# 760 Joe Dimaggio Highway, Manhattan

Car dealer · built c. 1930 · Block 1102, Lot 11.

On Umarelli: https://umarelli.org/nyc/1011020011/760-joe-dimaggio-highway

More construction in Hell's Kitchen: https://umarelli.org/nyc/manhattan/hells-kitchen.md

Every lot on block 1102: https://umarelli.org/nyc/manhattan/1102.md

## Building permits

- Alteration, filed Mar 5, 2026, estimated cost $40K, described as “Modification to existing VERIZON site. Replacement of 9 antennas and 10 RRH units. Installation of 2 new antennas and 3 step-overs.”
- Alteration, filed Jun 18, 2025, described as “IRA for the Beta and Gamma sector location inspection”
- Alteration, filed Sep 4, 2024, estimated cost $4K, described as “Erect illuminated accessory business wall sign; reading " manhattan".”
- Alteration, filed Sep 4, 2024, estimated cost $6K, described as “Erect illuminated accessory business wall sign; copy reading " jeep".”
- Alteration, filed Sep 4, 2024, estimated cost $2K, described as “Erect illuminated accessory business wall sign; copy reading "service exit".”
- Alteration, filed Sep 4, 2024, estimated cost $6K, described as “Erect illuminated accessory business wall sign; copy reading " jeep".”
- Alteration, filed Sep 4, 2024, estimated cost $4K, described as “Erect illuminated accessory business wall sign; copy reading " manhattan".”
- Alteration, filed Sep 4, 2024, estimated cost $6K, described as “Erect illuminated accessory business wall sign; copy reading "jeep".”
- Alteration, filed Sep 4, 2024, estimated cost $1K, described as “Erect illuminated accessory business sign wall sign; copy reading "service".”
- Alteration, filed Sep 4, 2024, estimated cost $6K, described as “Erect illuminated accessory business wall sign; copy reading " jeep".”
- Alteration, filed Sep 4, 2024, estimated cost $4K, described as “Erect illuminated accessory business wall sign; copy reading " manhattan".”
- Alteration, filed May 30, 2024, estimated cost $175K, described as “Exterior alteration consists of removing existing metal panels and replace in-kind with new aluminum composite metal panels and new paint. Electrical filing under M01062821-i1”
- Alteration, filed Apr 20, 2022, estimated cost $5K, described as “AT&T - Removal of existing cabinet on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.”
- Alteration, filed Apr 20, 2022, estimated cost $15K, described as “Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.”
- Alteration, filed Apr 20, 2022, estimated cost $35K, described as “Platform modifications as per plans. Installation of sound wall on platform per plans. No change to occupancy, use, or egress.”
- Alteration, filed Sep 23, 2019, estimated cost $10K, described as “Erect illuminated accessory business wall sign-a on front sign band at 12 avenue elevation, no change to use, egress or occupation”
- Alteration, filed Sep 19, 2019, estimated cost $2K, described as “Erect illuminated accessory business wall sign-f on front sign band at west 55 street elevation, no change to use, egress or occupation”
- Alteration, filed Sep 19, 2019, estimated cost $1K, described as “Erect illuminated accessory business wall sign-d on front sign band at west 55 street elevation, no change to use, egress or occupation”
- Alteration, filed Sep 19, 2019, estimated cost $7K, described as “Erect illuminated accessory business wall sign-k on front sign band at west 54 street elevation, no change to use, egress or occupation”
- Alteration, filed Sep 19, 2019, estimated cost $1K, described as “Erect illuminated accessory business wall sign-h on front sign band at west 54 street elevation, no change to use, egress or occupation”
- Alteration, filed Sep 19, 2019, estimated cost $3K, described as “Erect illuminated accessory business wall sign-c on front sign band at 12 avenue elevation, no change to use, egress or occupation”
- Alteration, filed Sep 19, 2019, estimated cost $3K, described as “Erect illuminated accessory business wall sign-e on front sign band at west 55 street elevation, no change to use, egress or occupation”
- Alteration, filed Sep 19, 2019, estimated cost $3K, described as “Erect illuminated accessory business wall sign-i on front sign band at west 54 street elevation, no change to use, egress or occupation”
- Alteration, filed Sep 19, 2019, estimated cost $5K, described as “Erect illuminated accessory business wall sign-g on front sign band at west 55 street elevation, no change to use, egress or occupation”
- Alteration, filed Sep 19, 2019, estimated cost $2K, described as “Erect illuminated accessory business wall sign-j on front sign band at west 54 street elevation, no change to use, egress or occupation”

4 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1011020011/760-joe-dimaggio-highway.

## Property taxes

- Assessment: $23,373,000
- 2026–27 tax: $2,085,940
- Market value (city estimate): $51,940,000
- Taxable value: $19,228,800
- Assessed land: $3,953,700
- Assessed improvements: $19,419,300

## Zoning

C4-7: floor area ratio 4.34 built, 10.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Dewitt Clinton Park North (629 West 54th Street) (City Planning 2023M0213): Zoning map change, Special permit, Zoning text change, Completed, filed Aug 14, 2025, decided Jul 16, 2026. A private application by 760 12th LLC for a zoning map amendment from M2-4 to C4-7, a zoning text amendment to map a Special Hudson River Park District and MIH area, and a special permit pursuant to ZR 89-21 to facilitate a new 44-story,…

## In the news

[Two-Skyscraper Proposal Revealed For 629 West 54th Street, 801 Eleventh Avenue in Hell’s Kitchen, Manhattan](https://newyorkyimby.com/2025/01/two-skyscraper-proposal-revealed-for-629-west-54th-street-801-eleventh-avenue-in-hells-kitchen-manhattan.html), New York YIMBY, Jan 25, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
