# 121 West 72nd Street, Manhattan

Co-op · 90 units · built c. 1926 · Block 1144, Lot 24.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1011440024/121-west-72-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1144: https://umarelli.org/nyc/manhattan/1144.md

## Building permits

- Alteration, filed Oct 12, 2026, estimated cost $83K, described as “Herewith filing for facade repairs for local law compliance as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 5, 2024, estimated cost $135K, described as “Interior apartment renovation of apt 8C, inclusive of non-load bearing partition changes as per plans filed herewith. Plumbing work filed under separate DOB now application. No change to bulk, egress, use or occupancy.”
- Alteration, filed Dec 6, 2022, estimated cost $90K, described as “Job filed to combine apartment 10D & 11D by same owner to comply TPP#397.”
- Alteration, filed Dec 6, 2021, estimated cost $130K, described as “Filing for the installation of interior partitions, ceilings, doors and finishes, install doors & frames as shown on drawings filed herewith. no change in use, egress or occupancy.”
- Alteration, filed Dec 1, 2021, estimated cost $25K, described as “Filing for the removal and installation of new plumbing fixtures and related piping.”
- Alteration, filed Oct 25, 2021, estimated cost $250K, described as “Facade repairs as indicated on the plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 14, 2021, estimated cost $5K, described as “Installation of 100' new sidewalk shed at 121 west 72 street manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Apr 22, 2021, estimated cost $50K, described as “Plumbing work on laundry on cellar as per plans filed herewith. Related gc application 123884706.”
- Alteration, filed Dec 23, 2020, estimated cost $16K, described as “Relocation of sprinkler heads as per plans filed herewith”
- Alteration, filed Jan 29, 2018, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”

## Building history

- Alteration, filed Oct 3, 2019, permit issued - entire job/work, described as “Alteration type 1 application for accessory laundry in the cellar as per plans filed herewith.”
- Major Renovation — Conversion, filed Jan 22, 1993, signed off Sep 16, 1994, 88 units added, 15 stories, described as “Combination of 2 class "a" apartment in existing multiple dwelling at 13TH floor (tenant 14)”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $10,135,350
- 2026–27 Tax: $988,770
- Market value (city estimate): $22,523,000
- Taxable value: $8,928,770
- Assessed land: $1,462,500
- Assessed improvements: $8,672,850

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $123,332 credit this tax year.

## Zoning

C4-6A: floor area ratio 12.18 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 21, 2026: $1,385,000
- Aug 12, 2026: $1,120,000
- Aug 27, 2025: $1,547,740
- Jan 31, 2025: $425,000
- Oct 2, 2024: $1,275,000
- May 23, 2024: $752,487
- Jan 12, 2024: $750,000
- Nov 15, 2023: $425,000
- Aug 28, 2023: $739,500
- Apr 27, 2023: $435,000

The 10 most recent of 30 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Upper West Side/Central Park West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
