171 West 71st Street, Manhattan
Co-op · 50 units · built c. 1902 · Block 1143, Lot 1.
Building permits
- Alteration, filed Jan 14, 2026, estimated cost $5K, described as “Install new 4 level supported scaffolding to allow the repair of the existing chimney liners as per plans, no change in use occupancy or egress”
- Alteration, filed Jul 31, 2025, estimated cost $6K, described as “Replacement of 2 existing fixtures.”
- Alteration, filed Jul 30, 2025, estimated cost $47K, described as “Renovation of kitchen at existing apartment”
- Alteration, filed Jun 17, 2025, estimated cost $185K, described as “General construction including minor partition, cabinetry and flooringremoval. New partitions and doors, new finishes, cabinetry and flooring as perplans supplied. No change to use, occupancy or egress”
- Alteration, filed May 2, 2025, estimated cost $124K, described as “Installation of new chimney liner within existing masonry chimney, boiler breeching, and concrete pad for fuel burner replacement. No change to use, egress, or occupancy.”
- Alteration, filed Mar 14, 2024, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 10, 2024, described as “Facade restoration. Inspection. New outriggers”
- Alteration, filed Dec 8, 2023, estimated cost $107K, described as “Alt2 for general construction work to be performed in unit 7/8B on the 7th and 8th floors. Subsequent plumbing and mechanical application to be filed. All in accordance with submitted plans no changes to use, egress, or occupancy under…”
- Alteration, filed Oct 26, 2023, estimated cost $64K, described as “Interior plumbing work in apartment 5A on the fifth floor. Filed in conjunction with M00904082 and M00904711. No change in use, egress or occupancy.”
- Alteration, filed Oct 26, 2023, estimated cost $83K, described as “Mechanical work in apartment 5A on the fifth floor, in conjunction with #M00904082 and M00943489. No change in use, egress, or occupancy.”
- Alteration, filed Oct 26, 2023, estimated cost $525K, described as “Interior renovation of apartment 5A on the 5TH floor, to include one masonry opening enlargement for new louver. Filed in conjunction with #M00943489 and M00904711. No change in use, egress or occupancy.”
- Alteration, filed Mar 2, 2023, estimated cost $5K, described as “Installation of temporary debris chute as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 2, 2023, estimated cost $4K, described as “Installation of temporary storage of materials as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 2, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 14, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 10, 2023, estimated cost $4K, described as “Installation of temporary betamax hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 16, 2022, estimated cost $767K, described as “Facade, masonry and exterior repairs including service roof replacement and penthouse roof repairs.”
- Alteration, filed Jun 10, 2022, estimated cost $86K, described as “Plumbing work related to the installation of one (1) new dual-fuel burner for existing boiler. No change to use, egress, or occupancy.”
- Alteration, filed Apr 7, 2022, estimated cost $128K, described as “Removal and installation of a condenser unit”
- Alteration, filed Aug 20, 2019, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans in conjunction with general construction. No change in use, egress or occupancy. Sidewalk shed shall comply with 2014 NYC building code, chapter 33.”
Property taxes
- Assessment
- $15,632,100
- 2026–27 Tax
- $1,546,731
- Market value (city estimate)
- $34,738,000
- Taxable value
- $14,890,390
- Assessed land
- $3,600,000
- Assessed improvements
- $12,032,100
Tax breaks
- Co-op and Condo Abatement, with no end date, a $303,274 credit this tax year.
Zoning
C4-6A (part of the lot is R8B): floor area ratio 9.74 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 22, 2026: $1,250,000
- Mar 16, 2026: $4,750,000
- Oct 16, 2024: $6,750,000
- Jun 27, 2024: $3,875,000
- Dec 20, 2023: $2,425,000
- Jun 7, 2023: $6,375,000
- May 15, 2023: $4,985,000
- Jan 4, 2023: $797,770
- Jun 28, 2022: $4,100,000
- Apr 11, 2022: $1,720,000
The 10 most recent of 13 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of The Dorilton: Individual Landmark, Upper West Side/Central Park West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.