119 West 71st Street, Manhattan
Co-op · 36 units · built c. 1913 · Block 1143, Lot 24.
Building permits
- Alteration, filed Aug 14, 2026, estimated cost $150K, described as “Demolition & removal of portions of existing finishes and non-structural elements. Closing up the dumbwaiter floor opening small patch of the slab. No change to occupancy, use or egress.”
- Alteration, filed Mar 11, 2026, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Mar 11, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 2, 2026, estimated cost $550K, described as “General plumbing modification for gas distribution as per plans filed herewith. No change to use, bulk, egress, or occupancy is proposed.”
- Alteration, filed Jan 14, 2026, estimated cost $38K, described as “The scope of work is to file the operation of AC-1 as the heating and air conditioning unit for the residence.(this will allow CON-ED to reconnect the gas to allow the unit to heat, since it was disconnected to perform repair work in the…”
- Alteration, filed Dec 3, 2025, estimated cost $84K, described as “General construction of unit 2B. Work includes removal & installation of cabinetry, finish material, installation of partitions, installation of plumbing fixtures and finishes as per plans submitted herewith. NO CHANGE TO USE, EGRESS, OR…”
- Alteration, filed Nov 13, 2025, estimated cost $63K, described as “Plumbing work in apartment 3C in conjunction with apt renovation in DOB now JOB#M01314103. No change in use, egress or occupancy.”
- Alteration, filed Nov 13, 2025, estimated cost $97K, described as “Renovate existing apartment, partitions, flooring, cabinetry, counters, doors, ceiling, fixtures & finishes. No change in use, egress or occupancy.”
- Alteration, filed Aug 17, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 26, 2023, estimated cost $11K, described as “Filing Cycle 8C FISP facade repairs. No change to use, egress or occupancy under this application.”
Building history
- Alteration, filed Feb 11, 2010, permit issued - entire job/work, units 37 to 38, described as “Herewith filing to refile an approved pre-bis alteration 243/86/ sd s bis job to obtain a final certificate of occupancy.scope of alt 243/86 is to convert e xisting penthouse laundry area into a one (1) class "a" apartment obtain final…”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $7,142,400
- 2026–27 Tax
- $662,608
- Market value (city estimate)
- $15,872,000
- Taxable value
- $6,260,540
- Assessed land
- $1,287,000
- Assessed improvements
- $5,855,400
Tax breaks
- Co-op and Condo Abatement, with no end date, a $115,241 credit this tax year.
Zoning
R8B: floor area ratio 7.23 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 28, 2026: $1,400,094
- Sep 9, 2026: $1,195,000
- Aug 21, 2025: $2,423,726
- Jun 23, 2023: $1,187,500
- Apr 20, 2023: $1,050,000
- Dec 7, 2021: $1,024,000
- Apr 15, 2021: $2,050,000
- Oct 29, 2019: $965,000
- Jun 12, 2019: $2,000,000
- Oct 1, 2018: $1,200,000
The 10 most recent of 20 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper West Side/Central Park West Historic District (Historic District). 45 Landmarks Preservation Commission permits are on file.