## Building permits

- Alteration, filed May 9, 2024, estimated cost $62K, described as “Interior renovation. Merging 10B with part of 10C and 10C with 10D in accordance with NYC DOB tppn #3/97.”
- Alteration, filed Mar 12, 2024, described as “Renewal for CD5 application SR 23/1686”
- Alteration, filed Jul 25, 2023, estimated cost $400K, described as “Masonry facade work as per plans including facade repairs and the removal and reinstallation of brick and flashing to address leaks at assorted locations. Provide probes in accordance with FISP requirements. No change to use, egress, or…”
- Alteration, filed Jul 12, 2023, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 20, 2023, estimated cost $291K, described as “Retrofit (2) existing burners and upgrade limitation. Change grade of fuel oil from #4 to #2. No change in means of egress, use group or occupancy.”
- Alteration, filed Apr 10, 2023, estimated cost $34K, described as “Replacement of HVAC mechanical split system. No change to use, occupancy or egress”
- Alteration, filed Nov 1, 2022, estimated cost $64K, described as “Herewith filing for plumbing modifications on the 7th floor (8th floor Marketing) and 8th floor (9th floor Marketing) to remove 3 sinks, 1 water closet, 1 lavatory, and provide 3 new sinks. No change in use, egress, or occupancy”
- Alteration, filed Nov 1, 2022, estimated cost $33K, described as “Renovation of a portion of the 7th floor construction (8th floor marketing) wet sprinkler system to accommodate architectural changes. No change in use, egress, or occupancy.”
- Alteration, filed Nov 1, 2022, estimated cost $65K, described as “Herewith filing for mechanical modifications on the 7th floor (8th floor marketing) of Mount Sinai West infusion center. No change in use, egress, or occupancy.”
- Alteration, filed Oct 26, 2022, estimated cost $1.1M, described as “Expand existing onsite testing Lab by adding adjacent existing soiled utility and toilet rooms convert exam rooms 2, 7&8 to private infusion rooms renovate exam room 1 and shared team room to 4 infusions cubicles convert check out area to…”
- Alteration, filed Jun 14, 2022, estimated cost $420K, described as “Install (1) new 7/10 gage stainless steel chimney liner in existing van packer concrete chimney. No change in means of egress, use group or occupancy.”
- Alteration, filed Feb 28, 2022, estimated cost $102K, described as “Garage floor topping slab patching and waterproofing as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Jun 25, 2021, estimated cost $2.2M, described as “Herewith filing for general construction modifications for oncology expansion on the 8TH floor (9th floor marketing). No change in use, egress, or occupancy.”
- Alteration, filed May 21, 2021, estimated cost $240K, described as “Installation of partition and doors. Cabinet replacement. No change in use, egress, or occupancy.”
- Alteration, filed Mar 18, 2021, described as “Pipe Scaffolding installed per plans, no change in use, egress or occupancy”
- Alteration, filed Mar 31, 2020, estimated cost $9K, described as “Mount Sinai - CV Starr Hand and Extremities - Installation of Temporary Sprinkler Loop as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 31, 2020, estimated cost $47K, described as “Mount Sinai - CV Starr Hand and Extremities - Sprinkler modifications as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 31, 2020, estimated cost $126K, described as “Mount Sinai - CV Starr Hands and Extremities - Plumbing modifications as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 31, 2020, estimated cost $861K, described as “Mount Sinai - CV Starr Hand & Extremities - Mechanical modifications including installation of equipment to the 3rd floor roof set back as per plans filed herewith. No change in use, egress, or occupancy.”

## Property taxes

- Assessment: $100,179,159
- 2026–27 Tax: $8,505,842
- Market value (city estimate): $222,620,359
- Taxable value: $69,280,107
- Assessed land: $15,391,799
- Assessed improvements: $84,787,360
- Condo units with their own tax lots: 12

## Tax breaks

- Nonprofit exemption (hospital), with no end date, about $410,729 a year below the full tax.
- Nonprofit exemption (charitable), with no end date, about $1,352,674 a year below the full tax.

## Zoning

C4-7: floor area ratio 25.68 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology