77 West 66th Street, Manhattan
Commercial · built 1988 · Block 1119, Lot 8.
Building permits
- Alteration, filed Apr 1, 2026, estimated cost $100K, described as “Installation of 300 psf sidewalk shed, pipe scaffold, pylwood fence, needle beam, roof protection and yodosks as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this…”
- Alteration, filed Nov 12, 2025, estimated cost $10K, described as “Installation of shoring system as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Sep 23, 2025, estimated cost $10K, described as “Installation of engineered enclosure system as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Sep 9, 2025, estimated cost $10K, described as “Installation of temporary roof protection as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 17, 2025, estimated cost $15K, described as “Filing for Temporary Standpipe conversion, Cut and Cap.”
- Alteration, filed Jul 10, 2025, estimated cost $10K, described as “Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 24, 2025, estimated cost $75K, described as “Interior demolition in preparation of full demolition of building, filed under APPLICATION#M01180489-I1”
- Alteration, filed Jun 24, 2025, estimated cost $50K, described as “Partial demolition for hoist installation in preparation of full demolition of the building, filed under App# M01180489-I1. Demolition includes part of east facade and 2nd floor”
- Alteration, filed Jun 24, 2025, estimated cost $75K, described as “Removal of glass windows in preparation of full demolition of the building, filed under App# M01180489-I”
- Alteration, filed Jun 24, 2025, estimated cost $75K, described as “Removal of rooftop equipment and associated dunnage framing in preparation of full demolition of the building, filed under App# M01180489-I1”
- Alteration, filed Jun 13, 2025, estimated cost $100K, described as “Installation of 300 psf sidewalk shed, pipe scaffold, pylwood fence, needle beam, roof protection and yodosks as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this…”
- Demolition, filed Feb 25, 2025, estimated cost $14.6M, described as “Full demolition of 22 story structure using hand held and mechanical equipment to assist.”
- Demolition, filed Feb 25, 2025, estimated cost $481K, described as “Full demolition of 22 story structure using hand held and mechanical equipment to assist”
- Alteration, filed Dec 1, 2020, estimated cost $444K, described as “Installation of heavy duty sidewalk shed during building alteration, filed separately. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Storage up to 25 psf permitted on…”
- Alteration, filed Oct 19, 2020, estimated cost $25K, described as “Replacement of existing plumbing triplex domestic water booster pump, and installation of all new domestic cold water piping as indicated on the drawings.”
- Alteration, filed Sep 2, 2020, estimated cost $29K, described as “Removal and Modification of existing sprinkler heads on the3rd floor. No change to egress use or occupancy.”
- Alteration, filed Nov 26, 2019, estimated cost $73K, described as “Replacement of two (2) chilled water computer room air conditioning (crac) units with new, including new piping trim. No change in the building's egress, use or occupancy.”
- Alteration, filed Aug 6, 2019, estimated cost $73K, described as “Replacement of two (2) chilled water computer room air conditioning (crac) units with new, including new piping trim. No change in the building's egress, use or occupancy.”
Property taxes
- Assessment
- $31,787,550
- 2026–27 tax
- $3,279,557
- Market value (city estimate)
- $70,639,000
- Taxable value
- $30,231,900
- Assessed land
- $10,700,550
- Assessed improvements
- $21,087,000
Zoning
C4-7: floor area ratio 10.44 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Mar 18, 2022: $931,000,000, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 1ST BATTERY ARMORY/MEDICAL ARMORY (City Planning P1990M0107): Completed, decided Sep 28, 1989. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 161
- Special Lincoln Square District Extension (City Planning 2020M0266): Zoning text change, Zoning map change, Noticed. This is an application by Landmark West! and Manhattan Community Board 7 for a zoning map amendment and a zoning text amendment to apply the use and bulk regulations of Special Lincoln Square District Subdistrict C to the ABC campus (Block…
In the news
Construction Awaits To Resume at 77 West 66th Street on Manhattan’s Upper West Side, New York YIMBY, Aug 28, 2026.