrete and metal deck at garage area and terrace above. Partial removal and replacement of existing fireproofing of the garage steel beams as per plans filed no change in use occupancy or egress”
- Alteration, filed Apr 11, 2022, estimated cost $7.7M, described as “Restore exterior masonry, coping stone, replace face brick, repoint, install wall flashing, anti-graffiti coating. Roofing replacement & flashing, roof gravel stops, replace doors at roof. Rebuild corner parapet above entry. Interior wall,…”
- Alteration, filed Feb 5, 2020, estimated cost $30K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (shed) 208 lf, in conjunction with llw # 122078 - no change in use,occupancy or egress”

## Property taxes

- Assessment: $51,749,550
- Market value (city estimate): $114,999,000
- Taxable value: $0
- Assessed land: $13,004,550
- Assessed improvements: $38,745,000

## Zoning

R8 (part of the lot is C6-3): floor area ratio 3.29 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.