65 Central Park West, Manhattan
Co-op · 107 units · built c. 1927 · Block 1119, Lot 29.
Building permits
- Alteration, filed Oct 13, 2026, estimated cost $21K, described as “Installation of awnings at penthouse as per plans. No change in use, egress, or occupancy.”
- Alteration, filed Jul 17, 2026, estimated cost $71K, described as “Propose combination of two existing apartments (unit f, unit g) into one apartment per tppn #3/97 with general construction as shown on plan. No structural and no change in use, egress, or occupancy is proposed under this application.”
- Alteration, filed May 2, 2026, estimated cost $123K, described as “General construction to renovate apt 11D on the 11TH floor. Work will include new partitions & finishes, and new plumbing fixtures. No change in use, egress, or occupancy under this filing.”
- Alteration, filed Feb 11, 2026, estimated cost $80K, described as “Interior renovation of the kitchen area only in apartment #9A including removal of the ceiling and associated plumbing work. No change to the use, egress, or occupancy.”
- Alteration, filed Jan 16, 2026, estimated cost $150K, described as “Minor mechanical work as per plans. No change of use, egress or occupancy under this application.”
- Alteration, filed Jan 16, 2026, estimated cost $277K, described as “Interior renovation of an existing duplex, including partition changes. Exterior ac openings to be removed. No change of use, egress or occupancy under this application.”
- Alteration, filed Jan 16, 2026, estimated cost $50K, described as “Minor plumbing plans as per plans. No change of use, egress or occupancy under this application. Gc work filed under application# M01237827-I1 and mechanical work was filed under APPLICATION#M01237828-I1.”
- Alteration, filed Oct 11, 2025, estimated cost $160K, described as “Interior renovation of the existing apartment #10C including removal of non-structural partitions, minor new partitions, associated mechanical work, and new finishes. No change to the use, egress, or occupancy.”
- Alteration, filed Sep 24, 2025, estimated cost $340K, described as “Interior renovation of the existing apartment #7B including non-structural partition demolition and minor new partition work. No change to the use, egress, or occupancy.”
- Alteration, filed Aug 8, 2025, estimated cost $60K, described as “Replacement of air conditioning units and associated ducts/piping. No change in use, egress, and occupancy.”
- Alteration, filed Jul 22, 2025, estimated cost $68K, described as “Filing ALT-2 to renovate Apt 7F. Minor demo for new and enlarged openings between rooms. Upgrade Bathroom by removing tub and new shower. New toilets and sinks. New washer/dryer. 2 new thruwall AC Units. No change to use, egress or…”
- Alteration, filed Mar 31, 2025, estimated cost $1K, described as “Installation of sidewalk shed as per plans filed herewith. No change is use, egress or occupancy.”
- Alteration, filed Dec 27, 2024, estimated cost $404K, described as “Proposed renovation to the interior of apartment 9D. No change to use, egress, occupancy or bulk”
- Alteration, filed Oct 7, 2024, estimated cost $296K, described as “Formally filing alteration type ii for interior alteration to existing apartment. No change to use, egress, or occupancy is proposed.”
- Alteration, filed Jun 17, 2024, estimated cost $60K, described as “Installation of two (2) new 2-ton split AC system with through-wall condenser unit and related ductwork/piping as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 16, 2024, estimated cost $19K, described as “Replacing and installing new plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy under this appliaction. General construction filed separately”
- Alteration, filed Jun 16, 2024, estimated cost $149K, described as “Interior renovation of existing apt #12A on the 12th Floor. No change to use, egress or occupancy under this application. Plumbing and mechanical system works filed separately.”
- Alteration, filed Jun 16, 2024, estimated cost $30K, described as “Architectural exterior modifications to apartments 12A on the 12th Floor to install (2) thru-wall condensing units as per plans filed here with. No change in egress, occupancy, or use.”
- Alteration, filed Apr 23, 2024, estimated cost $150K, described as “Interior apartment combination of the existing penthouse apartment #17AD w/ 17C & minor alteration of apartment #17B on the 17TH floor including minor non-structural partition demolition and minor new partition work.”
- Alteration, filed Feb 12, 2024, estimated cost $35K, described as “Install 2 ptech units and bathroom ventalation at apt 5E. No change in use, egress or occupancy.”
- Alteration, filed Feb 5, 2024, estimated cost $12K, described as “Monir plumbing work in APT5E. Replace, replocate and install new plumbing fixtures. No gas work. No change in use, egress or occupancy.”
- Alteration, filed Feb 5, 2024, estimated cost $135K, described as “Interior renovation at APT5E. Remove and construction non-bearing or non-structural partitions. No change in use, egress or occupancy.”
- Alteration, filed Jan 24, 2024, described as “Renewal of SR23/1549”
- Alteration, filed Nov 13, 2023, estimated cost $70K, described as “Filing alt-2 to renovate apt.14E. Scope of work- demo of interior finishes, removal of partitions to create a new bathroom and add air conditioning. No change to use, egress or occupancy. Existing c of o does not need to be amended.”
- Alteration, filed Oct 27, 2023, estimated cost $20K, described as “Architectural modifications to unit #1D as per plans. No change to use, egress or occupancy.”
15 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $27,335,250
- 2026–27 tax
- $2,764,709
- Market value (city estimate)
- $60,745,000
- Taxable value
- $24,829,410
- Assessed land
- $6,795,000
- Assessed improvements
- $20,540,250
Tax breaks
- Co-op and condo abatement, with no end date, a $324,175 credit this tax year.
Zoning
R10A: floor area ratio 12.09 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Mar 3, 2026: $3,388,000
- Jan 30, 2026: $4,025,000
- Jul 28, 2025: $1,600,000
- May 2, 2025: $3,377,500
- Apr 3, 2025: $895,000
- Mar 10, 2025: $14,500,000
- Feb 18, 2025: $462,500
- Nov 14, 2024: $3,646,500
- Jul 15, 2024: $2,125,000
- Apr 30, 2024: $3,450,000
The 10 most recent of 44 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper West Side/Central Park West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.