49 West 72nd Street, Manhattan
Co-op · 69 units · built c. 1930 · Block 1125, Lot 2.
Building permits
- Alteration, filed Oct 2, 2024, estimated cost $3K, described as “Installation of a temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 24, 2024, estimated cost $71K, described as “Interior renovation of existing apartment. Remove and install non-structural partitions and finishes. Replace plumbing fixtures. No change in use, egress or occupancy”
- Alteration, filed Mar 21, 2024, estimated cost $203K, described as “Replace existing storefronts”
- Alteration, filed Mar 17, 2023, estimated cost $25K, described as “Plumbing work in (1) bathroom and the kitchenette filed in conjunction with the renovation of apartment #16B on the 16TH floor. No change in use, egress, or occupancy.”
- Alteration, filed Feb 20, 2023, estimated cost $41K, described as “Interior renovation of the existing apartment #16B on the 16TH floor including minor non-structural partition demolition, minor new partition work. No change in use, egress, or occupancy.”
- Alteration, filed Aug 9, 2022, estimated cost $12K, described as “Plumbing work for interior renovation of apt 5C”
- Alteration, filed Aug 9, 2022, estimated cost $88K, described as “Interior renovation to apartment 5C”
- Alteration, filed Nov 29, 2021, estimated cost $48K, described as “Replace fuel storage tank as per plans. No change in use, occupancy or egress.”
- Alteration, filed Aug 5, 2021, estimated cost $50K, described as “Create trench in the cellar for replacement of plumbing lines filed under M00528445.”
- Alteration, filed May 28, 2021, estimated cost $75K, described as “Replace underground storm piping in the cellar and open space, (Trenching under application #140960994) 8/2/21 PAA created to revise TR1, delete "Individual on-site private sewer disp[osal system" filed in error.”
- Alteration, filed Dec 16, 2020, described as “Installation of temporary fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 5, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $7,205,400
- 2026–27 tax
- $695,040
- Market value (city estimate)
- $16,012,000
- Taxable value
- $6,325,966
- Assessed land
- $1,566,000
- Assessed improvements
- $5,639,400
Tax breaks
- Co-op and condo abatement, with no end date, a $92,563 credit this tax year.
Zoning
R10A: floor area ratio 10.05 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 14, 2026: $615,000
- Jul 6, 2026: $655,000
- May 29, 2026: $1,175,000
- May 11, 2026: $770,000
- Aug 21, 2025: $399,037
- Jul 9, 2025: $676,700
- Jun 2, 2025: $725,000
- May 13, 2025: $890,000
- Dec 20, 2024: $2,100,000
- Nov 30, 2023: $680,000
The 10 most recent of 30 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper West Side/Central Park West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.