# 155 West 60th Street, Manhattan

College · built 1950 · Block 1132, Lot 20.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1011320020/155-west-60-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1132: https://umarelli.org/nyc/manhattan/1132.md

## Building permits

- Alteration, filed Oct 2, 2026, estimated cost $80K, described as “Respray of the SOFP. No change of use, egress or occupancy.”
- Alteration, filed Jul 20, 2026, estimated cost $900K, described as “Mechanical modifications as shown on plans.”
- Alteration, filed Jul 7, 2026, estimated cost $12K, described as “Renovation of Office of Disability Services on 4th floor, Lowenstein Hall, including the fireproofing of the steel associated with the abatement. No change of use, egress or occupancy.”
- Alteration, filed May 26, 2026, estimated cost $500K, described as “Architectural scope associated with the renovation of the Media & Communication Studios at Lowenstein Hall. No change of use, egress or occupancy.”
- Alteration, filed May 19, 2026, described as “Facade inspection”
- Alteration, filed Apr 30, 2026, estimated cost $100K, described as “Interior renovation of the existing cafe space to accommodate THE DROP EATERY as shown on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jan 6, 2026, described as “Facade inspection”
- Alteration, filed Jul 19, 2025, described as “Facade restoration / inspections”
- Alteration, filed Jul 8, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 9, 2025, estimated cost $369K, described as “McMahon Hall- FISP Cycle 8C Repairs, facade repairs including removal and replacement of cracked and spalled brick, replacement of deteriorated mortar joints, and miscellaneous concrete crack repairs. No change of use, egress or occupancy.”
- Alteration, filed May 21, 2025, estimated cost $125K, described as “Fireproofing of the steel. No change of use, egress or occupancy.”
- Alteration, filed Sep 17, 2024, estimated cost $2.3M, described as “Lowenstein Hall- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concrete deck and installation of a new perimeter guardrail. Facade repair-FISP CYCLE 8C. No change of use,…”
- Alteration, filed Aug 21, 2024, described as “Installation of outrigger & hoist for facade repair & inspection”
- Alteration, filed Jul 11, 2024, estimated cost $5K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- No Work, filed Jun 4, 2024, described as “Reception with food and beverage in a tent in the Fordham University Campus.”
- Alteration, filed May 17, 2024, estimated cost $625K, described as “Architectural scope for Lowenstein Hall, classrooms, and offices at the Basement Level. No change of use, egress, or occupancy.”
- No Work, filed Jun 6, 2023, described as “Reception with food and beverage in the Fordham Campus.”
- Alteration, filed Jun 23, 2022, estimated cost $30K, described as “New Lactation Room at the Fordham, Law School. No change of use, egressor occupancy.”
- No Work, filed Jun 8, 2022, described as “Reunion reception for Fordham university, with food and beverage.”
- Alteration, filed Apr 18, 2022, estimated cost $2.0M, described as “Architectural scope associated with the interior and exterior renovation of the existing Fitness Center at McMahon Hall. No change of use, egress or occupancy.”
- Alteration, filed Apr 14, 2022, estimated cost $175K, described as “Architectural scope associated with the renovation of the existing Employee Lounge at Fordham Law School. No change of use, egress or occupancy.”
- Alteration, filed Mar 7, 2022, estimated cost $50K, described as “Cap/removal of existing fuel generator, fuel tank, and associated piping. No change of use, egress, and occupancy.”
- Alteration, filed Aug 19, 2021, estimated cost $400, described as “Illuminated non advertising double sided projecting accessory sign - svk food hall. No change of use, egress or occupancy.”
- Alteration, filed Jul 14, 2020, estimated cost $97K, described as “Installation of sprinkler heads and relocation of plumbing piping as shown on drawings.”
- Alteration, filed Jul 14, 2020, estimated cost $749K, described as “Ductwork and installation of diffusers and terminal boxes.”

2 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1011320020/155-west-60-street.

## Building history

- Alteration, filed Jun 14, 2010, signed off Nov 14, 2014
- New Building — Tower, filed Nov 10, 2009, signed off Nov 5, 2020, 218 units, 23 stories
- Alteration, filed Aug 4, 1999, signed off May 11, 2001, described as “Convert part of 1ST floor meeting room to an office space, construct new partitions, all as per plans.”
- New Building — Tower, filed Mar 7, 1991, permit issued - entire job/work, 207 units, 20 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $183,285,450
- Market value (city estimate): $407,301,000
- Taxable value: $0
- Assessed land: $65,241,900
- Assessed improvements: $118,043,550

## Tax breaks

- Nonprofit exemption (college or university), with no end date, about $19,882,806 a year below the full tax.

## Zoning

C4-7: floor area ratio 5.27 built, 10.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Fordham University Passageway (City Planning P2012M0289): Completed, decided Oct 25, 2012. Special permit and modification to a restrictive declaration to facilitate the removal of the roof over a passageway between two new buildings.
- W.60TH & 62ND TRANSPARENCY MOD. (City Planning P2011M0215): Completed, decided Oct 7, 2011. 05DCP020M: FORDHAM UNIVERSITY PLANS TO EXPAND ITS FACILITIES AT ITS LIN COLN CENTER CAMPUS TO PROVIDE AOAUT 2.36 MILLION FT OF ADDIT IONAL GROSS FLOOR AREA
- FORDHAM UNIV LINCOLN CENTER CAMPUS (City Planning P2005M0206): Completed, decided Aug 31, 2009. 05DCP020M: FORDHAM UNIVERSITY PLANS TO EXPAND ITS FACILITIES AT ITS LIN COLN CENTER CAMPUS TO PROVIDE AOAUT 2.36 MILLION FT OF ADDIT IONAL GROSS FLOOR AREA
- FORDHAM UNIVERSITY (City Planning P2009M0110): Completed, decided Apr 22, 2009. 05DCP020M: FORDHAM UNIVERSITY PLANS TO EXPAND ITS FACILITIES AT ITS LIN COLN CENTER CAMPUS TO PROVIDE AOAUT 2.36 MILLION FT OF ADDIT IONAL GROSS FLOOR AREA
- FORDHAM DEVELOPMENT/LINCOLN SQ URA (City Planning P1988M0472): Completed, decided May 23, 1990

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
