# 147 Columbus Avenue, Manhattan

Commercial · built 1991 · Block 1119, Lot 1.

On Umarelli: https://umarelli.org/nyc/1011190001/80-west-67-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

## Building permits

- New Building — High-Rise, filed Apr 21, 2026, 423 units, 87 stories, early work permitted while the building plans are in review, described as “New Residential and Commercial Use Floors SC, C, 1-86, Roof, Bulkheads building; Includes 430 dwelling units and amenity spaces.”
- New Building — Tower, filed Nov 14, 2025, 58 units, 24 stories, early work permitted while the building plans are in review, described as “New 25-story residential building with subcellar, cellar, roof, and bulkheads. Includes 58 dwelling units and amenity spaces.”
- Alteration, filed Sep 22, 2026, estimated cost $25K, described as “Installation of construction fence for new building construction as per plans. No change in use occupancy or egress under this application. Construction fence shall comply with chapter 33 of the 2022 NYC building code.”
- Alteration, filed Feb 26, 2026, estimated cost $10K, described as “Installation of pylwood fence as per plans. Plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Sep 23, 2025, estimated cost $10K, described as “Installation of engineered enclosure system as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jul 7, 2025, estimated cost $125K, described as “Interior demolition at 10-story building in preparation of full demolition of building, filed under APPLICATION#M01179112-I1”
- Alteration, filed Jun 24, 2025, estimated cost $50K, described as “Partial demolition of west facade for hoist installation in preparation of full demolition of the building, filed under App# M01179112-I1”
- Alteration, filed Jun 24, 2025, estimated cost $10K, described as “Installation Of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 17, 2025, estimated cost $55K, described as “Modification of existing plumbing and standpipe work to accommodate demolition of building at 47 W 66th”
- Alteration, filed Jun 13, 2025, estimated cost $10K, described as “Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01180462-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.”
- Alteration, filed Jun 13, 2025, estimated cost $100K, described as “Installation of 300 psf sidewalk shed, pipe scaffold, pylwood fence, needle beam, roof protection and yodosks as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this…”
- Alteration, filed Jun 11, 2025, estimated cost $8K, described as “Partial demolition of facade on floors Lobby thru 11th Floor and slab demo on Lobby Level as required for construction hoist. This work is filed in conjunction with Full Demolition Application #M01180462-I1.”
- Demolition, filed Feb 24, 2025, estimated cost $4.6M, described as “Full demolition of 10 story structure using hand held and mechanical means to assist from within.”
- Alteration, filed Jul 6, 2021, estimated cost $50K, described as “Replacement of railing at 11TH floor roof area. No change to use egress or occupancy.”
- Alteration, filed Nov 5, 2020, estimated cost $497K, described as “Installation of heavy duty sidewalk shed during building alteration, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- No Work, filed Nov 25, 2019, described as “ABC Family Holiday Carnival Party”
- Alteration, filed Nov 12, 2019, estimated cost $47K, described as “Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Nov 12, 2019, estimated cost $416K, described as “Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.”

## Property taxes

- Assessment: $15,832,350
- 2026–27 tax: $1,633,432
- Market value (city estimate): $35,183,000
- Taxable value: $15,057,450
- Assessed land: $5,850,000
- Assessed improvements: $9,982,350

## Zoning

C4-7: floor area ratio 8.88 built, 10.00 allowed by base zoning.

## Recent sales

- Mar 18, 2022: $931,000,000, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Special Lincoln Square District Extension (City Planning 2020M0266): Zoning text change, Zoning map change, Noticed. This is an application by Landmark West! and Manhattan Community Board 7 for a zoning map amendment and a zoning text amendment to apply the use and bulk regulations of Special Lincoln Square District Subdistrict C to the ABC campus (Block…

## In the news

[Extell Files Permits for 1,198-Foot, 430-Unit Supertall at 80 West 67th Street on Manhattan’s Upper West Side](https://newyorkyimby.com/2026/04/extell-files-permits-for-1198-foot-430-unit-supertall-at-80-west-67th-street-on-manhattans-upper-west-side.html), New York YIMBY, Apr 25, 2026.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology