160 West 66th Street, Manhattan
Condominium · 343 units · built 1989 · Block 1137, Lot 7501.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Nov 24, 2026, estimated cost $1.3M, described as “Interior renovation of 2ND floor space including demolition andconstruction of non-load bearing partitions, lighting and finishes per plans filed herewith. No change of use, egress or occupancy.”
- Alteration, filed Oct 16, 2026, estimated cost $5.2M, described as “Filing for mechanical work at the 1st floor, 15th thru 62nd, roof. No change to use, egress, or occupancy.”
- Alteration, filed Apr 30, 2026, estimated cost $29K, described as “Minor renovation of existing apartment #43C on the 43th floor. plumbing work only”
- Alteration, filed Apr 28, 2026, estimated cost $190K, described as “Minor renovation of existing apartment #43C on the 43th floor. Architectural/ Construction work only”
- Alteration, filed Apr 28, 2026, estimated cost $30K, described as “Interior Plumbing work of existing apartment 46A on the 46th floor. Plumbing work only.”
- Alteration, filed Apr 28, 2026, estimated cost $190K, described as “Interior renovation of existing apartment 46A on the 46th floor architectural / construction work only.”
- Alteration, filed Feb 4, 2026, estimated cost $38K, described as “Add a partition to create a second bedroom. Adjust entry closet.”
- Alteration, filed Nov 11, 2025, estimated cost $124K, described as “Finishes and millwork replacement. Replacement of fixtures and appliances. Minor partition work.”
- Alteration, filed Nov 5, 2025, estimated cost $40K, described as “Finishes and millwork replacement. Replacement of fixtures and appliances. Minor partition work.”
- Alteration, filed Aug 5, 2025, estimated cost $200K, described as “Interior renoation and combination of apartments 41BC abd 41D per tppn #3/97. No change to use, egress or occupancy. Related plumbing application will be filed seperately by the plumber.”
- No Work, filed Jul 7, 2025
- Alteration, filed May 14, 2025, estimated cost $6K, described as “Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with building code, chapter 33. No changes in use, egress or occupancy.”
- Alteration, filed May 2, 2025, estimated cost $230K, described as “Bulkhead repairs”
- Alteration, filed Apr 21, 2025, estimated cost $85K, described as “Interior renovation of apartment 33B on the 33RD floor. No change in use, egress, or occupancy.”
- Alteration, filed Mar 12, 2025, estimated cost $200K, described as “Architectural and plumbing work to renovate the interior of duplex units #57C & #58C on the 52ND and 53RD floors. No change in use, egress, or occupancy.”
- Alteration, filed Feb 4, 2025, estimated cost $7K, described as “New fire-rated door in existing opening to the tenant suite on 6th. Part of the 6th floor changed from community Facility offices to studios, lounge, and accessory offices (same use group). Occupant load of the 6th floor increased from 120…”
- Alteration, filed Jan 28, 2025, estimated cost $1K, described as “Work includes protection & mechanical methods for demolition as depicted within drawings.”
- No Work, filed Jan 8, 2025, described as “Theatrical performance in the Clark studio, 7th floor. The studio has a PofA, the TPA is being filed due to a custom layout.”
- Alteration, filed Dec 20, 2024, estimated cost $1.8M, described as “Interior renovation of existing commercial space at 6th floor as shown on plans filed herewith. Also filed for installation of new convenience stair between the 5th and 6th floor. No change in use egress, use or occupancy proposed under…”
- Alteration, filed Dec 18, 2024, estimated cost $295K, described as “Interior renovations of partitions, ceilings and doors on existing 2nd floor archives space. No change in use, egress, or occupancy.”
- No Work, filed Nov 27, 2024, described as “Theatrical performance in the Clark studio, 7th floor. The studio has a PofA, the TPA is being filed due to a custom layout.”
- Alteration, filed Nov 21, 2024, estimated cost $8K, described as “Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2022 building codes, chapter 33. No change in use, egress or occupancy.”
- No Work, filed Nov 12, 2024, described as “Theatrical performance in the Clark studio, 7th floor. The studio has a PofA, the TPA is being filed due to a custom layout.”
