161 West 61st Street, Manhattan
Condominium · 219 units · built 1988 · Block 1132, Lot 7501.
Building permits
- Alteration, filed Oct 7, 2026, estimated cost $261K, described as “General construction (no mechanical or structural) for the combination of adjacent apartments 14A and 14B. Plumbing work permitted separately. No change to use, egress or occupancy.”
- Alteration, filed Jul 27, 2026, estimated cost $29K, described as “Apartment renovation on 16th floor. 16A”
- Alteration, filed Jun 23, 2026, estimated cost $40K, described as “To propose interior renovation in unit #3F with general construction as per plan filed herewith. No change of use, egress or certificate of occupancy.”
- Alteration, filed Apr 1, 2026, estimated cost $205K, described as “Reconstruction of Kitchen and Bathrooms and other minor work to conform to the original approved plans DOB Job #122854143. No change to use, egress or occupancy.”
- Alteration, filed Dec 2, 2025, estimated cost $37K, described as “Interior renovation to unit 4H as indicated on the dwg's including kitchen alteration, bathroom, powder room reno & replacement of washer/dryer , new flooring throughout. there will be no change to use, occupancy and egress under this…”
- Alteration, filed Mar 25, 2025, estimated cost $25K, described as “Apt. 25C: general construction to include removal of existing finishes and fixtures in one bathroom, new construction to include new wall finishes, new fixtures, one new door, new lighting in one bathroom ; plumbing to filed as a…”
- Alteration, filed Feb 6, 2025, estimated cost $224K, described as “Combine apartments 20F and 20G per tppn 3/97, combine (2) existing kitchens into one kitchen and renovate, renovate (3) bathrooms, no work in powder ROOM5., convert (1) powder room into laundry room, new non-structural partitions, upgrade…”
- Alteration, filed Oct 7, 2024, estimated cost $434K, described as “Filing herewith interior renovation of existing 22nd floor apartment space, Apt 22C, Lease Wood Residence. No change in use, egress or occupancy.”
- Alteration, filed Oct 1, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Feb 22, 2024, described as “Renewal of SR23/0058”
- Alteration, filed Oct 4, 2023, estimated cost $25K, described as “Replace (1) tub, (1) toilet, (1) lavatory, (1) new washer & (1) laundry standpipe on existing roughing. Relocate (1) sink, (1) gas range & (1) dish washer. Provide (1) new shower at 21ST floor. Cap & remove (1) tub at 21ST floor”
- Alteration, filed Oct 4, 2023, estimated cost $79K, described as “Interior renovation of apartment 21C at 21ST floor. No change to egress, use or occupancy.”
- Alteration, filed Jun 28, 2023, estimated cost $36K, described as “Interior renovations to exist. Multi-family dwelling at unit 20H-20TH floor. Interior renovations include new flooring and finishes throughout. No change to egress, use or occupancy.”
- Alteration, filed Jun 27, 2023, estimated cost $5K, described as “Plumbing renovations to exist. Multi-family dwelling at unit 20H-20TH floor. Plumbing renovations include changing an existing tub to a shower. No change to egress, use or occupancy.”
- Alteration, filed May 22, 2023, estimated cost $23K, described as “Interior renovation to apartment 19H, work include update in kitchen and bathroom fixtures. No change in use, egress or occupancy.”
- Alteration, filed May 22, 2023, estimated cost $79K, described as “Interior renovation to apartment 19H, work include update in kitchen cabinets and bathroom. No change in use, egress or occupancy.”
- Alteration, filed Jan 11, 2023, estimated cost $50K, described as “Office layout has changed. Door for Office 1 has been removed. IT closet has been removed. Storage door has been removed. Existing ceiling has been removed and reinstalled with new ceiling tiles. Slatpanel for aesthetic decoration has been…”
- Alteration, filed Dec 1, 2022, estimated cost $75K, described as “Limited garage repairs. no change to egress, occupancy.”
- Alteration, filed Nov 27, 2022, estimated cost $747K, described as “Brick Replacement and concrete patching, including railing repair at all facade all floors, no change in use, occupancy or egress.”
- Alteration, filed Aug 16, 2022, estimated cost $14K, described as “Apt. 6G- replace and install plumbing fixtures, filed in conjunction with GC #M00782712”
- Alteration, filed Aug 16, 2022, estimated cost $105K, described as “Renovate Apt. 6G- relocate 1 (`) kitchen and one(1) bathroom, renovate one bath,”
- Alteration, filed Aug 10, 2022, estimated cost $240K, described as “Interior renovation of unit 26FG including relocation of interior non-load bearing partitions.”
- Alteration, filed Jul 25, 2022, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Feb 8, 2022, estimated cost $102K, described as “Interior renovation of existing office space removal and installation of non-load bearing partitions. No change in use, egress, or occupancy.”
- Alteration, filed Jan 11, 2022, estimated cost $10K, described as “Plumbing work of pat 31E on the 30TH floor. No change in use, egress, or occupancy under this application.”
4 more, older permits are in this building’s full list on the map.
Building history
- Alteration, filed Apr 3, 2012, permit issued - entire job/work, described as “Were are filing to amend the certificate of occupancy to show easement and maintenance agreement between lot 35 and lot 30 for the recreation deck and steps from the building on lot 35 over and to the private open space on lot 30.”
- Major Renovation — Conversion, filed Jun 12, 2001, signed off Aug 30, 2005, 221 units added, 40 stories, described as “Application for conversion of existing c ellar space to public garage us , in conjunction with application to cit y planning for special permit. Applicat on for zoning and egress only.”
- Alteration, filed Feb 22, 1995, plan exam - approved, described as “No work to be done under this appl. Combining of two apartments into one at 26TH floor.construction performed under appl.101005332.no change to use,egress or occupancy.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $38,503,802
- 2026–27 Tax
- $3,868,136
- Market value (city estimate)
- $85,564,000
- Taxable value
- $35,999,449
- Assessed land
- $7,778,691
- Assessed improvements
- $30,725,111
- Condo units with their own tax lots
- 221
Tax breaks
- Co-op and Condo Abatement, with no end date, a $395,805 credit this tax year.
Zoning
C4-7: floor area ratio 14.95 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 25, 2026: $1,412,000, Apt 30E
- Sep 14, 2026: $2,675,000, Apt 34B
- Aug 5, 2026: $1,100,000, Apt 15H
- Jul 29, 2026: $660,000, Apt 19D
- Sep 29, 2025: $1,525,000, Apt 33F
- Sep 25, 2025: $1,270,000, Apt 16A
- Sep 10, 2025: $1,150,000, Apt 5C
- Aug 12, 2025: $985,000, Apt 5E
- Jul 23, 2025: $667,500, Apt 16D
- Jul 2, 2025: $3,995,000, Apt 30FG
The 10 most recent of 99 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- ALFRED GARAGE (City Planning P2001M0142): Completed, decided Aug 29, 2001. 01DCP029M: SPECIAL PERMITS TO ALLOW THE CONSTRUCTION AND OPERATION OF A 140 CAR CAPACITY PUBLIC PARKING GARAGE