33 Central Park West, Manhattan
College · built c. 1914 · Block 1116, Lot 29.
Building permits
- Alteration, filed Mar 17, 2025, estimated cost $500K, described as “Replacement of air-cooled VRF air conditioning split systems. No change in use egress or occupancy.”
- Alteration, filed Feb 17, 2025, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Aug 16, 2023, estimated cost $260K, described as “Replacement of existing air conditioning unit with new on existing dunnage and connecting to existing duct on the 4th floor and 4th floor roof extension as per plans filed herewith.”
- Alteration, filed Nov 3, 2022, estimated cost $602K, described as “Plumbing work proposed for an existing educational facility. No change to use, occupancy or egress.”
- Alteration, filed Nov 2, 2022, estimated cost $8.3M, described as “Interior renovation at 1ST floor, 2ND floor, 3RD floor, 4TH floor, and 6TH floor. Exterior enclosure restoration at 6TH floor. No change to use, occupancy, or egress.”
- Alteration, filed Jul 28, 2022, estimated cost $15K, described as “Replacement of air-cooled condensing unit on the roof. No change in use egress or occupancy.”
- Alteration, filed May 27, 2022, estimated cost $1K, described as “Installation of temporary barricade with plywood fence as per plan. No change in use,egress or occupancy.”
- Alteration, filed May 27, 2022, estimated cost $1K, described as “Installation of temporary material hoist as per plan. No change in use,egress or occupancy.”
- Alteration, filed May 27, 2022, estimated cost $1K, described as “Installation of temporary work platform as per plan. No change in use,egress or occupancy.”
- Alteration, filed May 27, 2022, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Mar 15, 2022, estimated cost $10K, described as “Installation of 1-hour rated partitions to create a new mechanical room for new air handling unit in the basement as per plans filed herewith.”
- Alteration, filed Mar 15, 2022, estimated cost $1.1M, described as “Direct replacement of existing chiller OSP of rear courtyard, installation of a new air handling system in the basement as per plans filed herewith.”
- Alteration, filed Mar 4, 2022, estimated cost $134K, described as “Plumbing work proposed as per plans filed herewith for an existing educational facility. No change to use, occupancy or egress.”
- Alteration, filed Mar 3, 2022, estimated cost $1.1M, described as “Renovation of an existing educational facility as per plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed Jul 29, 2021, estimated cost $30K, described as “Steel beams installed for repair to existing egress stair”
- Alteration, filed Jul 27, 2021, estimated cost $60K, described as “Repair to existing egress stair”
- Alteration, filed Dec 19, 2019, estimated cost $4K, described as “Adding sign on existing facade as per plans filed herewith. No change to use, egress or occupancy.”
Property taxes
- Assessment
- $16,179,750
- Market value (city estimate)
- $35,955,000
- Taxable value
- $0
- Assessed land
- $7,425,000
- Assessed improvements
- $8,754,750
Tax breaks
- Nonprofit exemption (school), with no end date, about $1,755,179 a year below the full tax.
Zoning
R10A: floor area ratio 3.76 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of New York Society for Ethical Culture: Individual Landmark, Upper West Side/Central Park West Historic District (Historic District). 48 Landmarks Preservation Commission permits are on file.