660 Joe Dimaggio Highway, Manhattan
Industrial condominium · built 2001 · Block 1096, Lot 7501.
Building permits
- No Work, filed Apr 29, 2026, described as “Conference in the existing banquet hall”
- No Work, filed Apr 20, 2026, described as “Conference in the existing banquet hall”
- No Work, filed Mar 18, 2026, described as “Gala with presentation, exhibitions food and beverage.”
- No Work, filed Mar 17, 2026, described as “Conference in the existing banquet hall.”
- Alteration, filed Mar 16, 2026, estimated cost $600K, described as “Installation of new ducted and cassette unit heat pump system for kitchen, dining area, locker room and spa area with all duct distribution and air outlets.”
- No Work, filed Feb 20, 2026, described as “Conference in the existing banquet hall.”
- No Work, filed Feb 13, 2026, described as “Art fair”
- No Work, filed Jan 16, 2026, described as “Conference with presentations, food and beverage in the banquet hall.”
- No Work, filed Dec 2, 2025, described as “Gala in the existing banquet hall.”
- No Work, filed Nov 20, 2025, described as “Awards gala in the existing banquet hall.”
- Alteration, filed Nov 7, 2025, estimated cost $100K, described as “Interior Renovation on 4th and 5th floor. No change in use, egress or occupancy.”
- No Work, filed Aug 28, 2025
- No Work, filed Aug 28, 2025
- Alteration, filed Mar 28, 2025, estimated cost $100K, described as “Convert existing breakout room into four (4) offices in are "a" and relocate breakout room to area "b" with new kitchenette pantry. Existing ceiling to remain. No change in use or occupancy.”
- Alteration, filed Feb 27, 2025, estimated cost $1.5M, described as “Interior renovation for Spa and Sauna on 4th & 5th floor. No change in use, egress or occupancy.”
- Alteration, filed Feb 19, 2025, estimated cost $285K, described as “Installation of Boilers on 7th for Snow Melt System as per plans filed herewith. No change in use egress or occupancy.”
- No Work, filed Feb 13, 2025, described as “Conference, with exhibitions, food and beverage in the existing banquet ball.”
- No Work, filed Nov 25, 2024, described as “Event with reception and dining.”
- No Work, filed Nov 12, 2024, described as “Corporate event with lectures, and reception with food, beverage and entertainment.”
- No Work, filed Oct 31, 2024, described as “Family event with food, beverage and entertainment.”
- No Work, filed May 7, 2024, described as “Event with presentations, exhibitions and reception with food and beverage. Strength Of A Woman "SOAW".”
- No Work, filed Apr 24, 2024, described as “Event with a presentation and reception, with food and beverage.”
- No Work, filed Apr 8, 2024, described as “Presentations, meeting and reception with food and beverage.”
- No Work, filed Nov 22, 2023, described as “Gala with food and beverage”
- Alteration, filed Nov 16, 2023, estimated cost $5K, described as “Temporary structures for the Glasshouse banquet hall events. Removed at the end of the programing. No changes to existing structures, use or egress”
107 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $32,446,350
- 2026–27 tax
- $446,456
- Market value (city estimate)
- $72,103,000
- Taxable value
- $4,115,562
- Assessed land
- $3,107,700
- Assessed improvements
- $29,338,650
- Condo units with their own tax lots
- 2
Tax breaks
- IDA PILOT, with no end date.
Zoning
M2-4: floor area ratio 2.94 built, 5.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.