145 Central Park West, Manhattan
Co-op · 138 units · built c. 1890 · Block 1127, Lot 29.
Building permits
- Alteration, filed Sep 28, 2026, estimated cost $740K, described as “Interior renovation: Installation of new partitions, ceilings, doors, floors, millwork, finishes in Apartment #8C on the 8th floor. New masonry openings for thru-wall AC systems. No change to use, egress or occupancy.”
- Alteration, filed Apr 23, 2026, estimated cost $150K, described as “Interior renovation to unit 1B. Plumbing and mechanical work to be filed separate. No change to occupancy use or egress.”
- Alteration, filed Dec 4, 2025, estimated cost $117K, described as “Filing for interior demolition, general construction, a new penetration for a HVAC unit. No change in use, egress or occupancy.”
- Alteration, filed Oct 1, 2025, estimated cost $1K, described as “Installation of a material only hoist as per drawings. Hoist shall comply with ch #33 of the NYC bldg code. No change in use, occupancy or egress under this application.”
- Alteration, filed Sep 18, 2025, estimated cost $8K, described as “Installation of 300 psf sidewalk shed and storage materials on top as per plans. All equipment shall comply with chapter #33 of the NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Aug 14, 2025, estimated cost $52K, described as “Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Jul 18, 2025, estimated cost $307K, described as “Interior renovation and apartment combo per TPPN 3/97 including removal and installation of non-bearing partitions and related finishes; new thru wall openings on secondary facade as per plans filed herewith. No change to use, egress or…”
- Alteration, filed Mar 24, 2025, estimated cost $55K, described as “This alteration application is being filed for the exterior work on 11th & 12th floors. New thru wall outdoor air intake and condensing unit with louver on new masonry opening. There are no change in use, egress or occupancy under this…”
- Alteration, filed Mar 24, 2025, estimated cost $925K, described as “Interior renov. apt 12E, 11EE on 11th, 12th flrs. Combin. of apts 12E & 11EE via conv. stair to include new stair. Related apps M01191335, M01191238, M01191314. This combine of two apts conforming with TTPN 03/97. No change in use, egress…”
- Alteration, filed Mar 24, 2025, estimated cost $90K, described as “Filing herewith plumbing work for the renovation of apts 11EE & 12E at the address noted. In conjunction with GC application #'s M00191101, M01191238. There are no change in use, egress or occupancy under this application”
- Alteration, filed Mar 24, 2025, estimated cost $120K, described as “Herewith filing structural application as per plans submitted. In conjunction with gc application #'s M01191101, M01191238. No change in use, egress or occupancy.”
- Alteration, filed Mar 24, 2025, estimated cost $50K, described as “Herewith filing mechanical application for installation of HVAC equipment as per plans submitted. In conjunction with the gc application #'s M01191101, M01191238. No change in use, egress or occupancy.”
- Alteration, filed Sep 17, 2024, estimated cost $11K, described as “Herewith filing plumbing application as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed Sep 17, 2024, estimated cost $30K, described as “Herewith filing mechanical application as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed Aug 21, 2024, estimated cost $290K, described as “Herewith filing alterations to an existing dwelling unit 10A. General construction work as per plans submitted. There is no change to use, egress or occupancy.”
- Alteration, filed Aug 1, 2024, estimated cost $150K, described as “Interior renovation to apartment 6A. Plumbing work to be filed separate. No change to occupancy use or egress.”
- Alteration, filed Jan 5, 2024, estimated cost $945K, described as “Modifications to interior non-bearing partition layout and finishes within apt 6-c”
- Alteration, filed Dec 20, 2023, estimated cost $55K, described as “Herewith filing mechanical application as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed Dec 20, 2023, estimated cost $40K, described as “Herewith filing plumbing application as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed Dec 19, 2023, estimated cost $474K, described as “Herewith filing application for renovation of existing class "A" apartment as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed Oct 5, 2023, estimated cost $100K, described as “Convert medical office to residential apartment and relocate the previously existing convenience stair that connects apartments 1C and 2C.. No change in occupancy or egress, minor change in use.”
- Alteration, filed Sep 5, 2023, estimated cost $202K, described as “Plumbing work related to boiler installation. All work as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 11, 2023, estimated cost $25K, described as “Herewith plans for the installation of split system a/c units in Apt. 3D on the third floor (filed in conjunction with BIS #123823684. No change to use, egress or occupancy.”
- Alteration, filed May 12, 2023, estimated cost $9K, described as “Installation of a new air conditioning system for the gym expansion. No change in use, egress, or occupancy.”
- Alteration, filed May 11, 2023, estimated cost $104K, described as “Propose minor partition demolition @exg. Accessory fitness room storage room. Expand exg. Accessory tenant fitness room into storage space including minor partition and finish work. No change to use, egress, or occupancy.”
38 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $66,526,650
- 2026–27 tax
- $7,032,239
- Market value (city estimate)
- $147,837,000
- Taxable value
- $64,497,690
- Assessed land
- $13,915,800
- Assessed improvements
- $52,610,850
Tax breaks
- Co-op and condo abatement, with no end date, a $990,991 credit this tax year.
Zoning
R10A (part of the lot is R8B): floor area ratio 14.20 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 3, 2026: $14,500,000
- Feb 19, 2026: $14,740,000
- Feb 4, 2026: $9,500,000
- Sep 15, 2025: $4,450,000
- Jan 15, 2025: $925,000
- Dec 5, 2024: $3,350,000
- Jan 9, 2024: $4,995,000
- Nov 16, 2023: $3,075,000
- Aug 31, 2023: $3,500,000
- Jun 13, 2023: $4,450,000
The 10 most recent of 44 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of San Remo Apartments: Individual Landmark, Upper West Side/Central Park West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- SAN REMO APARTMENTS (City Planning P1987M0678): Completed, decided Jun 16, 1987. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 202