## Building permits

- No Work, filed Sep 17, 2025, described as “5k walk, start and finish line, area for checking and runner support, with monitored entry.”
- No Work, filed Oct 31, 2024, described as “5k walk, start and finish line, area for checking and runner support, with monitored entry.”
- No Work, filed Oct 30, 2023, described as “5K walk, start and finish line, area for checking and runner support”
- No Work, filed Oct 10, 2023, described as “Fundraising event to support addiction treatment. For invited guests only.”
- No Work, filed Sep 22, 2023, described as “Post race outdoor celebration area for Annual MMRF 5k. For invited guests only.”
- Alteration, filed Jul 26, 2023, estimated cost $25K, described as “Application filed to install new type i kitchen hood on 1ST floor,rooftop exhaust fan, make-up air units and ductwork as perplans. Fire suppression system filed separately with the FDNY. Nochange to use, egress, or occupancy.”
- No Work, filed Oct 17, 2022, described as “Fundraising event to support addiction treatment. For invited guests only.”
- Alteration, filed Oct 13, 2022, estimated cost $6K, described as “Installation of temp tents, no alt to exist structures for the Annual MS Bike Fund Raiser TPA permit required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion”
- No Work, filed Oct 7, 2022, described as “Biking, start and finish line, area for checking and runner support. Fund raiser & awareness for MS.”
- No Work, filed Sep 23, 2022, described as “5K walk, start and finish line, area for checking and runner support. Review under building code 2014.”
- No Work, filed Sep 9, 2022, described as “5K walk, start and finish line, area for checking and runner support”
- No Work, filed Jun 15, 2022, described as “Live performance”
- Alteration, filed Mar 2, 2022, estimated cost $33K, described as “Plumbing work in conjunction with alt type2 #123769109. all work as per plans there is no change of use egress or occupancy.”
- Alteration, filed Oct 13, 2021, estimated cost $5K, described as “Pier 84 exterior. Installation of temporary tents for 2021 Bike MSNYC. No alterations to existing structures. A TPA permit is not required.”
- No Work, filed Oct 12, 2021, described as “Fund Raiser for MS exterior in a park”
- No Work, filed Oct 24, 2019, described as “19\_902-Community fund raiser & awareness for brain tumors.”
- No Work, filed Oct 1, 2019, described as “MMRF Team for Cures 5k Walk/Run”
- No Work, filed Sep 20, 2019, described as “A fundraising walk for the nonprofit organization, Shatterproof.”

## Property taxes

- Assessment: $12,856,950
- Market value (city estimate): $28,571,000
- Taxable value: $0
- Assessed land: $9,719,550
- Assessed improvements: $3,137,400

## Zoning

M2-3: floor area ratio 0.24 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NAVD88).

## Board and land use applications

- NY PASSENGER SHIP TERM PIERS 88/90 (City Planning P2006M0138): Completed, decided Nov 10, 2005. CERT THAT NO WATERFRONT PUBLIC ACCESS OR VISUAL CORRIRORS\*ARE REQUIRED FOR THE RENOVATION & WIDENING OF THE PIERS
- HUDSON RIVER PARK SEGMENT 6 (City Planning P2004M0271): Completed, decided May 21, 2004. CERT TO EXEMPT FROM PUBLIC ACCESS & VISUAL CORRIDORS IN\*ORDER TO CONSTRUCT A NEW PUBLIC PARK PIER WITH A BOATHOUSE

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology