# 30 West 63rd Street, Manhattan

Condominium · 454 units · built 1979 · Block 1115, Lot 7503.

On Umarelli: https://umarelli.org/nyc/1011157503/30-west-63-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1115: https://umarelli.org/nyc/manhattan/1115.md

## Building permits

- Alteration, filed Nov 2, 2026, estimated cost $13K, described as “Minor interior renovation for existing apartment unit as per plan submitted herewith. No change in use, egress, or occupancy under this application”
- Alteration, filed Jul 23, 2026, estimated cost $165K, described as “Interior renovation of existing commercial space creating an eating & drinking establishment including installation of non-load bearing partitions, new floor & wall finishes as per the drawings filed herein. Interior demo filed under gc…”
- Alteration, filed Apr 21, 2026, estimated cost $35K, described as “Demo and Construction of non-bearing walls, dismising wall shown on the drawings filed herewith. There will be no change to occupancy, use, or egress.”
- Alteration, filed Oct 16, 2025, estimated cost $239K, described as “Interior renovation of an existing dwelling unit, minor partition work, renovation of 2 existing bathrooms. No change in use, egress and occupancy.”
- Alteration, filed Oct 15, 2025, estimated cost $8K, described as “Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.”
- Alteration, filed Aug 1, 2025, estimated cost $7K, described as “Facade repairs. No change in egress, use or occupancy.”
- Alteration, filed Jun 23, 2025, estimated cost $12K, described as “Mh work in existintg commercial space filed in conjunction with DOB now gc. No change to use, occupancy or egress.”
- Alteration, filed Jun 10, 2025, described as “Installation of suspended scaffold for facade inspection/repair.”
- Alteration, filed May 16, 2025, estimated cost $15K, described as “Interior renovation in existintg commercial space filed in conjunction with DOB now ms. No change to use, occupancy or egress.”
- Alteration, filed Apr 29, 2025, estimated cost $239K, described as “Interior renovation of existing unit 4-KLM. No change to occupancy, use or egress.”
- Alteration, filed Mar 6, 2025, estimated cost $10K, described as “Interior renovation of existing apartment as per plan. Installation of partition and door to create additional room. No change in use, occupancy, or egress.”
- Alteration, filed Jan 31, 2025, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco”
- Alteration, filed Jan 22, 2025, estimated cost $88K, described as “Propose interior renovation @ partial 14th floor floor Apt#14N with partition work and finish work as per plan. No change in use, egress, or occupancy.”
- Alteration, filed Aug 21, 2024, estimated cost $210K, described as “Replacement of 4 heat pumps on the roof with a total capacity of 60 tons. No change to egress, use, or occupancy.”
- Alteration, filed May 1, 2024, estimated cost $30K, described as “Interior renovation @ apt #17N only. Porpose general construction work as per plan filed herewith. No change in use, occupancy & egress.”
- Alteration, filed Jun 19, 2023, estimated cost $75K, described as “Replacement of roof mounted air conditioning unit. No change in use egress and occupancy.”
- Alteration, filed Feb 27, 2023, estimated cost $6K, described as “Interior renovation of existing ground floor commercial space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 16, 2023, estimated cost $175K, described as “Interior renovation of apartment 19H on 19TH floor. The renovation will revise the layout of the interior non-load bearing walls. New finishes and fixtures are proposed throughout. No change to use, egress, or occupancy.”
- Alteration, filed Jul 22, 2022, estimated cost $30K, described as “Interior renovation of apt 11V”
- Alteration, filed Jul 5, 2022, estimated cost $45K, described as “Renovation of existing apartment unit 23STU located on 23RD floor. Plumbing work. No change of use, occupancy or egress.”
- Alteration, filed Jul 5, 2022, estimated cost $245K, described as “Renovation of existing apartment units 23STU located on 23RD floor. Architectural partitions, doors, cabinetry, interior demolition. No change of use, occupancy or egress.”
- Alteration, filed Jul 5, 2022, estimated cost $10K, described as “Renovation of existing apartment unit 23STU located on 23RD floor. Mechanical work. No change of use, occupancy or egress.”
- Alteration, filed Oct 19, 2021, estimated cost $55K, described as “Combination of apartment 14G & 14H under TPPN 03/97. Interior renovations of non load bearing walls, kitchen, bathrooms and miscellaneous finishes. Plumbing scope to be filed as subsequent document. No change of use, egress or occupancy.”
- Alteration, filed Aug 5, 2021, described as “Pipe scaffolding installed per plans, no change in use, egress or occupancy”
- Alteration, filed Jun 18, 2021, estimated cost $20K, described as “Installation of pipe scaffolding”

9 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1011157503/30-west-63-street.

## Property taxes

- Assessment: $104,403,770
- 2026–27 tax: $11,899,905
- Market value (city estimate): $232,910,008
- Taxable value: $100,091,917
- Assessed land: $21,323,437
- Assessed improvements: $83,080,333
- Condo units with their own tax lots: 466

## Tax breaks

- Co-op and condo abatement, with no end date, a $337,341 credit this tax year.

## Zoning

C4-7: floor area ratio 15.36 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 8, 2026: $2,900,000, Apt 14N
- Aug 10, 2026: $3,931,888, Apt 16CD
- Aug 3, 2026: $5,095,543, Apt 31MNO
- Jul 13, 2026: $4,872,000, Apt 19CD
- Jul 1, 2026: $1,050,000, Apt 5W
- Jun 16, 2026: $1,275,000, Apt 11V
- Jun 3, 2026: $4,161,556, Apt 32FGH
- May 8, 2026: $2,125,000, Apt 15L
- Mar 17, 2026: $5,616,125, Apt 18BCD
- Feb 6, 2026: $2,680,000, Apt 25AB

The 10 most recent of 122 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 30 LINCOLN PLAZA (City Planning P1991M0016): Completed, decided Feb 23, 1996. 2ND MODIFICATION TO PERMIT THE RELOCATION OF A MOVIE SIGN\*THAT ADVERTISES CINEMA HOUSED IN THE EXISTING 32-STORY PLUS\*PENTHOUSE MIXED COMMERCIAL & RESIDENTIAL BLDG IN THE SPECIAL\*LINCOLN SQUARE DIST (POPS)
- 30 LINCOLN PLAZA IN LINCOLN SQUARE SPEC DIST (City Planning P1984M0580): Completed, decided Sep 28, 1990. 2ND MODIFICATION OF PREVIOUSLY GRANTED SPEC PERMIT REGARDING\*BROADWAY MALLS, PLAZA & COVERED PLAZA. BL1115. LOT47,43,22,\*17.(POPS)

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