- Alteration, filed Nov 7, 2024, estimated cost $123K, described as “Renovation of unit #42AB on the 42nd Floor. General construction and plumbing work types. No change in use, egress, or occupancy.”
- Alteration, filed Oct 31, 2024, estimated cost $55K, described as “Nonstructural demolition work as shown on plans filed herewith.”
53 more, older permits are in this building’s full list on the map.
Building history
- Alteration, filed Feb 8, 2006, signed off Dec 1, 2017, units 341 to 71
- Major Renovation — Conversion, filed Dec 26, 2003, signed off Jul 8, 2005, 344 units added, 56 stories, described as “To split apt.59C (55TH and 56TH construc tion floors) into 5 apartment interior partition and plumbing ork, new kitchens and bathrooms. Obtain amende cerrtificate of occupancy.”
- Alteration, filed Jun 15, 1998, permit issued - entire job/work, described as “Reduction in number of dormitory rooms to accomodate use.”
- Major Renovation — Conversion, filed May 15, 1996, signed off Apr 8, 1997, 289 units added, 56 stories, described as “Combine 2 apartments into 1. No work to be done. Work is bein g filed under APPL#101303974.”
- Major Renovation — Conversion, filed Mar 15, 1996, signed off Apr 2, 1997, 342 units added, 56 stories, described as “Remove existing and install new interior partitions and suspended ceilings, relocate existing an d remove existing plumbing piping and fixtures at portions of the 25TH const. Floor and combine apts. 29H & 29J on the 25TH const. Floor…”
- Major Renovation — Conversion, filed Mar 13, 1995, signed off Mar 15, 1996, 343 units added, 56 stories, described as “Remove existing and install new interior partitions and suspended ceilings, remove and cap plumbing fixtur es and install washer at apt. 49E& f on portion of 45TH fl. As shown on pla ns filed herewith. Combine apts. 49E& f as shown.”
- Major Renovation — Conversion, filed Dec 17, 1993, signed off Jan 13, 1998, 341 units added, described as “Remove existing & install new non load bearing partitions & suspended ceiling within apt 59A,b,c,d,on the 55TH and 56TH construction floor as shown on plans filed herewith.combine four (4) apartments 59A,b,c,d into one (1) apt.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $55,734,322
- Assessed land
- $13,845,160
- Assessed improvements
- $41,889,162
Tax breaks
- Co-op and Condo Abatement, with no end date, a $582,311 credit this tax year.
Zoning
C4-7: floor area ratio 13.95 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Oct 14, 2026: $1,999,000, Apt 56F
- Sep 30, 2026: $1,645,000, Apt 19B
- Sep 23, 2026: $895,000, Apt 24C
- Jun 18, 2026: $2,725,000, Apt 41E
- Jun 17, 2026: $1,755,000, Apt 19J
- Apr 27, 2026: $1,715,000, Apt 32D
- Mar 6, 2026: $3,150,000, Apt 46A
- Mar 3, 2026: $2,200,000, Apt 43C
- Jan 30, 2026: $1,850,000, Apt 17B
- Jan 26, 2026: $1,950,000, Apt 31B
The 10 most recent of 121 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- LINCOLN CENTER (City Planning P2005M0067): Completed, decided Dec 8, 2009. DEMAPPING MODIFICATION OF THE PUBLIC PL DESIGNATION &*REMOVAL OF REFERENCES TO A PEDESTRIAN BRIDGE & A BRIDGE*FOUNDATION EASEMENT
- LINCOLN CENTER (City Planning P2008M0209): Completed, decided Dec 8, 2009. DEMAPPING MODIFICATION OF THE PUBLIC PL DESIGNATION &*REMOVAL OF REFERENCES TO A PEDESTRIAN BRIDGE & A BRIDGE*FOUNDATION EASEMENT
- LINCOLN CENTER (City Planning P2005M0175): Completed, decided Jun 28, 2005. ACQUIRE EASEMENTS IN THE CENTER FOR ACCESS ROUTES, LANDINGS*& FIRE EGRESS PASSAGES IN CONNECTION WITH A NEW PEDESTRIAN*BRIDGE & A VEHICULAR TUNNEL IN THE LINCOLN SQUARE URA & DIST