125 West 73rd Street, Manhattan
Utility · built c. 1920 · Block 1145, Lot 17.
Building permits
- Alteration, filed Sep 23, 2025, estimated cost $507K, described as “Filing for partial foundation on grade, structural first floor framing and Roof Dunnage framing to support the NEW Emergency Generator Equipment.”
- Alteration, filed Sep 18, 2025, estimated cost $5K, described as “Installation of a temporary scaffold system as per plans in conjunction with general construction. No change in use, egress or occupancy. Scaffold installed in accordance with 2022 NYC building code, chapter 33.”
- Alteration, filed Sep 18, 2025, estimated cost $350K, described as “Hereby filing new generator , switchgear and related piping per plan filed herewith”
- Alteration, filed Sep 18, 2025, estimated cost $2.4M, described as “Hereby filing related architectural construction on basement, 1st and roof levels in support of replacement of rooftop emergency generator and associated equipment. No change to use, egress, or occupancy.”
- Alteration, filed Sep 12, 2025, estimated cost $1.0M, described as “Hereby filing an 8000gallon fuel storage tank for a new generator”
- Alteration, filed Sep 10, 2025, estimated cost $17K, described as “Hereby filing modification to existing sprinkler system. Existing piping and sprinkler head to be modified to accommodate new layout.”
- Alteration, filed May 19, 2025, estimated cost $379K, described as “Facade restoration including brick replaccement, mortar joint repointing, window sill replacement, lintel replacement and concrete patching as per plans submitted herewith. No change in use, occupancy or egress.”
- Alteration, filed Mar 17, 2025, described as “Installation of suspended scaffold for facade inspection/ repair.”
- Alteration, filed Oct 29, 2024, estimated cost $40K, described as “Plumbing work consistent with new rooftop cooling tower and associated equipment as shown on drawings. No change to egress, use, or occupancy.”
- Alteration, filed Oct 29, 2024, estimated cost $1.5M, described as “Mechanical work consistent with new rooftop cooling tower and associated equipment as shown on drawings. No change to egress, use, or occupancy.”
- Alteration, filed Oct 25, 2024, estimated cost $450K, described as “Structural work consistent with roof dunnage framing for new cooling tower as shown on drawings. No change to egress, occupancy, or use.”
- Alteration, filed Oct 24, 2024, estimated cost $900K, described as “General construction work consistent with new rooftop cooling tower and associated equipment as shown on drawings. No change to egress, occupancy, or use.”
- Alteration, filed Aug 26, 2024, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Jun 4, 2024, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy”
- Alteration, filed Mar 13, 2024, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Sep 29, 2023, estimated cost $7K, described as “Removal an d replacement of sprinkler heads at ceiling slab on 2nd floor. No change to use, egress or occupancy.”
- Alteration, filed Sep 29, 2023, estimated cost $350K, described as “Installation of AC unit with associated ductwork and piping on second floor. No roof work on this project. No change to use, occupancy or egress.”
- Alteration, filed Sep 29, 2023, estimated cost $475K, described as “General Construction work in relation to the installation of AC unit with associated duct and piping. No change to use, egress or occupancy.”
- Alteration, filed Aug 1, 2023, estimated cost $684K, described as “Replacement of AC Units with associated piping on sixth floor and replacement of rooftop pump packages associated with existing dry coolers as per plans filed herewith.”
- Alteration, filed Aug 1, 2023, estimated cost $220K, described as “General Construction work consistent with removal of AC units and replacement of pump packages on 6th floor and roof. No change to use, egress or occupancy.”
- Alteration, filed Sep 13, 2022, estimated cost $667K, described as “A facade restoration project conisting of masonry replacement, masonry repointing, window sill replacement, window lintel replacement, and window lintel scrape prime and paint. No change in use, occupancy or egress.”
- Alteration, filed Aug 3, 2022, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
- Alteration, filed Mar 17, 2022, estimated cost $70K, described as “Removal and installation as shown in drawings filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 17, 2022, estimated cost $202K, described as “Removal and installation of mechanical equipment, related piping and ductwork.”
- Alteration, filed Nov 28, 2018, estimated cost $47K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application”
Zoning
R8B: floor area ratio 0.00 built, 4.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Upper West Side/Central Park West Historic District (Historic District). 40 Landmarks Preservation Commission permits are on file.